Back to kitchen remodel contractors
Sincere Construction Company Inc
- Based in
- Brisbane
- On San Francisco permits
- Feb 2007 to Aug 2026
- Last 24 months
- 14 permits filed
474 permits since 2000: 389 completed, 13 in progress, 44 never finaled, 28 expired or cancelled.
Of the 44 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old, 33 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
39 kitchen remodel permits: 32 completed, 6 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Jun 2026 | 869 Washington St | revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island.Details
revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island. | $100 |
| Oct 10, 2023 | Completed final sign-off Jun 2024 | 94 Bernal Heights Bl | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in basement, 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in basement, 1st fl, 2nd fl with 1 shower pan(s). | $85,000 |
| Sep 23, 2023 | Completed final sign-off Mar 2024 | 657 Morse St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| May 16, 2023 | Completed final sign-off Jun 2026 | 867 Washington St | to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sfDetails
to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sf | $40,000 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 4663 18th St | remodel 1 (e) kitchen and one (e) bathroom. repaint entire unit. no structural work.Details
remodel 1 (e) kitchen and one (e) bathroom. repaint entire unit. no structural work. | $38,000 |
| Mar 2, 2022 | Completed final sign-off Oct 2022 | 3611 23rd St | remodel one existing one kitchen and one existing bathroom repaint entire unit. no structural workDetails
remodel one existing one kitchen and one existing bathroom repaint entire unit. no structural work | $38,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2022 | 2242 Polk St | transfer (1) room in apt #503 to apt #504, apt #503 total area 553 sq ft. room transfer 137 or 24.6% of apt. (n) room in apt #504 is enlarged kitchen, family roomDetails
transfer (1) room in apt #503 to apt #504, apt #503 total area 553 sq ft. room transfer 137 or 24.6% of apt. (n) room in apt #504 is enlarged kitchen, family room | $10,000 |
| Jan 5, 2021 | Completed final sign-off Mar 2021 | 39 Waverly Pl | remodel kitchen and bathroom in kind.Details
remodel kitchen and bathroom in kind. | $34,000 |
| Dec 4, 2020 | Never finaled issued Dec 2020, no final | 606 Diamond St | remodel (1) bathroom & (1) kitchen, remove/replace finishes with 5/8 type x gyp, no structural wall changeDetails
remodel (1) bathroom & (1) kitchen, remove/replace finishes with 5/8 type x gyp, no structural wall change | $50,000 |
| Dec 4, 2019 | Completed final sign-off Dec 2020 | 88 Raymond Av | remodel one existing kitchen and one (e) bathroom at 2nd fl. rmeove & replace existing plaster & replace with 5/8" type x sheetrock & insulation in kitchen & bathroom & living room only.Details
remodel one existing kitchen and one (e) bathroom at 2nd fl. rmeove & replace existing plaster & replace with 5/8" type x sheetrock & insulation in kitchen & bathroom & living room only. | $45,000 |
| Dec 4, 2019 | Completed final sign-off Sep 2020 | 201 Hamilton St | remodel one existing kitchen at 2nd fl.Details
remodel one existing kitchen at 2nd fl. | $30,000 |
| Oct 11, 2018 | Completed final sign-off Oct 2019 | 1190 Burrows St | replace cabinets & countertop in kitchen (100 sq.ft.) only, replace bathroom linoleum w/ceramic tile, enw toilet/fanity in-kind (5'x7')Details
replace cabinets & countertop in kitchen (100 sq.ft.) only, replace bathroom linoleum w/ceramic tile, enw toilet/fanity in-kind (5'x7') | $12,000 |
| Sep 19, 2018 | Completed final sign-off Dec 2018 | 2294 31st Av | remove door installed without permit. reinstall existing window. kitchen remodel 100 sqft remodel in same locationDetails
remove door installed without permit. reinstall existing window. kitchen remodel 100 sqft remodel in same location | $17,500 |
