Sing Wong
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 44 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 8 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2019 | Completed final sign-off May 2022 | 208 Surrey St | front yard addition of an entry porch @ 2nd fl level on (e) front deck. (2)(n) windows & (1)(n) front entry door. electrical & lighting in the are of work.Details
front yard addition of an entry porch @ 2nd fl level on (e) front deck. (2)(n) windows & (1)(n) front entry door. electrical & lighting in the are of work. | $25,000 |
| Mar 23, 2018 | Completed final sign-off Jan 2019 | 2924 20th Av | remodel kitchen and new deck at rearDetails
remodel kitchen and new deck at rear | $25,000 |
| Oct 23, 2017 | Completed final sign-off Sep 2018 | 876 31st Av | interior renovation and voluntary foundation strengthening. new master suite and full bath on 3rd floor. window replacement and rear yard deck replacement.Details
interior renovation and voluntary foundation strengthening. new master suite and full bath on 3rd floor. window replacement and rear yard deck replacement. | $80,000 |
| May 21, 2010 | Completed final sign-off Aug 2010 | 105 Molimo Dr | replace floor boards and railing of upper deck. (e) deck size and struc. to remainDetails
replace floor boards and railing of upper deck. (e) deck size and struc. to remain | $9,000 |
| Feb 26, 2010 | Never finaled issued Mar 2010, no final | 38 Van Buren St | rebuild existing deck, add door to bedroom at back of house (next to deck) reframing and replacing window in same room, widen doorway in other bedroom and replace door (next to deck at back of house)Details
rebuild existing deck, add door to bedroom at back of house (next to deck) reframing and replacing window in same room, widen doorway in other bedroom and replace door (next to deck at back of house) | $35,000 |