Back to bathroom remodel contractors
Sing Wong
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 44 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 20 completed. Typically 0 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2019 | Completed final sign-off May 2021 | 208 Surrey St | interior remodel of 2/f including kitchen, bathroom & 1 bedroom. a (n) interior stair down to ground fl. rpelace 2 windows & 1 door in 2/f rear. add 3 (n) windows to g/f north side wall. partial excavation of g/f to add (n) bedroom, bath & laundry. elec, lighting, hvac & plumbing in areas of work.Details
interior remodel of 2/f including kitchen, bathroom & 1 bedroom. a (n) interior stair down to ground fl. rpelace 2 windows & 1 door in 2/f rear. add 3 (n) windows to g/f north side wall. partial excavation of g/f to add (n) bedroom, bath & laundry. elec, lighting, hvac & plumbing in areas of work. | $185,000 |
| Sep 3, 2019 | Completed final sign-off Feb 2022 | 54 Macondray Ln | work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace.Details
work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace. | $165,000 |
| Jul 31, 2019 | Completed final sign-off May 2020 | 18 Chicago Wy | int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room caseworkDetails
int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room casework | $100,000 |
| Oct 23, 2017 | Completed final sign-off Sep 2018 | 876 31st Av | interior renovation and voluntary foundation strengthening. new master suite and full bath on 3rd floor. window replacement and rear yard deck replacement.Details
interior renovation and voluntary foundation strengthening. new master suite and full bath on 3rd floor. window replacement and rear yard deck replacement. | $80,000 |
| Sep 29, 2016 | Completed final sign-off Mar 2017 | 55 Van Buren St | remodel kitchen and one bath room. no structural workDetails
remodel kitchen and one bath room. no structural work | $18,000 |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 46 Mars St | (e) kitchen & bathroom remodel; rear buildingDetails
(e) kitchen & bathroom remodel; rear building | $25,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2016 | 178 Holladay Av | interior renovation consisting of new bathroom on 2nd floor, with new polycarbonate dome skylight. not visible from streetDetails
interior renovation consisting of new bathroom on 2nd floor, with new polycarbonate dome skylight. not visible from street | $8,000 |
| Jul 16, 2015 | Completed final sign-off Nov 2015 | 22 Montezuma St | interior remodel: replace kitchen cabinets & appliances in-kind in the same location. replace bathroom fixtures & finishes in-kind in the same location. new drywall & insulation in the bathroom. all work at lower unit.Details
interior remodel: replace kitchen cabinets & appliances in-kind in the same location. replace bathroom fixtures & finishes in-kind in the same location. new drywall & insulation in the bathroom. all work at lower unit. | $10,000 |
| Mar 13, 2015 | Completed final sign-off Nov 2015 | 101 States St | #4: remove (e)fireplace & flu-replace w/bioethanol ventless unit. replace (e)interior stair w/new steel & wood open riser stair. interior alterations to kitchen, new cabinets/appliances. remove 1 skylight, replace w/2 new skylights. new elec/plumb-remodel lower bath replace 2 windows not facing st.Details
#4: remove (e)fireplace & flu-replace w/bioethanol ventless unit. replace (e)interior stair w/new steel & wood open riser stair. interior alterations to kitchen, new cabinets/appliances. remove 1 skylight, replace w/2 new skylights. new elec/plumb-remodel lower bath replace 2 windows not facing st. | $55,000 |
| Jun 11, 2013 | Completed final sign-off Jan 2014 | 932 Shotwell St | convert exiting 2nd floor closet to 1/2 half bath. add a new low flow toilet and sink with low flow faucet. move door. install new lighting, medicine cabinet,floor tile, exhaust fanDetails
convert exiting 2nd floor closet to 1/2 half bath. add a new low flow toilet and sink with low flow faucet. move door. install new lighting, medicine cabinet,floor tile, exhaust fan | $5,000 |
| Jun 21, 2012 | Completed final sign-off Mar 2014 | 240 Mississippi St | new bath and laundry at 2nd and 3rd levels. renovate extg kitchens and baths. replace extg foundation. replace extg windows and install new windows/doors(side, rear). new property line windows. not visible from street.Details
new bath and laundry at 2nd and 3rd levels. renovate extg kitchens and baths. replace extg foundation. replace extg windows and install new windows/doors(side, rear). new property line windows. not visible from street. | $165,000 |
| Jun 21, 2012 | Completed final sign-off Nov 2012 | 429 Douglass St | remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st flDetails
remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st fl | $150,000 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 9 Grand View Tr | remodel an (e) bathroom in an (e) 2 family dwelling. no structural work. including replacement of bathroom window with max. u-factor of 0.40. not visible from the street. infill (e) wall, new door, exhaust & hook-ups for new laundry roomDetails
remodel an (e) bathroom in an (e) 2 family dwelling. no structural work. including replacement of bathroom window with max. u-factor of 0.40. not visible from the street. infill (e) wall, new door, exhaust & hook-ups for new laundry room | $12,000 |
| Aug 17, 2010 | Completed final sign-off Nov 2010 | 4150 17th St | unit#2 bathroom remodel: replace plumbing/electrical & fixtures, retile new flooring, replace shower, countertops & repaintingDetails
unit#2 bathroom remodel: replace plumbing/electrical & fixtures, retile new flooring, replace shower, countertops & repainting | $8,000 |
| Dec 20, 2006 | Completed final sign-off May 2007 | 1607 35th Av | install bathroom and divide existing room downstairs into 2 individual roomsDetails
install bathroom and divide existing room downstairs into 2 individual rooms | $25,000 |
| Mar 31, 2006 | Completed final sign-off Nov 2006 | 568 Sanchez St | remodel 1 kitchen in unit# 568 & 3 1/2 bathrooms for both units. flourescent lighting.Details
remodel 1 kitchen in unit# 568 & 3 1/2 bathrooms for both units. flourescent lighting. | $52,000 |
| Mar 31, 2006 | Completed final sign-off Nov 2006 | 566 Sanchez St | remodel 1 bathroom. flourescent lighting.Details
remodel 1 bathroom. flourescent lighting. | $11,000 |
| Oct 13, 2004 | Completed final sign-off Jun 2005 | 2021 Balboa St | 2 kitchens 2 bathroom remodeling & vinyl window replacementDetails
2 kitchens 2 bathroom remodeling & vinyl window replacement | $56,000 |
| Dec 26, 2003 | Completed final sign-off Apr 2004 | 157 Westwood Dr | remodel (e)bathroom w/new sink,bath tub & toilet,new tile floor.no structural workDetails
remodel (e)bathroom w/new sink,bath tub & toilet,new tile floor.no structural work | $5,000 |
| Sep 2, 2003 | Completed final sign-off Dec 2003 | 964 Corbett Av | remodel 2 exist bathrooms&kitchen-1bath,4 windows, 1 exterior door on rear facade.new elec,light&pluDetails
remodel 2 exist bathrooms&kitchen-1bath,4 windows, 1 exterior door on rear facade.new elec,light&plu | $40,000 |