| Aug 2, 2018 | Completed final sign-off Jul 2020 | 492 07th Av | 492 7th ave: relocate extg bedroom and one bedroom. relocate extg bathroom and one full bath. relocate and remodel extg kitchen in the 2nd floor. add structural support in common area garage.Details
492 7th ave: relocate extg bedroom and one bedroom. relocate extg bathroom and one full bath. relocate and remodel extg kitchen in the 2nd floor. add structural support in common area garage. | $20,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 539 Felton St | replace existing kitchen cabinets and counter topDetails
replace existing kitchen cabinets and counter top | $5,000 |
| May 19, 2017 | Completed final sign-off May 2018 | 167 Maynard St | to comply with nov #201613552,201544371,201757691. 1st fl: add guest bedrm, office, mudroom, entertainment, laundry & (1) full bath per plan. create new interior connection between 1st & 2nd fl. 2nd fl: reconfigure interior layout w/living rm, kitchen dining rm, family rm, (1) bedrm & (1) full bathDetails
to comply with nov #201613552,201544371,201757691. 1st fl: add guest bedrm, office, mudroom, entertainment, laundry & (1) full bath per plan. create new interior connection between 1st & 2nd fl. 2nd fl: reconfigure interior layout w/living rm, kitchen dining rm, family rm, (1) bedrm & (1) full bath | $60,000 |
| Jul 8, 2016 | Completed final sign-off Jun 2019 | 433 34th Av | add two studio units, 1 kitchen and 1 bathroom for each unit per ordinance 30-15Details
add two studio units, 1 kitchen and 1 bathroom for each unit per ordinance 30-15 | $170,000 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 329 Silver Av | construct family room, bedroom, study room & one full bathroom at ground floor. in-fill (e) lightwell match to existing exterior roof. not visible from street. remodel kitchen & bathroom @ 2nd floor.Details
construct family room, bedroom, study room & one full bathroom at ground floor. in-fill (e) lightwell match to existing exterior roof. not visible from street. remodel kitchen & bathroom @ 2nd floor. | $62,000 |
| Feb 3, 2016 | Completed final sign-off Jul 2016 | 491 Jersey St | amend pa#201512296048, remove kitchen & living room windows, repair dry rot & replace in kind at breakfast nookDetails
amend pa#201512296048, remove kitchen & living room windows, repair dry rot & replace in kind at breakfast nook | $1,000 |
| Dec 29, 2015 | Expired or cancelled expired Apr 2018 | 410 Bay Shore Bl | remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space.Details
remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space. | $30,000 |
| Dec 29, 2015 | Completed final sign-off Jul 2016 | 491 Jersey St | remodel kitchen,add new cabinets & light fixtures, demo wall between kitchen & living room.Details
remodel kitchen,add new cabinets & light fixtures, demo wall between kitchen & living room. | $18,000 |
| Oct 28, 2013 | Never finaled issued Jan 2014, no final | 763 36th Av | remove e stove in unpermitted kitchen in illegal gr fl dwelling. revert back to storage.Details
remove e stove in unpermitted kitchen in illegal gr fl dwelling. revert back to storage. | $10,000 |
| Sep 11, 2013 | Completed final sign-off Jan 2014 | 855 La Playa | replace kitchen cabinets, counter-top and sink. replace two bathroom toilets, one bathtub, and shower. new bathroom tile for bathroomDetails
replace kitchen cabinets, counter-top and sink. replace two bathroom toilets, one bathtub, and shower. new bathroom tile for bathroom | $12,000 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 2921 Scott St | remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toiletDetails
remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toilet | $6,500 |
| Jul 5, 2013 | Completed final sign-off Feb 2014 | 500 Burrows St | demolition of (e) kitchen cabinets, bathroom tiles & old shelves for storageDetails
demolition of (e) kitchen cabinets, bathroom tiles & old shelves for storage | $1,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 1000 Ashbury St | #3- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls.Details
