Back to bathroom remodel contractors
Skehan Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 3 permits filed
21 permits since 2000: 12 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 132 Irving St | remodel kitchen and bathroom. install new cabinets/countertops. new lighting, install new bathroom fixtures, bathroom tub. tube shower valve, new vanity and faucet. all work in kind.Details
remodel kitchen and bathroom. install new cabinets/countertops. new lighting, install new bathroom fixtures, bathroom tub. tube shower valve, new vanity and faucet. all work in kind. | $30,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 86 Cervantes Bl | kitchen remodel repalce cabinets counter tops and sink and (2) bathroom remodel to include (n) shower valves, tile surround, vanity and faucets.Details
kitchen remodel repalce cabinets counter tops and sink and (2) bathroom remodel to include (n) shower valves, tile surround, vanity and faucets. | $30,000 |
| Feb 4, 2025 | Completed final sign-off May 2025 | 1728 Clement St | install new bathroom fixtures for 3 bathrooms, tile the bathroom area, repair floor in one bathroom. install r19 and r30 insulation and sheetrockDetails
install new bathroom fixtures for 3 bathrooms, tile the bathroom area, repair floor in one bathroom. install r19 and r30 insulation and sheetrock | $30,000 |
| Jun 14, 2023 | Completed final sign-off Aug 2023 | 1385 19th Av | replace bathroom fixtures 1 toilet, 1 tub, 1 shower pan, 1 vanity, install gfi light cansDetails
replace bathroom fixtures 1 toilet, 1 tub, 1 shower pan, 1 vanity, install gfi light cans | $15,000 |
| Feb 7, 2014 | Completed final sign-off Nov 2014 | 160 27th Av | modify extg exterior partitions at 2nd floor. renovate extg bathroom and kitchen. extend exterior wall out beneath extg exterior overhang. add new exterior door system to replace extg. no structural or mechanical work.Details
modify extg exterior partitions at 2nd floor. renovate extg bathroom and kitchen. extend exterior wall out beneath extg exterior overhang. add new exterior door system to replace extg. no structural or mechanical work. | $42,000 |
| Jun 17, 2013 | Completed final sign-off Jul 2013 | 1565 Sacramento St | #1- bath remodel, replace existing fixtures.Details
#1- bath remodel, replace existing fixtures. | $8,500 |
| Sep 28, 2010 | Completed final sign-off Jan 2011 | 136 Cole St | remodel kitchen and bathroom, change lighting. replace window in light well. replace 6 windows at rear of bldg. replace in kind, no structural changes, new lighting comply with cec 150(k)Details
remodel kitchen and bathroom, change lighting. replace window in light well. replace 6 windows at rear of bldg. replace in kind, no structural changes, new lighting comply with cec 150(k) | $38,000 |