Block 2061, lot 018
1883 24th Ave
- City’s use
- Single Family Residential
- Built
- 1939
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,759 sq ft
- Lot
- 2,121 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2014 | Completed final sign-off Apr 2014 | 1883 24th Av | Skye Builders Inc | revision to bldg. app#201303202574: eliminate new stairs and door from 1st floor bedroom to backyard. 2)eliminate kitchen remodel from scope of work.Details
revision to bldg. app#201303202574: eliminate new stairs and door from 1st floor bedroom to backyard. 2)eliminate kitchen remodel from scope of work. | |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 1883 24th Av | Soon Yu Construction | 2nd floor: remove the old kitchen cabinets, installnew kitchen cabinets in place, new wiring for 10 outlets and 8 lights and 5 light switches, new sink faucet.Details
2nd floor: remove the old kitchen cabinets, installnew kitchen cabinets in place, new wiring for 10 outlets and 8 lights and 5 light switches, new sink faucet. | $10,000 |
| Mar 20, 2013 | Completed final sign-off Apr 2014 | 1883 24th Av | Soon Yu Construction, Skye Builders Inc | 1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard.Details
1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard. | $63,000 |
| Jan 15, 2013 | Completed final sign-off Feb 2013 | 1883 24th Av | Fox Structural & Termite | work to comply with item #6a in fox structural & termite report #14018 dated 6/19/12. remove stucco to expose damaged wood, replace damaged wood with new pressure-treated material at second floor balcony, approx. 4 ft x 12 ft area, finish to match existing.Details
work to comply with item #6a in fox structural & termite report #14018 dated 6/19/12. remove stucco to expose damaged wood, replace damaged wood with new pressure-treated material at second floor balcony, approx. 4 ft x 12 ft area, finish to match existing. | $3,900 |
| Sep 25, 2012 | Completed final sign-off Jan 2013 | 1883 24th Av | American Home Renewal Inc | replace 3 windows, visable from the street, no structural changes, max u factor 0.40.Details
replace 3 windows, visable from the street, no structural changes, max u factor 0.40. | $5,000 |
| Aug 27, 2012 | Completed final sign-off Jan 2013 | 1883 24th Av | J & K Roofing | reroofingDetails
reroofing | $7,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.