#3- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls. | $10,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 1000 Ashbury St | #2- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls.Details
#2- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls. | $10,000 |
| Sep 6, 2012 | Completed final sign-off Oct 2013 | 227 Douglass St | removal of kitchen (level 1 & 3) see attached plans. revert level 1 back to utility room permit #8011207 w/ w/d, level 3 wet barDetails
removal of kitchen (level 1 & 3) see attached plans. revert level 1 back to utility room permit #8011207 w/ w/d, level 3 wet bar | $3,000 |
| Apr 11, 2011 | Completed final sign-off Aug 2011 | 3124 Fulton St | #5- remove existing old cabinets and replace with new cabinets in kitchen.Details
#5- remove existing old cabinets and replace with new cabinets in kitchen. | $5,500 |
| Mar 10, 2011 | Never finaled issued Aug 2011, no final | 23 Mars St | remove kitchen at 1st floor, illegal dwelling unit. remove stove, remove sink, remove false wall at denDetails
remove kitchen at 1st floor, illegal dwelling unit. remove stove, remove sink, remove false wall at den | $1,000 |
| Jan 31, 2011 | Completed final sign-off Apr 2011 | 426 02nd Av | remove kitchen cabinet and install new kitchen cabinets. replace bedroom and living room sheetrock of approx. 1000 sf. new sheetrock shall be 5/8" type x gypsum board r-13 insulation. no wall relocation. no change to existing lighting.Details
remove kitchen cabinet and install new kitchen cabinets. replace bedroom and living room sheetrock of approx. 1000 sf. new sheetrock shall be 5/8" type x gypsum board r-13 insulation. no wall relocation. no change to existing lighting. | $4,800 |
| Jan 14, 2011 | Never finaled issued Jan 2011, no final | 827 Stockton St | remove old kitchen counter and cabinet and replace in kind in assebly hall on ground floor, remove old refrigerator, no structural workDetails
remove old kitchen counter and cabinet and replace in kind in assebly hall on ground floor, remove old refrigerator, no structural work | $2,800 |
| Feb 1, 2010 | Completed final sign-off Apr 2010 | 2901 Scott St | unit #2923: replace cabinets and counter top in kitchen @ unit 2903. no new lighting, no structural work. (no window and no door work on this permit)Details
unit #2923: replace cabinets and counter top in kitchen @ unit 2903. no new lighting, no structural work. (no window and no door work on this permit) | $2,500 |
| Jun 8, 2009 | Completed final sign-off Feb 2010 | 58 Ord St | remodel kitchen and bathroom on main level of houseDetails
remodel kitchen and bathroom on main level of house | $25,000 |
| Apr 8, 2009 | Completed final sign-off Oct 2009 | 60 Ord St | remodel (e) kitchen & bathroom.Details
remodel (e) kitchen & bathroom. | $33,000 |
| Apr 8, 2009 | Completed final sign-off Feb 2010 | 58 Ord St | remodel (e) kitchen & bathroom. no lighting change.Details
remodel (e) kitchen & bathroom. no lighting change. | $33,000 |
| Apr 8, 2009 | Completed final sign-off Aug 2010 | 2901 Scott St | work @ unit# 2901 only. remodel kitchen including new counter top, sink @ same loaction & new appliances @ same location. no structural changes to walls or floors.Details
work @ unit# 2901 only. remodel kitchen including new counter top, sink @ same loaction & new appliances @ same location. no structural changes to walls or floors. | $9,200 |
| Dec 19, 2008 | Completed final sign-off Jun 2009 | 1916 Taylor St | (unit #1918 taylor)remove plaster for entire unit. replace with sheet rock install insulation for exterior wall. replace tile for bathroom. kitchen: install cabinet & replace with new stove.Details
(unit #1918 taylor)remove plaster for entire unit. replace with sheet rock install insulation for exterior wall. replace tile for bathroom. kitchen: install cabinet & replace with new stove. | $45,000 |
| Nov 6, 2008 | Completed final sign-off Jun 2011 | 354 Douglass St | remove illegal units but retain 2nd kitchen installed under application 188772 in 1930Details
remove illegal units but retain 2nd kitchen installed under application 188772 in 1930 |