Back to kitchen remodel contractors
Skye Builders Inc
- Based in
- San Carlos
- On San Francisco permits
- Jan 2005 to Jun 2021
- Last 24 months
- 0 permits filed
50 permits since 2000: 39 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2019 | Completed final sign-off Jan 2020 | 244 Duncan St | voluntary strengthening. reconfigure 1st fl/(n) bedrooms & internal stairs. renoate 2nd fl kitchen w/fixtures.Details
voluntary strengthening. reconfigure 1st fl/(n) bedrooms & internal stairs. renoate 2nd fl kitchen w/fixtures. | $150,000 |
| Feb 20, 2018 | Completed final sign-off Jun 2019 | 2190 Broadway | (n) interior remodel consisiting of removing non-bearing walls at master bedroom & kitchen. upgrade all electrical.Details
(n) interior remodel consisiting of removing non-bearing walls at master bedroom & kitchen. upgrade all electrical. | $75,000 |
| Apr 11, 2016 | Completed final sign-off Feb 2019 | 75 Topaz Wy | interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace.Details
interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace. | $220,000 |
| Apr 17, 2014 | Completed final sign-off Apr 2014 | 1883 24th Av | revision to bldg. app#201303202574: eliminate new stairs and door from 1st floor bedroom to backyard. 2)eliminate kitchen remodel from scope of work.Details
revision to bldg. app#201303202574: eliminate new stairs and door from 1st floor bedroom to backyard. 2)eliminate kitchen remodel from scope of work. | |
| Mar 20, 2013 | Completed final sign-off Apr 2014 | 1883 24th Av | 1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard.Details
1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard. | $63,000 |
| Jun 5, 2012 | Completed final sign-off Jul 2012 | 2243 14th Av | revision to pa# 201203307245. add drawing to record detailing pass through from kitchen to dining room.Details
revision to pa# 201203307245. add drawing to record detailing pass through from kitchen to dining room. | |
| Mar 30, 2012 | Completed final sign-off Jul 2012 | 2243 14th Av | renovate kitchen update electrical and plumbing; replace dry wall cabinets and appliances, renovate existing bath update electrical and plumbing repl drywall, tile coverings and fixtures; upgrade electrical service to 125 ampsDetails
renovate kitchen update electrical and plumbing; replace dry wall cabinets and appliances, renovate existing bath update electrical and plumbing repl drywall, tile coverings and fixtures; upgrade electrical service to 125 amps | $30,000 |
| May 12, 2010 | Completed final sign-off Aug 2010 | 919 Noe St | remodel (e) kitchen, no structural change. replace (e) 5 windows at rear of house, new cabs and counter tops. remodel adjacent 1/2 bath - new counter, lav and toilet. all work on 2nd floor.Details
remodel (e) kitchen, no structural change. replace (e) 5 windows at rear of house, new cabs and counter tops. remodel adjacent 1/2 bath - new counter, lav and toilet. all work on 2nd floor. | $20,000 |
| Feb 12, 2008 | Expired or cancelled expired May 2011 | 956 Hampshire St | interior remodeling for unit# 3 onthe 3rd floor. relace kitchen carrpinets and sink, remodel 2 bathrooms, new electrical panel and wiring throughout the unit and replace dry wall in the entire unit. replace 12 windows inkind. 6 of the windows are in front of bldg.Details
interior remodeling for unit# 3 onthe 3rd floor. relace kitchen carrpinets and sink, remodel 2 bathrooms, new electrical panel and wiring throughout the unit and replace dry wall in the entire unit. replace 12 windows inkind. 6 of the windows are in front of bldg. | $25,000 |