Back to kitchen remodel contractors
Sjk Development
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Oct 2026
- Last 24 months
- 11 permits filed
88 permits since 2000: 65 completed, 9 in progress, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 16 completed. Typically 0 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2022 | Completed final sign-off Apr 2023 | 1817 Jackson St | units ph1 & ph2: remove drywall from walls & ceilings and replace with in-kind replacement of 5/8in type-x gyp board. remodel 4 bathrooms and 2 kitchens. no change to exteiror or windows walls, lighting shall comply with cec150. non structural remodelDetails
units ph1 & ph2: remove drywall from walls & ceilings and replace with in-kind replacement of 5/8in type-x gyp board. remodel 4 bathrooms and 2 kitchens. no change to exteiror or windows walls, lighting shall comply with cec150. non structural remodel | $125,000 |
| Jan 27, 2022 | Completed final sign-off May 2022 | 1884 Greenwich St | unit 204: demo existing finishes and install new cabinets in kitchen and bathroom. no changes to existing layout. remove texture from ceilings and walls and refinish to smooth wall.Details
unit 204: demo existing finishes and install new cabinets in kitchen and bathroom. no changes to existing layout. remove texture from ceilings and walls and refinish to smooth wall. | $56,000 |
| Sep 21, 2021 | Completed final sign-off Apr 2022 | 1817 Jackson St | #8. remove drywall from walls & ceilings with in kind replacement of 5/8" type x gypboard. remodel 2 bathrooms and kitchen. no change to walls, windows or doors.lighting shall comply with cec 150.0 (k)Details
#8. remove drywall from walls & ceilings with in kind replacement of 5/8" type x gypboard. remodel 2 bathrooms and kitchen. no change to walls, windows or doors.lighting shall comply with cec 150.0 (k) | $75,000 |
| Jul 19, 2021 | Completed final sign-off Aug 2022 | 1437 Chestnut St | interior remodel of (e) units# 2, #22, and #32 to include: relocate kitchen and convert to new bedroom. removal (e) closet between living and bathroom. infill of (e) doors interior only. no exterior work.Details
interior remodel of (e) units# 2, #22, and #32 to include: relocate kitchen and convert to new bedroom. removal (e) closet between living and bathroom. infill of (e) doors interior only. no exterior work. | $50,000 |
| Apr 27, 2018 | Completed final sign-off Aug 2018 | 3256 21st St | units 404 & 406: remodel existing units at 4th fl. new kitchens with new fixtures and finishes and new bedroomsDetails
units 404 & 406: remodel existing units at 4th fl. new kitchens with new fixtures and finishes and new bedrooms | $40,000 |
| Apr 27, 2018 | Completed final sign-off Aug 2018 | 3256 21st St | unit 405: remodel existing unit at 4th fl. new kitchen with new fixtures and finishes and new bedroomDetails
unit 405: remodel existing unit at 4th fl. new kitchen with new fixtures and finishes and new bedroom | $30,000 |
| Jul 6, 2017 | Completed final sign-off Dec 2017 | 3256 21st St | remodel existing unit 6 (n) kitchen, (n) bedroom, (n) fixtures in (e) bathroomDetails
remodel existing unit 6 (n) kitchen, (n) bedroom, (n) fixtures in (e) bathroom | $30,000 |
| Oct 26, 2016 | Completed final sign-off Dec 2017 | 3256 21st St | remodel (e) units 7 & 17 at 3rd & 4th floor. relocate kitchen with new fixture and fisinshes and new bedroomDetails
remodel (e) units 7 & 17 at 3rd & 4th floor. relocate kitchen with new fixture and fisinshes and new bedroom | $25,000 |
| Jul 28, 2016 | Completed final sign-off Feb 2017 | 3256 21st St | unit 11, 4th floor - remodel (n) kitchen and living area, (n) bathroom fixtures and finishesDetails
unit 11, 4th floor - remodel (n) kitchen and living area, (n) bathroom fixtures and finishes | $30,000 |
| Jul 22, 2016 | Completed final sign-off Dec 2017 | 3256 21st St | revision ref pa 201507302906 - change of kitchen & bathroom change the lightwell to courtyard maher naDetails
revision ref pa 201507302906 - change of kitchen & bathroom change the lightwell to courtyard maher na | |
| Jul 30, 2015 | Completed final sign-off Dec 2017 | 3256 21st St | at ground floor, legalize (e) in-law dwelling unit. replace (e) garage stall w/ (n) bedroom. enlarge (e) courtyard. (n) bathroom & kitchen. n/a for maher ordinance no.155-13.Details
at ground floor, legalize (e) in-law dwelling unit. replace (e) garage stall w/ (n) bedroom. enlarge (e) courtyard. (n) bathroom & kitchen. n/a for maher ordinance no.155-13. | $135,000 |
| Jun 14, 2012 | Completed final sign-off Oct 2012 | 1701 North Point St | water damage repair (see pa#201204108018) repair walls. approx 600 sq. ft. gyp insulation. remodel kitchen. comply with nov 3200174473. no structural work. no new lighting.Details
water damage repair (see pa#201204108018) repair walls. approx 600 sq. ft. gyp insulation. remodel kitchen. comply with nov 3200174473. no structural work. no new lighting. | $12,000 |
| Apr 10, 2012 | Completed final sign-off Oct 2012 | 1701 North Point St | demo drywall/lath & plaster from walls and ceilings in units 104, 204 & 304 & lobby. effective by water flooding. approx 600 sf of in kind replacement. replace with 5/8" type x gypboard. new insulation, flooring, paint and kitchens. to comply with nov 201174473.Details
demo drywall/lath & plaster from walls and ceilings in units 104, 204 & 304 & lobby. effective by water flooding. approx 600 sf of in kind replacement. replace with 5/8" type x gypboard. new insulation, flooring, paint and kitchens. to comply with nov 201174473. | $75,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 135 Buchanan St | unit #135-kitchen, bathroom & laundry room remodel, demo (e) drywall, replace with 5/8 type x painting. strengthen (e) wood beam with steel channel at ground floorDetails
unit #135-kitchen, bathroom & laundry room remodel, demo (e) drywall, replace with 5/8 type x painting. strengthen (e) wood beam with steel channel at ground floor | $85,000 |
| Apr 19, 2011 | Completed final sign-off Jan 2012 | 1817 Jackson St | unit #3: demo drywall from walls and ceilings in unit #3 effected by water flooding approx 1000 sf of in kind replacement, repl with 5/8" type x gypboard,new insulation flooring,paint; 2 bathrms,kitchen,no change to walls window or door lighting to comply with cec 150kDetails
unit #3: demo drywall from walls and ceilings in unit #3 effected by water flooding approx 1000 sf of in kind replacement, repl with 5/8" type x gypboard,new insulation flooring,paint; 2 bathrms,kitchen,no change to walls window or door lighting to comply with cec 150k | $75,000 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 1728 Waller St | interior renvoation: 1 bath, 1 kitchen, 1 closet and new non structural partitions. add 1 bathDetails
interior renvoation: 1 bath, 1 kitchen, 1 closet and new non structural partitions. add 1 bath | $65,000 |