Back to kitchen remodel contractors
Skehan Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 3 permits filed
21 permits since 2000: 12 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
8 kitchen remodel permits: 4 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 132 Irving St | remodel kitchen and bathroom. install new cabinets/countertops. new lighting, install new bathroom fixtures, bathroom tub. tube shower valve, new vanity and faucet. all work in kind.Details
remodel kitchen and bathroom. install new cabinets/countertops. new lighting, install new bathroom fixtures, bathroom tub. tube shower valve, new vanity and faucet. all work in kind. | $30,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 86 Cervantes Bl | kitchen remodel repalce cabinets counter tops and sink and (2) bathroom remodel to include (n) shower valves, tile surround, vanity and faucets.Details
kitchen remodel repalce cabinets counter tops and sink and (2) bathroom remodel to include (n) shower valves, tile surround, vanity and faucets. | $30,000 |
| Sep 27, 2021 | Completed final sign-off Oct 2022 | 1385 19th Av | replace kitchen cabinets and fixtures (in-kind). add dishwasher and garbage disposalDetails
replace kitchen cabinets and fixtures (in-kind). add dishwasher and garbage disposal | $15,000 |
| Aug 25, 2020 | Expired or cancelled cancelled Nov 2020 | 548 Ortega St | remodel kitchen . install new cabinets and counter tops , install new sink garbage disposal, dishwasher and stove, install new floor covering kitchen remodel installing new cabinets and counter tops new appliances and flooringDetails
remodel kitchen . install new cabinets and counter tops , install new sink garbage disposal, dishwasher and stove, install new floor covering kitchen remodel installing new cabinets and counter tops new appliances and flooring | $18,000 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 5245 Anza St | remodel kitchen, change cabinets, plumbing, electrical, remodel in kind. comply with cec 150(k)3.Details
remodel kitchen, change cabinets, plumbing, electrical, remodel in kind. comply with cec 150(k)3. | $16,000 |
| Feb 7, 2014 | Completed final sign-off Nov 2014 | 160 27th Av | modify extg exterior partitions at 2nd floor. renovate extg bathroom and kitchen. extend exterior wall out beneath extg exterior overhang. add new exterior door system to replace extg. no structural or mechanical work.Details
modify extg exterior partitions at 2nd floor. renovate extg bathroom and kitchen. extend exterior wall out beneath extg exterior overhang. add new exterior door system to replace extg. no structural or mechanical work. | $42,000 |
| Sep 28, 2010 | Completed final sign-off Jan 2011 | 136 Cole St | remodel kitchen and bathroom, change lighting. replace window in light well. replace 6 windows at rear of bldg. replace in kind, no structural changes, new lighting comply with cec 150(k)Details
remodel kitchen and bathroom, change lighting. replace window in light well. replace 6 windows at rear of bldg. replace in kind, no structural changes, new lighting comply with cec 150(k) | $38,000 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 665 05th Av | replace kitchen cabinets & counter top. replace bathrooom fixtures.Details
replace kitchen cabinets & counter top. replace bathrooom fixtures. | $17,188 |