Back to kitchen remodel contractors
Skylight Tools Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Apr 2021
- Last 24 months
- 0 permits filed
49 permits since 2000: 39 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 18 completed, 4 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 224 Scott St | kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2Details
kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2 | $43,000 |
| Mar 24, 2021 | Expired or cancelled withdrawn Jul 2022 | 1650 Quesada Av | kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same locationDetails
kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same location | $75,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 7033 Geary Bl | cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switchesDetails
cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches | $42,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 446 20th Av | unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.Details
unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations. | $74,000 |
| Jan 14, 2021 | Completed final sign-off Jun 2021 | 1101 Pacific Av | kitchen remodel. keep e oven, dishwasher, cooktop, refrig in same location. replace cabinetry, cntrtop, sink, fixtures in same location. replace switches, outlets, lightingDetails
kitchen remodel. keep e oven, dishwasher, cooktop, refrig in same location. replace cabinetry, cntrtop, sink, fixtures in same location. replace switches, outlets, lighting | $30,000 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 603 Natoma St | kitchen and bath remodel. no layout changes. kitchen in same location. keep e range & hood, replace dishwasher, sink and fixtures, keep frig, replace switches, lighting,outlets. bath same location. replace bath and fixtures, vanity, toilet all in kind. replace exhaust fan, lighting, switches, outletDetails
kitchen and bath remodel. no layout changes. kitchen in same location. keep e range & hood, replace dishwasher, sink and fixtures, keep frig, replace switches, lighting,outlets. bath same location. replace bath and fixtures, vanity, toilet all in kind. replace exhaust fan, lighting, switches, outlet | $45,000 |
| Dec 14, 2020 | Never finaled issued Feb 2021, no final | 178 San Carlos St | kitchen remodel with fixture relocation, replace cabinetry, countertop & flooring. relocate gas range, sink & dw. exhaust to exterior new range location. new lighting, dedicated circuits, replace & add switches & receptacles.Details
kitchen remodel with fixture relocation, replace cabinetry, countertop & flooring. relocate gas range, sink & dw. exhaust to exterior new range location. new lighting, dedicated circuits, replace & add switches & receptacles. | $30,000 |
| Dec 7, 2020 | Never finaled issued Dec 2020, no final | 500 43rd Av | cosmetic kitchen remodel. remove and replace cabinetry, sink and fixuters, cooktop, dishwashers, flooring, in-kind and same location. replace 2nd level street facing esterior door with custom double sliding glass doorDetails
cosmetic kitchen remodel. remove and replace cabinetry, sink and fixuters, cooktop, dishwashers, flooring, in-kind and same location. replace 2nd level street facing esterior door with custom double sliding glass door | $25,000 |
| Nov 23, 2020 | Never finaled issued Jan 2021, no final | 8332 Geary Bl | remodel kitchen with non-structural & structural wall removals. r/r appliances to new location; r/r range in same location, new exhaust vent. electrical panel upgrades and add 2 ded ckts, new lighting plan, add/replace plugs/switches.Details
remodel kitchen with non-structural & structural wall removals. r/r appliances to new location; r/r range in same location, new exhaust vent. electrical panel upgrades and add 2 ded ckts, new lighting plan, add/replace plugs/switches. | $60,000 |
| Nov 3, 2020 | Completed final sign-off May 2021 | 466 Orizaba Av | kitchen & bathroom remodel: r/r appliances & fixturs in same location; new lighting.master bathroom: non-structural wall modifcations to increase footprint from 36sf to 37sf for larger vanity & new fixtures in new location, replace shower in kind. replace door with pocket door. 1/2 bath mod.Details
kitchen & bathroom remodel: r/r appliances & fixturs in same location; new lighting.master bathroom: non-structural wall modifcations to increase footprint from 36sf to 37sf for larger vanity & new fixtures in new location, replace shower in kind. replace door with pocket door. 1/2 bath mod. | $70,000 |
| Oct 23, 2020 | Never finaled issued Dec 2020, no final | 479 33rd Av | kitchen remodel: relocate 9e) range and d/w.r/r kitchen sink along same locate, relocate (e) fridge and isntall new water line.replace 2 side facing windows in-kind. replace flooring and cabinets. add new recessed lights, replacemnt and additoin of new outlets and switches.Details
