Back to kitchen remodel contractors
Sing Wong
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 44 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 18 completed. Typically 0 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2019 | Completed final sign-off May 2021 | 208 Surrey St | interior remodel of 2/f including kitchen, bathroom & 1 bedroom. a (n) interior stair down to ground fl. rpelace 2 windows & 1 door in 2/f rear. add 3 (n) windows to g/f north side wall. partial excavation of g/f to add (n) bedroom, bath & laundry. elec, lighting, hvac & plumbing in areas of work.Details
interior remodel of 2/f including kitchen, bathroom & 1 bedroom. a (n) interior stair down to ground fl. rpelace 2 windows & 1 door in 2/f rear. add 3 (n) windows to g/f north side wall. partial excavation of g/f to add (n) bedroom, bath & laundry. elec, lighting, hvac & plumbing in areas of work. | $185,000 |
| Sep 3, 2019 | Completed final sign-off Feb 2022 | 54 Macondray Ln | work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace.Details
work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace. | $165,000 |
| Jul 31, 2019 | Completed final sign-off May 2020 | 18 Chicago Wy | int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room caseworkDetails
int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room casework | $100,000 |
| Mar 23, 2018 | Completed final sign-off Jan 2019 | 2924 20th Av | remodel kitchen and new deck at rearDetails
remodel kitchen and new deck at rear | $25,000 |
| Sep 29, 2016 | Completed final sign-off Mar 2017 | 55 Van Buren St | remodel kitchen and one bath room. no structural workDetails
remodel kitchen and one bath room. no structural work | $18,000 |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 46 Mars St | (e) kitchen & bathroom remodel; rear buildingDetails
(e) kitchen & bathroom remodel; rear building | $25,000 |
| Jul 16, 2015 | Completed final sign-off Nov 2015 | 22 Montezuma St | interior remodel: replace kitchen cabinets & appliances in-kind in the same location. replace bathroom fixtures & finishes in-kind in the same location. new drywall & insulation in the bathroom. all work at lower unit.Details
interior remodel: replace kitchen cabinets & appliances in-kind in the same location. replace bathroom fixtures & finishes in-kind in the same location. new drywall & insulation in the bathroom. all work at lower unit. | $10,000 |
| Mar 13, 2015 | Completed final sign-off Nov 2015 | 101 States St | #4: remove (e)fireplace & flu-replace w/bioethanol ventless unit. replace (e)interior stair w/new steel & wood open riser stair. interior alterations to kitchen, new cabinets/appliances. remove 1 skylight, replace w/2 new skylights. new elec/plumb-remodel lower bath replace 2 windows not facing st.Details
#4: remove (e)fireplace & flu-replace w/bioethanol ventless unit. replace (e)interior stair w/new steel & wood open riser stair. interior alterations to kitchen, new cabinets/appliances. remove 1 skylight, replace w/2 new skylights. new elec/plumb-remodel lower bath replace 2 windows not facing st. | $55,000 |
| Jun 21, 2012 | Completed final sign-off Mar 2014 | 240 Mississippi St | new bath and laundry at 2nd and 3rd levels. renovate extg kitchens and baths. replace extg foundation. replace extg windows and install new windows/doors(side, rear). new property line windows. not visible from street.Details
new bath and laundry at 2nd and 3rd levels. renovate extg kitchens and baths. replace extg foundation. replace extg windows and install new windows/doors(side, rear). new property line windows. not visible from street. | $165,000 |
| Jun 21, 2012 | Completed final sign-off Nov 2012 | 429 Douglass St | remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st flDetails
remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st fl | $150,000 |
| May 6, 2011 | Completed final sign-off Apr 2012 | 201 Genebern Wy | legalize/interior remodel at 1st & 2nd floors. new partial foundation, re-furbish (e) kitchen at 2nd floorDetails
legalize/interior remodel at 1st & 2nd floors. new partial foundation, re-furbish (e) kitchen at 2nd floor | $82,000 |
| Jul 27, 2007 | Completed final sign-off Dec 2007 | 9 Grand View Tr | kitchen remodeling:replace cabinet,replace plmg fixtures, replace appliancesDetails
kitchen remodeling:replace cabinet,replace plmg fixtures, replace appliances | $15,000 |
| Mar 31, 2006 | Completed final sign-off Nov 2006 | 568 Sanchez St | remodel 1 kitchen in unit# 568 & 3 1/2 bathrooms for both units. flourescent lighting.Details
remodel 1 kitchen in unit# 568 & 3 1/2 bathrooms for both units. flourescent lighting. | $52,000 |
| Jan 19, 2005 | Completed final sign-off Feb 2005 | 1607 35th Av | kitchen remodelDetails
kitchen remodel | $6,500 |
| Oct 13, 2004 | Completed final sign-off Jun 2005 | 2021 Balboa St | 2 kitchens 2 bathroom remodeling & vinyl window replacementDetails
2 kitchens 2 bathroom remodeling & vinyl window replacement | $56,000 |
| Dec 23, 2003 | Completed final sign-off Apr 2004 | 157 Westwood Dr | remodel (e) kitchen with new cabinets. counter top. sink, appliances & new tile foor. removal ofDetails
remodel (e) kitchen with new cabinets. counter top. sink, appliances & new tile foor. removal of | $8,000 |
| Sep 2, 2003 | Completed final sign-off Dec 2003 | 964 Corbett Av | remodel 2 exist bathrooms&kitchen-1bath,4 windows, 1 exterior door on rear facade.new elec,light&pluDetails
remodel 2 exist bathrooms&kitchen-1bath,4 windows, 1 exterior door on rear facade.new elec,light&plu | $40,000 |
| Apr 10, 2000 | Completed final sign-off Aug 2001 | 4350 Cesar Chavez St | replacement of (e) north facing windows with new dbl glazed remodel of (e) kitchen bathrm & bedrmDetails
replacement of (e) north facing windows with new dbl glazed remodel of (e) kitchen bathrm & bedrm | $46,000 |