Back to kitchen remodel contractors
Sneed & Co Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Mar 2000 to Jul 2026
- Last 24 months
- 9 permits filed
110 permits since 2000: 67 completed, 1 in progress, 26 never finaled, 16 expired or cancelled.
Of the 26 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 6 completed, 2 never finaled, 4 expired or cancelled. Typically 12 days from filing to permit and 347 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 237 Lexington St | unit #a: replace approx 300 sq ft water damage sheet rock. ground floor unit in kitchen and bathroom.Details
unit #a: replace approx 300 sq ft water damage sheet rock. ground floor unit in kitchen and bathroom. | $15,000 |
| Mar 5, 2021 | Completed final sign-off Nov 2022 | 124 Columbus Av | interior remodel of (e) restaurant and bar at 1st, 2nd and bsmt floors. no work at (e) 3/f office ste.1/f-remodel (e) bar and bathroom.2/f-remodel (e) commercial kitchen and bathroom. bsmt-remodel (e) bar, stage and bathrooms. add new commercial kithcen and dishwash area. no exterior work previousDetails
interior remodel of (e) restaurant and bar at 1st, 2nd and bsmt floors. no work at (e) 3/f office ste.1/f-remodel (e) bar and bathroom.2/f-remodel (e) commercial kitchen and bathroom. bsmt-remodel (e) bar, stage and bathrooms. add new commercial kithcen and dishwash area. no exterior work previous | $400,000 |
| Nov 25, 2020 | Expired or cancelled expired Aug 2024 | 110 Connecticut St | remodel bath & kitchen in-kind. no change in wall & opening layout.Details
remodel bath & kitchen in-kind. no change in wall & opening layout. | $20,000 |
| Feb 28, 2020 | Expired or cancelled withdrawn Aug 2020 | 110 Connecticut St | revision to permit #201606210503, including kitchen remoe, add new master bath, adjust rear windows and door locations, replace 2 non-street facing windows, add wet bar and closet at lower floor.Details
revision to permit #201606210503, including kitchen remoe, add new master bath, adjust rear windows and door locations, replace 2 non-street facing windows, add wet bar and closet at lower floor. | $85,000 |
| Jan 29, 2020 | Completed final sign-off Nov 2022 | 124 Columbus Av | soft demolition of interior non-bearing partitions. remove existing flooring, light fixtures, restroom fixtures and kitchen equipment. ab-017.Details
soft demolition of interior non-bearing partitions. remove existing flooring, light fixtures, restroom fixtures and kitchen equipment. ab-017. | $9,500 |
| Nov 7, 2019 | Expired or cancelled expired Feb 2024 | 40 Saint Elmo Wy | renovate e sfd. excavate e basement to create new guest bdrm and bath, stairs to 1st fl renovate e kitchen and dining rm. replace flooring upper fl sunroom. install elevator retrofit, decking rear yard. windows maher not reqDetails
renovate e sfd. excavate e basement to create new guest bdrm and bath, stairs to 1st fl renovate e kitchen and dining rm. replace flooring upper fl sunroom. install elevator retrofit, decking rear yard. windows maher not req | $242,250 |
| Aug 19, 2019 | Expired or cancelled expired Feb 2024 | 40 Saint Elmo Wy | remodel kitchen in kind approx 75 sqftDetails
remodel kitchen in kind approx 75 sqft | $15,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 3488 22nd St | unit 6: remodel kitchen in-kind approx 60 sq. ft., no change of (e) floor planDetails
unit 6: remodel kitchen in-kind approx 60 sq. ft., no change of (e) floor plan | $20,000 |
| Sep 19, 2018 | Completed final sign-off Apr 2019 | 111 Rhode Island St | suite c interior t.i. improvement for bath and kitchen showroom, including construction of non load bearing partitions, owner provided fixture disply and staff office. partitions. install new exterior tenant signage, mechanical & sprinkler under sep permitDetails
suite c interior t.i. improvement for bath and kitchen showroom, including construction of non load bearing partitions, owner provided fixture disply and staff office. partitions. install new exterior tenant signage, mechanical & sprinkler under sep permit | $185,000 |
| Feb 28, 2014 | Completed final sign-off Feb 2015 | 1750 Taylor St | interior remodel. convert existing living room into master bedroom, remodel kitchen, add 1 hour rated door between unit 804 and 805. limited demo and lightingDetails
interior remodel. convert existing living room into master bedroom, remodel kitchen, add 1 hour rated door between unit 804 and 805. limited demo and lighting | $30,000 |
| Feb 14, 2014 | Completed final sign-off Feb 2015 | 1750 Taylor St | replace (e) kitchen appliances, add bar ht. counter, add opening between living room & dining room, restore double side fireplace by removing 1 side of sheetrock, replace (e) counter inbath #1, add new shower door & rain shower head. add new door to master bathroom, reconfigure master closet,Details
replace (e) kitchen appliances, add bar ht. counter, add opening between living room & dining room, restore double side fireplace by removing 1 side of sheetrock, replace (e) counter inbath #1, add new shower door & rain shower head. add new door to master bathroom, reconfigure master closet, | $64,000 |
| Aug 27, 2013 | Never finaled issued Sep 2013, no final | 237 Lexington St | interior remodel new kitchen cabinets, flrs & electrical. remove prop line windows & infill w/1 hour construction per plan. replace in kind (e) property line windows as shown on plans. remove & replace (e) non prop line windows as shown. install new beam & remove bearing wallDetails
interior remodel new kitchen cabinets, flrs & electrical. remove prop line windows & infill w/1 hour construction per plan. replace in kind (e) property line windows as shown on plans. remove & replace (e) non prop line windows as shown. install new beam & remove bearing wall | $32,000 |