kitchen remodel: relocate 9e) range and d/w.r/r kitchen sink along same locate, relocate (e) fridge and isntall new water line.replace 2 side facing windows in-kind. replace flooring and cabinets. add new recessed lights, replacemnt and additoin of new outlets and switches. | $30,000 |
| Oct 22, 2020 | Completed final sign-off Aug 2021 | 898 Waller St | kitchen & 2 bath remodel plus laundry rm. kitchen- replace cabs, fixtures, appliances, (n) lights & circuits. bath rm- add toilet & (n) exhaust fan, replace shower tub combo. powerd rm- replace all fixtures except toilet. relocate 1 washerDetails
kitchen & 2 bath remodel plus laundry rm. kitchen- replace cabs, fixtures, appliances, (n) lights & circuits. bath rm- add toilet & (n) exhaust fan, replace shower tub combo. powerd rm- replace all fixtures except toilet. relocate 1 washer | $40,000 |
| Sep 30, 2020 | Completed final sign-off Jul 2021 | 1570 11th Av | kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same areaDetails
kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same area | $80,000 |
| Aug 31, 2020 | Completed final sign-off Mar 2021 | 72 Littlefield Tr | cosmetic kitchen remodel with non-structural wall removal between kitchen and living room. keep existing appliances. replace cabinetry, flooring, countertops, & faucets. add new lighting in living room and replace lighting throughout house.Details
cosmetic kitchen remodel with non-structural wall removal between kitchen and living room. keep existing appliances. replace cabinetry, flooring, countertops, & faucets. add new lighting in living room and replace lighting throughout house. | $57,000 |
| Aug 22, 2020 | Completed final sign-off May 2021 | 1879 43rd Av | remodel kitchen: remove non-structural wall and replace cabinetry, sink, and dishwasher in same location. remodel bathroom: remoe and replace vanity, tub/shower. toilet will be replaced and relocated. existing standing shower removed.Details
remodel kitchen: remove non-structural wall and replace cabinetry, sink, and dishwasher in same location. remodel bathroom: remoe and replace vanity, tub/shower. toilet will be replaced and relocated. existing standing shower removed. | $45,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2021 | 150 Page St | apt 35 aka 306: interior renovation of existing kitchen and two 3-piece bathrooms in-kind.. addition of a washing machine in existing kitchen, new dedicated circuits, lighting fixtures and exhaust fans.Details
apt 35 aka 306: interior renovation of existing kitchen and two 3-piece bathrooms in-kind.. addition of a washing machine in existing kitchen, new dedicated circuits, lighting fixtures and exhaust fans. | $68,000 |
| Mar 12, 2020 | Completed final sign-off Nov 2020 | 400 Beale St | unit 1505. kitchen 100 sq ft and bathroom 68 sq ft remodels.Details
unit 1505. kitchen 100 sq ft and bathroom 68 sq ft remodels. | $30,800 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 3478 22nd St | kitchen, bathroom and laundery remodelDetails
kitchen, bathroom and laundery remodel | $36,700 |
| Feb 20, 2020 | Completed final sign-off Feb 2022 | 346 01st St | unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.Details
unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft. | $46,000 |
| Feb 20, 2020 | Completed final sign-off Sep 2020 | 741 Clement St | kitchen remodel for unit #201Details
kitchen remodel for unit #201 | $15,100 |
| Jan 14, 2020 | Completed final sign-off Dec 2020 | 1050 North Point St | kitchen remodel- like for like replacement. replace flooring throughout unit. no moving of wallsDetails
kitchen remodel- like for like replacement. replace flooring throughout unit. no moving of walls | $17,000 |
| Dec 9, 2019 | Completed final sign-off Oct 2020 | 301 Bryant St | unit #601: kitchen and 2 bath remodel. kitchen replace all fixtures, sink, floor, keep appliances. master bath - replace all fixtures, toilet, vanity, shower expanded. shower wall removed. hall bath remodel - replace all fixtures, toilet, vanity, replace tub w/ showerDetails
unit #601: kitchen and 2 bath remodel. kitchen replace all fixtures, sink, floor, keep appliances. master bath - replace all fixtures, toilet, vanity, shower expanded. shower wall removed. hall bath remodel - replace all fixtures, toilet, vanity, replace tub w/ shower | $49,500 |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 53 Oakwood St | kitchen & hallway remodel update and remodel in kitchen backsplash will be updates. for hallway bathroom the flooring, countertop, toilet and all plumbing fixtures will be replaces/. replacing (e) vanity light fixture and adding recessed lights. no change of (e) floor plan.Details
kitchen & hallway remodel update and remodel in kitchen backsplash will be updates. for hallway bathroom the flooring, countertop, toilet and all plumbing fixtures will be replaces/. replacing (e) vanity light fixture and adding recessed lights. no change of (e) floor plan. | $21,000 |