Back to bathroom remodel contractors
Skye Builders Inc
- Based in
- San Carlos
- On San Francisco permits
- Jan 2005 to Jun 2021
- Last 24 months
- 0 permits filed
50 permits since 2000: 39 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 14 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2020 | Completed final sign-off Aug 2021 | 2115 18th Av | add new bathroom to existing bonue room on 1st floor. convert (e) bonus room to (n) media room (350 sqft babitable space) on 1st floor.Details
add new bathroom to existing bonue room on 1st floor. convert (e) bonus room to (n) media room (350 sqft babitable space) on 1st floor. | $20,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 446 Collingwood St | remodel (2) (e) bathrooms in kind. add laundry @ (e) hall closet at top floor. provide w/ 100 sq in make-up air and exhaust per cmc 52.2.1 & 504.4Details
remodel (2) (e) bathrooms in kind. add laundry @ (e) hall closet at top floor. provide w/ 100 sq in make-up air and exhaust per cmc 52.2.1 & 504.4 | $35,000 |
| Jul 30, 2019 | Never finaled issued Aug 2019, no final | 244 Duncan St | revision to pa #201904258917. renovate existing 2nd fl bathroom in kind, replace insulation, replace drywall for 75% of bldg. replace siding at rear of building. replace rear deck-in kind.Details
revision to pa #201904258917. renovate existing 2nd fl bathroom in kind, replace insulation, replace drywall for 75% of bldg. replace siding at rear of building. replace rear deck-in kind. | |
| Sep 11, 2017 | Completed final sign-off Mar 2018 | 4203 Cesar Chavez St | renovate existing ¾ bath in kind. replace 5 existing windows - currently aluminum with wood windows within the existing openings. (side of house)Details
renovate existing ¾ bath in kind. replace 5 existing windows - currently aluminum with wood windows within the existing openings. (side of house) | $12,000 |
| Apr 11, 2016 | Completed final sign-off Feb 2019 | 75 Topaz Wy | interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace.Details
interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace. | $220,000 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 1763 Palou Av | renovate (e) bathroom expanding to incorp additional space from large adjacent hallway & connect to walk in closet. install new fiberglass window.Details
renovate (e) bathroom expanding to incorp additional space from large adjacent hallway & connect to walk in closet. install new fiberglass window. | $25,000 |
| Oct 15, 2013 | Completed final sign-off Jan 2014 | 1763 Palou Av | remodel extg bathroom in kind. replace extg window. replace shower and tub with new fixtures and finishes. install new lighting and electrical service. replace extg leaking galvanized supply drain and vent lines with copper and ci respectively. window not visible from street.new lav.Details
remodel extg bathroom in kind. replace extg window. replace shower and tub with new fixtures and finishes. install new lighting and electrical service. replace extg leaking galvanized supply drain and vent lines with copper and ci respectively. window not visible from street.new lav. | $17,000 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 1835 Franklin St | construct steel framed drywall soffit in living, dining and 2nd bathroom. replace existing basebds in kind throughout. repair drywall where necessary due to elec work (seperate permit) sprinkler permit if neededDetails
construct steel framed drywall soffit in living, dining and 2nd bathroom. replace existing basebds in kind throughout. repair drywall where necessary due to elec work (seperate permit) sprinkler permit if needed | $4,000 |
| Mar 20, 2013 | Completed final sign-off Apr 2014 | 1883 24th Av | 1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard.Details
1st floor:add 2 bedrooms, 1 full bath, hallway, and storage. 2nd floor: remodel kitchen and bath, add rear stairs to rear yard. | $63,000 |
| Mar 30, 2012 | Completed final sign-off Jul 2012 | 2243 14th Av | renovate kitchen update electrical and plumbing; replace dry wall cabinets and appliances, renovate existing bath update electrical and plumbing repl drywall, tile coverings and fixtures; upgrade electrical service to 125 ampsDetails
renovate kitchen update electrical and plumbing; replace dry wall cabinets and appliances, renovate existing bath update electrical and plumbing repl drywall, tile coverings and fixtures; upgrade electrical service to 125 amps | $30,000 |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 1319 Vallejo St | remodel one extg 3/4 bath, replace tile covering, lav and shower(toilet located seperately in adjuacent enclosure) will not move or add walls. lighting to comply with cec 150 k.Details
remodel one extg 3/4 bath, replace tile covering, lav and shower(toilet located seperately in adjuacent enclosure) will not move or add walls. lighting to comply with cec 150 k. | $8,000 |
| May 12, 2010 | Completed final sign-off Aug 2010 | 919 Noe St | remodel (e) kitchen, no structural change. replace (e) 5 windows at rear of house, new cabs and counter tops. remodel adjacent 1/2 bath - new counter, lav and toilet. all work on 2nd floor.Details
remodel (e) kitchen, no structural change. replace (e) 5 windows at rear of house, new cabs and counter tops. remodel adjacent 1/2 bath - new counter, lav and toilet. all work on 2nd floor. | $20,000 |
| Jan 4, 2010 | Completed final sign-off Apr 2010 | 1676 09th Av | remodel existingabthroom in basement with shower (no bathtub). replace tile covering. replace 6 windows in bath and den. install additional outlets in den. (windows not visible from street).Details
remodel existingabthroom in basement with shower (no bathtub). replace tile covering. replace 6 windows in bath and den. install additional outlets in den. (windows not visible from street). | $15,000 |
| Feb 12, 2008 | Expired or cancelled expired May 2011 | 956 Hampshire St | interior remodeling for unit# 3 onthe 3rd floor. relace kitchen carrpinets and sink, remodel 2 bathrooms, new electrical panel and wiring throughout the unit and replace dry wall in the entire unit. replace 12 windows inkind. 6 of the windows are in front of bldg.Details
interior remodeling for unit# 3 onthe 3rd floor. relace kitchen carrpinets and sink, remodel 2 bathrooms, new electrical panel and wiring throughout the unit and replace dry wall in the entire unit. replace 12 windows inkind. 6 of the windows are in front of bldg. | $25,000 |
| Dec 18, 2007 | Completed final sign-off Sep 2008 | 1333 Jones St | remodel bathroom, maintaining current floor plan, install shower, replace shower pan. water closet cappig supply & dwv lines.Details
remodel bathroom, maintaining current floor plan, install shower, replace shower pan. water closet cappig supply & dwv lines. | $18,000 |
| Oct 24, 2007 | Completed final sign-off Feb 2008 | 1676 09th Av | remodel extg bath. replace tub and vinity. install new lav. faucet, tub filler and mixing valve. demo extg tile on floors and walls. install water resistant gyp bd and tile backer. install new wall and floor tile. replace wndws with new in extg openings. not visible from streetDetails
remodel extg bath. replace tub and vinity. install new lav. faucet, tub filler and mixing valve. demo extg tile on floors and walls. install water resistant gyp bd and tile backer. install new wall and floor tile. replace wndws with new in extg openings. not visible from street | $15,000 |
| Jul 23, 2007 | Completed final sign-off Aug 2007 | 2937 Webster St | revision to permit number 200610245814. reconfigure two bathrooms. fir up landing at existing stairs. relocate laundry room second floor unitDetails
revision to permit number 200610245814. reconfigure two bathrooms. fir up landing at existing stairs. relocate laundry room second floor unit | $30,000 |
| Jun 25, 2007 | Completed final sign-off Oct 2007 | 142 Jules Av | additional living space to be constructed in undeveloped 1st story space; 2 rooms & one full bathroomDetails
additional living space to be constructed in undeveloped 1st story space; 2 rooms & one full bathroom | $25,000 |