Back to bathroom remodel contractors
Skylight Tools Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Apr 2021
- Last 24 months
- 0 permits filed
49 permits since 2000: 39 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 32 completed, 1 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 224 Scott St | kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2Details
kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2 | $43,000 |
| Mar 24, 2021 | Expired or cancelled withdrawn Jul 2022 | 1650 Quesada Av | kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same locationDetails
kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same location | $75,000 |
| Mar 12, 2021 | Completed final sign-off Aug 2021 | 8 Clayton St | remodel 2 bathrooms in kind. replace all plumbing fixtures. no layout change.Details
remodel 2 bathrooms in kind. replace all plumbing fixtures. no layout change. | $35,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 7033 Geary Bl | cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switchesDetails
cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches | $42,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 446 20th Av | unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.Details
unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations. | $74,000 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 603 Natoma St | kitchen and bath remodel. no layout changes. kitchen in same location. keep e range & hood, replace dishwasher, sink and fixtures, keep frig, replace switches, lighting,outlets. bath same location. replace bath and fixtures, vanity, toilet all in kind. replace exhaust fan, lighting, switches, outletDetails
kitchen and bath remodel. no layout changes. kitchen in same location. keep e range & hood, replace dishwasher, sink and fixtures, keep frig, replace switches, lighting,outlets. bath same location. replace bath and fixtures, vanity, toilet all in kind. replace exhaust fan, lighting, switches, outlet | $45,000 |
| Jan 13, 2021 | Completed final sign-off Mar 2021 | 1434 La Playa | revision to pa 202009023218. single bathroom remodel. front windows are no longer being replaced.Details
revision to pa 202009023218. single bathroom remodel. front windows are no longer being replaced. | |
| Nov 3, 2020 | Completed final sign-off May 2021 | 466 Orizaba Av | kitchen & bathroom remodel: r/r appliances & fixturs in same location; new lighting.master bathroom: non-structural wall modifcations to increase footprint from 36sf to 37sf for larger vanity & new fixtures in new location, replace shower in kind. replace door with pocket door. 1/2 bath mod.Details
kitchen & bathroom remodel: r/r appliances & fixturs in same location; new lighting.master bathroom: non-structural wall modifcations to increase footprint from 36sf to 37sf for larger vanity & new fixtures in new location, replace shower in kind. replace door with pocket door. 1/2 bath mod. | $70,000 |
| Oct 22, 2020 | Completed final sign-off Aug 2021 | 898 Waller St | kitchen & 2 bath remodel plus laundry rm. kitchen- replace cabs, fixtures, appliances, (n) lights & circuits. bath rm- add toilet & (n) exhaust fan, replace shower tub combo. powerd rm- replace all fixtures except toilet. relocate 1 washerDetails
kitchen & 2 bath remodel plus laundry rm. kitchen- replace cabs, fixtures, appliances, (n) lights & circuits. bath rm- add toilet & (n) exhaust fan, replace shower tub combo. powerd rm- replace all fixtures except toilet. relocate 1 washer | $40,000 |
| Sep 30, 2020 | Completed final sign-off Jul 2021 | 1570 11th Av | kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same areaDetails
kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same area | $80,000 |
| Sep 2, 2020 | Completed final sign-off Mar 2021 | 1434 La Playa | single bathroom remodel,replace vanity, toilet retile shower & replace fixtures. replace exterior window in kind. new exhaust fan to exterior.Details
single bathroom remodel,replace vanity, toilet retile shower & replace fixtures. replace exterior window in kind. new exhaust fan to exterior. | $30,000 |
| Sep 1, 2020 | Completed final sign-off Jul 2021 | 4150 17th St | 3 cosmetic bathroom remodels with no changes to existing layout or plumbing additions. bath 1. replace vanity & toilet, retile standing shower & replace fixtures. bath 2: replace vanity, toilet & shower tub combo. bath 3: replace toilet, vanity & shower. replace flooring, lighting, switches, toiletsDetails
3 cosmetic bathroom remodels with no changes to existing layout or plumbing additions. bath 1. replace vanity & toilet, retile standing shower & replace fixtures. bath 2: replace vanity, toilet & shower tub combo. bath 3: replace toilet, vanity & shower. replace flooring, lighting, switches, toilets | $42,000 |
