Back to bathroom remodel contractors
Sjk Development
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Oct 2026
- Last 24 months
- 11 permits filed
88 permits since 2000: 65 completed, 9 in progress, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 2 in progress. Typically 14 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Jul 2026 | 1970 Ocean Av | demo & brace hallow claytiles and walls. expand bathroom doors.Details
demo & brace hallow claytiles and walls. expand bathroom doors. | $20,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 1970 Ocean Av | expand bathrooms on main level. 2 new drinking fountains.Details
expand bathrooms on main level. 2 new drinking fountains. | $30,000 |
| Apr 19, 2022 | Completed final sign-off Apr 2023 | 1817 Jackson St | units ph1 & ph2: remove drywall from walls & ceilings and replace with in-kind replacement of 5/8in type-x gyp board. remodel 4 bathrooms and 2 kitchens. no change to exteiror or windows walls, lighting shall comply with cec150. non structural remodelDetails
units ph1 & ph2: remove drywall from walls & ceilings and replace with in-kind replacement of 5/8in type-x gyp board. remodel 4 bathrooms and 2 kitchens. no change to exteiror or windows walls, lighting shall comply with cec150. non structural remodel | $125,000 |
| Jan 27, 2022 | Completed final sign-off May 2022 | 1884 Greenwich St | unit 204: demo existing finishes and install new cabinets in kitchen and bathroom. no changes to existing layout. remove texture from ceilings and walls and refinish to smooth wall.Details
unit 204: demo existing finishes and install new cabinets in kitchen and bathroom. no changes to existing layout. remove texture from ceilings and walls and refinish to smooth wall. | $56,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2022 | 1437 Chestnut St | rev to pa 202107194631. additional bathrooms @ unit 22, #32. new closets @ unit #2, #22 and #32Details
rev to pa 202107194631. additional bathrooms @ unit 22, #32. new closets @ unit #2, #22 and #32 | |
| Sep 21, 2021 | Completed final sign-off Apr 2022 | 1817 Jackson St | #8. remove drywall from walls & ceilings with in kind replacement of 5/8" type x gypboard. remodel 2 bathrooms and kitchen. no change to walls, windows or doors.lighting shall comply with cec 150.0 (k)Details
#8. remove drywall from walls & ceilings with in kind replacement of 5/8" type x gypboard. remodel 2 bathrooms and kitchen. no change to walls, windows or doors.lighting shall comply with cec 150.0 (k) | $75,000 |
| Jul 19, 2021 | Completed final sign-off Aug 2022 | 1437 Chestnut St | interior remodel of (e) units# 2, #22, and #32 to include: relocate kitchen and convert to new bedroom. removal (e) closet between living and bathroom. infill of (e) doors interior only. no exterior work.Details
interior remodel of (e) units# 2, #22, and #32 to include: relocate kitchen and convert to new bedroom. removal (e) closet between living and bathroom. infill of (e) doors interior only. no exterior work. | $50,000 |
| Dec 1, 2020 | Completed final sign-off May 2022 | 1900 Jefferson St | #202 & #305: reconfigure interior partitions. #202 changes from 1 bed 1 bath to 2 bed 1 bath. #305 changes from 1 bed 1 bath to 3 bed 2 baths. (n) elec, lighting, plumbing.Details
#202 & #305: reconfigure interior partitions. #202 changes from 1 bed 1 bath to 2 bed 1 bath. #305 changes from 1 bed 1 bath to 3 bed 2 baths. (n) elec, lighting, plumbing. | $190,000 |
| Oct 2, 2020 | Completed final sign-off Jan 2022 | 2255 Bush St | unit 2: interior remodel: add new bathroom, 2 bedrooms inside (e) unit. no new sf. interior work only.; add new entry door, resulting in two direct entries and adding wet bar in bedroom without the open visual in that area.Details
unit 2: interior remodel: add new bathroom, 2 bedrooms inside (e) unit. no new sf. interior work only.; add new entry door, resulting in two direct entries and adding wet bar in bedroom without the open visual in that area. | $85,000 |
| Jun 6, 2020 | Completed final sign-off May 2022 | 1900 Jefferson St | complete remodel of three existing onebedroom apartments located on the 2nd, 3rd and 4th floor of a four-story 15 unit apartment building. remodel will result in conversion of the units from one bedroom to threebedroom, two bath units.Details
complete remodel of three existing onebedroom apartments located on the 2nd, 3rd and 4th floor of a four-story 15 unit apartment building. remodel will result in conversion of the units from one bedroom to threebedroom, two bath units. | $303,429 |
| Jul 6, 2017 | Completed final sign-off Dec 2017 | 3256 21st St | remodel existing unit 6 (n) kitchen, (n) bedroom, (n) fixtures in (e) bathroomDetails
remodel existing unit 6 (n) kitchen, (n) bedroom, (n) fixtures in (e) bathroom | $30,000 |
| Jul 28, 2016 | Completed final sign-off Feb 2017 | 3256 21st St | unit 11, 4th floor - remodel (n) kitchen and living area, (n) bathroom fixtures and finishesDetails
unit 11, 4th floor - remodel (n) kitchen and living area, (n) bathroom fixtures and finishes | $30,000 |
| Jul 22, 2016 | Completed final sign-off Dec 2017 | 3256 21st St | revision ref pa 201507302906 - change of kitchen & bathroom change the lightwell to courtyard maher naDetails
revision ref pa 201507302906 - change of kitchen & bathroom change the lightwell to courtyard maher na | |
| Jul 30, 2015 | Completed final sign-off Dec 2017 | 3256 21st St | at ground floor, legalize (e) in-law dwelling unit. replace (e) garage stall w/ (n) bedroom. enlarge (e) courtyard. (n) bathroom & kitchen. n/a for maher ordinance no.155-13.Details
at ground floor, legalize (e) in-law dwelling unit. replace (e) garage stall w/ (n) bedroom. enlarge (e) courtyard. (n) bathroom & kitchen. n/a for maher ordinance no.155-13. | $135,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2018 | 4540 19th St | remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.Details
remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room. | $560,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 135 Buchanan St | unit #135-kitchen, bathroom & laundry room remodel, demo (e) drywall, replace with 5/8 type x painting. strengthen (e) wood beam with steel channel at ground floorDetails
unit #135-kitchen, bathroom & laundry room remodel, demo (e) drywall, replace with 5/8 type x painting. strengthen (e) wood beam with steel channel at ground floor | $85,000 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 1728 Waller St | interior renvoation: 1 bath, 1 kitchen, 1 closet and new non structural partitions. add 1 bathDetails
interior renvoation: 1 bath, 1 kitchen, 1 closet and new non structural partitions. add 1 bath | $65,000 |