Sjk Development

Contractor license
735030
State license record
Based in
San Francisco
On San Francisco permits
May 2007 to Oct 2026
Last 24 months
11 permits filed

88 permits since 2000: 65 completed, 9 in progress, 12 never finaled, 2 expired or cancelled.

Of the 12 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 5 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllRoof deck 1Stairs 3Kitchen remodel 16Bathroom remodel 17

3 stairs permits: 3 completed. Typically 129 days from filing to permit and 204 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 19, 2017Completed
final sign-off Feb 2018
3256 21st Streplace existing plaster & lath in common corridors and stairways with 5/8" type x gyp bd on floor 1-4 to facilitate fire alarm upgrade related to pa# 201704063359
Details
Permit
201707192329
Status
complete
Filed
Jul 19, 2017
Permit issued
Jul 19, 2017
Final sign-off
Feb 8, 2018
Declared cost
$10,000
Address
3256 21st St

replace existing plaster & lath in common corridors and stairways with 5/8" type x gyp bd on floor 1-4 to facilitate fire alarm upgrade related to pa# 201704063359

Open the permit page

$10,000
Dec 3, 2007Completed
final sign-off Sep 2008
1400 Van Ness Avg/f, 2nd, 3,4th flr: alter to (e) office space, construct interior partitions, alter to exit stair, ada toilets, mechanical/heating system & electrical panel/systems. increase in floor area of mezz.level on 2/f and classification as floor level. alteration are ref. to previously appl#200705111030.
Details
Permit
200712039459
Status
complete
Filed
Dec 3, 2007
Permit issued
Apr 10, 2008
Final sign-off
Sep 19, 2008
Declared cost
$350,000
Address
1400 Van Ness Av

g/f, 2nd, 3,4th flr: alter to (e) office space, construct interior partitions, alter to exit stair, ada toilets, mechanical/heating system & electrical panel/systems. increase in floor area of mezz.level on 2/f and classification as floor level. alteration are ref. to previously appl#200705111030.

Open the permit page

$350,000
May 11, 2007Completed
final sign-off Sep 2008
1400 Van Ness Avrenovation & alteration to existing retail bldg. seismic & structural upgrade; provide new elevator to all stories. 2 new exit stairs; ada toiletson all stories, upgrade mech/heating systems. upgrade elec panel system.
Details
Permit
200705111030
Status
complete
Filed
May 11, 2007
Permit issued
Nov 9, 2007
Final sign-off
Sep 25, 2008
Declared cost
$750,000
Address
1400 Van Ness Av

renovation & alteration to existing retail bldg. seismic & structural upgrade; provide new elevator to all stories. 2 new exit stairs; ada toiletson all stories, upgrade mech/heating systems. upgrade elec panel system.

Open the permit page

$750,000