| Sep 1, 2020 | Never finaled issued Sep 2020, no final | 325 China Basin St | unit 314: cosmetic ktichen and bath remodle. remove/replace sink, counter top, range board in same location. install new cabinetry, remove & replace bathroom vanity & toilet at same location. replace shower tile & fixtures. no structural alterations.Details
unit 314: cosmetic ktichen and bath remodle. remove/replace sink, counter top, range board in same location. install new cabinetry, remove & replace bathroom vanity & toilet at same location. replace shower tile & fixtures. no structural alterations. | $42,000 |
| Aug 22, 2020 | Completed final sign-off May 2021 | 1879 43rd Av | remodel kitchen: remove non-structural wall and replace cabinetry, sink, and dishwasher in same location. remodel bathroom: remoe and replace vanity, tub/shower. toilet will be replaced and relocated. existing standing shower removed.Details
remodel kitchen: remove non-structural wall and replace cabinetry, sink, and dishwasher in same location. remodel bathroom: remoe and replace vanity, tub/shower. toilet will be replaced and relocated. existing standing shower removed. | $45,000 |
| Jul 31, 2020 | Completed final sign-off Feb 2021 | 28 Clayton St | in-kind bathroom remodel no change to floor plan or wallsupper floorsq ft not changing replace existing toilet, tub, & double vanity with newreplace existing exhaust fan w/ humidity sensor, 2 wall mounted lights, & 1 recessed light, with new. 1 new circuit. the bathroom is 8'9" x 6'0".Details
in-kind bathroom remodel no change to floor plan or wallsupper floorsq ft not changing replace existing toilet, tub, & double vanity with newreplace existing exhaust fan w/ humidity sensor, 2 wall mounted lights, & 1 recessed light, with new. 1 new circuit. the bathroom is 8'9" x 6'0". | $30,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2021 | 150 Page St | apt 35 aka 306: interior renovation of existing kitchen and two 3-piece bathrooms in-kind.. addition of a washing machine in existing kitchen, new dedicated circuits, lighting fixtures and exhaust fans.Details
apt 35 aka 306: interior renovation of existing kitchen and two 3-piece bathrooms in-kind.. addition of a washing machine in existing kitchen, new dedicated circuits, lighting fixtures and exhaust fans. | $68,000 |
| Mar 12, 2020 | Completed final sign-off Nov 2020 | 400 Beale St | unit 1505. kitchen 100 sq ft and bathroom 68 sq ft remodels.Details
unit 1505. kitchen 100 sq ft and bathroom 68 sq ft remodels. | $30,800 |
| Mar 5, 2020 | Completed final sign-off Oct 2020 | 1440 Broadway | apt 306: bathroom remodel. remove one non structural wall.in=kind, same layout.Details
apt 306: bathroom remodel. remove one non structural wall.in=kind, same layout. | $15,000 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 3478 22nd St | kitchen, bathroom and laundery remodelDetails
kitchen, bathroom and laundery remodel | $36,700 |
| Mar 5, 2020 | Completed final sign-off Sep 2020 | 2 Victoria St | bathroom remodel in kind on 2nd floorDetails
bathroom remodel in kind on 2nd floor | $15,800 |
| Feb 20, 2020 | Completed final sign-off Feb 2022 | 346 01st St | unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.Details
unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft. | $46,000 |
| Feb 20, 2020 | Completed final sign-off Aug 2020 | 424 Judson Av | bathroom remodelDetails
bathroom remodel | $15,000 |
| Jan 14, 2020 | Completed final sign-off May 2020 | 3827 Clay St | bathroom remodel - like for like, keeping toilet & vanity, swapping out shower/tub comboDetails
bathroom remodel - like for like, keeping toilet & vanity, swapping out shower/tub combo | $12,000 |
| Dec 19, 2019 | Expired or cancelled cancelled Jan 2021 | 1770 Pacific Av | unit #401; remodel bathroom, & move bathroom door to left n/a maherDetails
unit #401; remodel bathroom, & move bathroom door to left n/a maher | $15,500 |
| Dec 19, 2019 | Completed final sign-off May 2020 | 52 Rosemont Pl | bathroom remodel with non-structural wall removal between toilet and vanity, replace (e) window, replace enrty flooringDetails
bathroom remodel with non-structural wall removal between toilet and vanity, replace (e) window, replace enrty flooring | $15,500 |
| Dec 9, 2019 | Completed final sign-off Oct 2020 | 301 Bryant St | unit #601: kitchen and 2 bath remodel. kitchen replace all fixtures, sink, floor, keep appliances. master bath - replace all fixtures, toilet, vanity, shower expanded. shower wall removed. hall bath remodel - replace all fixtures, toilet, vanity, replace tub w/ showerDetails
