Back to bathroom remodel contractors
Sneed & Co Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Mar 2000 to Jul 2026
- Last 24 months
- 9 permits filed
110 permits since 2000: 67 completed, 1 in progress, 26 never finaled, 16 expired or cancelled.
Of the 26 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 8 completed, 1 never finaled, 5 expired or cancelled. Typically 27 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | Completed final sign-off Mar 2026 | 237 Lexington St | bathroom remodel. replace tile on walls & floor. dry rot repair at door jambs, new shower pan, replace plumbing fixtures in same ocation. install new electrical outlet & dedicated circut for toilet bidet seat.Details
bathroom remodel. replace tile on walls & floor. dry rot repair at door jambs, new shower pan, replace plumbing fixtures in same ocation. install new electrical outlet & dedicated circut for toilet bidet seat. | $50,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 110 Connecticut St | to comply with nov# 202536780: clarification of work under previous permits. bath remodel, adjustment of rear window, and door locaitons. replace garage door, add wet bar and closet at lower floor. ref pa# 202504013464.Details
to comply with nov# 202536780: clarification of work under previous permits. bath remodel, adjustment of rear window, and door locaitons. replace garage door, add wet bar and closet at lower floor. ref pa# 202504013464. | $90,000 |
| Apr 10, 2025 | Expired or cancelled expired Sep 2026 | 914 Capitol Av | altered site permit #201910013220. scope includes addition to the rear of the house including 1/f storage room. 2/f bedroom, full bath, & laundry. legalize of (e) structure built prior to current owner.Details
altered site permit #201910013220. scope includes addition to the rear of the house including 1/f storage room. 2/f bedroom, full bath, & laundry. legalize of (e) structure built prior to current owner. | |
| Mar 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in barDetails
mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in bar | |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 237 Lexington St | unit #a: replace approx 300 sq ft water damage sheet rock. ground floor unit in kitchen and bathroom.Details
unit #a: replace approx 300 sq ft water damage sheet rock. ground floor unit in kitchen and bathroom. | $15,000 |
| Jan 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | alteration to issued permit#2022-0922-2957 to revise bathroom layout.Details
alteration to issued permit#2022-0922-2957 to revise bathroom layout. | |
| Sep 22, 2022 | Completed final sign-off Feb 2024 | 891 Bush St | expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferredDetails
expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferred | $100,000 |
| Mar 5, 2021 | Completed final sign-off Nov 2022 | 124 Columbus Av | interior remodel of (e) restaurant and bar at 1st, 2nd and bsmt floors. no work at (e) 3/f office ste.1/f-remodel (e) bar and bathroom.2/f-remodel (e) commercial kitchen and bathroom. bsmt-remodel (e) bar, stage and bathrooms. add new commercial kithcen and dishwash area. no exterior work previousDetails
interior remodel of (e) restaurant and bar at 1st, 2nd and bsmt floors. no work at (e) 3/f office ste.1/f-remodel (e) bar and bathroom.2/f-remodel (e) commercial kitchen and bathroom. bsmt-remodel (e) bar, stage and bathrooms. add new commercial kithcen and dishwash area. no exterior work previous | $400,000 |
| Nov 25, 2020 | Expired or cancelled expired Aug 2024 | 110 Connecticut St | remodel bath & kitchen in-kind. no change in wall & opening layout.Details
remodel bath & kitchen in-kind. no change in wall & opening layout. | $20,000 |
| Feb 28, 2020 | Expired or cancelled withdrawn Aug 2020 | 110 Connecticut St | revision to permit #201606210503, including kitchen remoe, add new master bath, adjust rear windows and door locations, replace 2 non-street facing windows, add wet bar and closet at lower floor.Details
revision to permit #201606210503, including kitchen remoe, add new master bath, adjust rear windows and door locations, replace 2 non-street facing windows, add wet bar and closet at lower floor. | $85,000 |
| Nov 7, 2019 | Expired or cancelled expired Feb 2024 | 40 Saint Elmo Wy | renovate e sfd. excavate e basement to create new guest bdrm and bath, stairs to 1st fl renovate e kitchen and dining rm. replace flooring upper fl sunroom. install elevator retrofit, decking rear yard. windows maher not reqDetails
renovate e sfd. excavate e basement to create new guest bdrm and bath, stairs to 1st fl renovate e kitchen and dining rm. replace flooring upper fl sunroom. install elevator retrofit, decking rear yard. windows maher not req | $242,250 |
| Sep 19, 2018 | Completed final sign-off Apr 2019 | 111 Rhode Island St | suite c interior t.i. improvement for bath and kitchen showroom, including construction of non load bearing partitions, owner provided fixture disply and staff office. partitions. install new exterior tenant signage, mechanical & sprinkler under sep permitDetails
suite c interior t.i. improvement for bath and kitchen showroom, including construction of non load bearing partitions, owner provided fixture disply and staff office. partitions. install new exterior tenant signage, mechanical & sprinkler under sep permit | $185,000 |
| Jun 21, 2016 | Expired or cancelled expired Aug 2024 | 110 Connecticut St | (n) addition & remodel of unit #110 including: replace (e) exterior stair w/ (n) interior stair; 2nd fl addition & 1st fl infill. (n) bathroom @ 1st fl, (n) interior stair for attic access, (n) deck w/ property line parapet wall, replace (e) fence & install (n) vehicle gate.Details
(n) addition & remodel of unit #110 including: replace (e) exterior stair w/ (n) interior stair; 2nd fl addition & 1st fl infill. (n) bathroom @ 1st fl, (n) interior stair for attic access, (n) deck w/ property line parapet wall, replace (e) fence & install (n) vehicle gate. | $40,000 |
| Feb 14, 2014 | Completed final sign-off Feb 2015 | 1750 Taylor St | replace (e) kitchen appliances, add bar ht. counter, add opening between living room & dining room, restore double side fireplace by removing 1 side of sheetrock, replace (e) counter inbath #1, add new shower door & rain shower head. add new door to master bathroom, reconfigure master closet,Details
replace (e) kitchen appliances, add bar ht. counter, add opening between living room & dining room, restore double side fireplace by removing 1 side of sheetrock, replace (e) counter inbath #1, add new shower door & rain shower head. add new door to master bathroom, reconfigure master closet, | $64,000 |