Skehan Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 3 permits filed
21 permits since 2000: 12 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 76 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2023 | Completed final sign-off Mar 2024 | 1385 19th Av | to comply with physical inspection report cc8599. install 5/8 sheetrock ceiling garage. install fire 20min door garage. bring hand rail on stairs up to code. install protective bollard garage. for ground floor.Details
to comply with physical inspection report cc8599. install 5/8 sheetrock ceiling garage. install fire 20min door garage. bring hand rail on stairs up to code. install protective bollard garage. for ground floor. | $15,000 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 164 Linda St | repairs to stair at rear of building. replace handrials, stringers, new treads, less than 50%. repair in kind.Details
repairs to stair at rear of building. replace handrials, stringers, new treads, less than 50%. repair in kind. | $10,000 |