unit #601: kitchen and 2 bath remodel. kitchen replace all fixtures, sink, floor, keep appliances. master bath - replace all fixtures, toilet, vanity, shower expanded. shower wall removed. hall bath remodel - replace all fixtures, toilet, vanity, replace tub w/ shower | $49,500 |
| Nov 19, 2019 | Completed final sign-off Jul 2020 | 200 Brannan St | unit 420 - remodel (e) bathroom, remove & re-install in place (e) toilet, shower & double vanity/sink, removal of (e) wall & replace w/(n) wall in same location. no new plumbing connections are porposed. some mep work consisting of replacing and/or relocating light fixtures, switches & install newDetails
unit 420 - remodel (e) bathroom, remove & re-install in place (e) toilet, shower & double vanity/sink, removal of (e) wall & replace w/(n) wall in same location. no new plumbing connections are porposed. some mep work consisting of replacing and/or relocating light fixtures, switches & install new | $57,000 |
| Oct 24, 2019 | Completed final sign-off May 2020 | 655 Anderson St | 2nd fl bath remodel, expansion of bath footprint through absorption of e closet into bathroom, full reconfiguration.Details
2nd fl bath remodel, expansion of bath footprint through absorption of e closet into bathroom, full reconfiguration. | $34,000 |
| Oct 24, 2019 | Completed final sign-off Aug 2020 | 137 Dartmouth St | simple remove & replace bathroom remodel. existing confirguration to say the same. addition of pony wall between toilet and vanity area. remodel shower w/ accessibility bar. like for like replacement of toilet & vanity.Details
simple remove & replace bathroom remodel. existing confirguration to say the same. addition of pony wall between toilet and vanity area. remodel shower w/ accessibility bar. like for like replacement of toilet & vanity. | $38,000 |
| Sep 20, 2019 | Completed final sign-off Jan 2020 | 1330 Stevenson St | basic bathroom remodel with like for like replacment of vanity shower tub combo and toilet in existing foot print . one new outlet is beind added one existing outlet is being replaced. two recessed lights are being added to ceiling. the floor is being replaced w/ new tile. bathroom size 5' x 8'Details
basic bathroom remodel with like for like replacment of vanity shower tub combo and toilet in existing foot print . one new outlet is beind added one existing outlet is being replaced. two recessed lights are being added to ceiling. the floor is being replaced w/ new tile. bathroom size 5' x 8' | $24,500 |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 5072 Diamond Heights Bl | a bathroom remodel with like for like replacement of fixtures in (e) location. like for like replacement of toilet (e) vanity fixtures. shower to be resurfaced with tile and include recessed lights in the ceiling and a handdheld fixture in the shower bathroom size 5' x 8'Details
a bathroom remodel with like for like replacement of fixtures in (e) location. like for like replacement of toilet (e) vanity fixtures. shower to be resurfaced with tile and include recessed lights in the ceiling and a handdheld fixture in the shower bathroom size 5' x 8' | $23,000 |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 53 Oakwood St | kitchen & hallway remodel update and remodel in kitchen backsplash will be updates. for hallway bathroom the flooring, countertop, toilet and all plumbing fixtures will be replaces/. replacing (e) vanity light fixture and adding recessed lights. no change of (e) floor plan.Details
kitchen & hallway remodel update and remodel in kitchen backsplash will be updates. for hallway bathroom the flooring, countertop, toilet and all plumbing fixtures will be replaces/. replacing (e) vanity light fixture and adding recessed lights. no change of (e) floor plan. | $21,000 |
| Jul 25, 2019 | Completed final sign-off Jan 2020 | 1390 Fell St | unit 201, 3rd flr. master bath and hall bath remodel. some new plumbing and electrical fixtures. layout remains unchanged. no walls modified, infilled or removed. maher n/a.Details
unit 201, 3rd flr. master bath and hall bath remodel. some new plumbing and electrical fixtures. layout remains unchanged. no walls modified, infilled or removed. maher n/a. | $16,000 |
| Jul 25, 2019 | Completed final sign-off Dec 2019 | 329 06th Av | new master bath with new vanity, toilet location. new closet.Details
new master bath with new vanity, toilet location. new closet. | $38,000 |
| Jun 7, 2019 | Completed final sign-off Aug 2019 | 2571 Post St | bathroom remodel with no movement and walls or fixtures, no structural modificationsDetails
bathroom remodel with no movement and walls or fixtures, no structural modifications | $16,000 |