Back to bathroom remodel contractors
Sincere Construction Company Inc
- Based in
- Brisbane
- On San Francisco permits
- Feb 2007 to Aug 2026
- Last 24 months
- 14 permits filed
474 permits since 2000: 389 completed, 13 in progress, 44 never finaled, 28 expired or cancelled.
Of the 44 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old, 33 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 36 completed, 1 in progress, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Jun 2026 | 869 Washington St | revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island.Details
revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island. | $100 |
| May 21, 2025 | In progress issued May 2025 | 1108 Stockton St | ground floor for (e) sheetroock to be removed and restored with 1-hour fire-rated at property line and (n) ada bathroom. ground floor wall approximate 60'x10'hDetails
ground floor for (e) sheetroock to be removed and restored with 1-hour fire-rated at property line and (n) ada bathroom. ground floor wall approximate 60'x10'h | $20,000 |
| Oct 10, 2023 | Completed final sign-off Jun 2024 | 94 Bernal Heights Bl | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in basement, 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in basement, 1st fl, 2nd fl with 1 shower pan(s). | $85,000 |
| Sep 23, 2023 | Completed final sign-off Mar 2024 | 657 Morse St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| May 16, 2023 | Completed final sign-off Jun 2026 | 867 Washington St | to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sfDetails
to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sf | $40,000 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 4663 18th St | remodel 1 (e) kitchen and one (e) bathroom. repaint entire unit. no structural work.Details
remodel 1 (e) kitchen and one (e) bathroom. repaint entire unit. no structural work. | $38,000 |
| Mar 2, 2022 | Completed final sign-off Oct 2022 | 3611 23rd St | remodel one existing one kitchen and one existing bathroom repaint entire unit. no structural workDetails
remodel one existing one kitchen and one existing bathroom repaint entire unit. no structural work | $38,000 |
| Dec 9, 2021 | Completed final sign-off Jan 2022 | 1180 Filbert St | comply with complaint# 202184931 unit 503: retile wall tile around bathtub and floor tiles for two existing bathrooms in kind. replace existing bathroom vanity top and sink in kind. paint entire unit and install new flooring.Details
comply with complaint# 202184931 unit 503: retile wall tile around bathtub and floor tiles for two existing bathrooms in kind. replace existing bathroom vanity top and sink in kind. paint entire unit and install new flooring. | $6,000 |
| Mar 30, 2021 | Never finaled filed Mar 2021, never issued | 94 Bernal Heights Bl | interior remodel of (e) 3 story with basement sfd. reconfigure for 5 bedrooms, 4.5 bathroom layout. expand rear of building underneath 3rd floor to grade below (e) basement to be excavated & converted into habitable space.Details
interior remodel of (e) 3 story with basement sfd. reconfigure for 5 bedrooms, 4.5 bathroom layout. expand rear of building underneath 3rd floor to grade below (e) basement to be excavated & converted into habitable space. | $250,000 |
| Jan 5, 2021 | Completed final sign-off Mar 2021 | 39 Waverly Pl | remodel kitchen and bathroom in kind.Details
remodel kitchen and bathroom in kind. | $34,000 |
| Dec 4, 2020 | Never finaled issued Dec 2020, no final | 606 Diamond St | remodel (1) bathroom & (1) kitchen, remove/replace finishes with 5/8 type x gyp, no structural wall changeDetails
remodel (1) bathroom & (1) kitchen, remove/replace finishes with 5/8 type x gyp, no structural wall change | $50,000 |
| Mar 4, 2020 | Completed final sign-off Nov 2021 | 227 Congo St | 2nd fl - remove bearing walls to create open floor plan. kithen & bathroom remodel, add 1 powder room @ rear of buildingDetails
2nd fl - remove bearing walls to create open floor plan. kithen & bathroom remodel, add 1 powder room @ rear of building | $50,000 |
| Dec 4, 2019 | Completed final sign-off Dec 2020 | 88 Raymond Av | remodel one existing kitchen and one (e) bathroom at 2nd fl. rmeove & replace existing plaster & replace with 5/8" type x sheetrock & insulation in kitchen & bathroom & living room only.Details
remodel one existing kitchen and one (e) bathroom at 2nd fl. rmeove & replace existing plaster & replace with 5/8" type x sheetrock & insulation in kitchen & bathroom & living room only. | $45,000 |
| Apr 5, 2019 | Completed final sign-off Jul 2019 | 3270 23rd St | relocate ada bath in the first floor, rev to pa# 201809140324Details
relocate ada bath in the first floor, rev to pa# 201809140324 | |
| Oct 11, 2018 | Completed final sign-off Oct 2019 | 1190 Burrows St | replace cabinets & countertop in kitchen (100 sq.ft.) only, replace bathroom linoleum w/ceramic tile, enw toilet/fanity in-kind (5'x7')Details
replace cabinets & countertop in kitchen (100 sq.ft.) only, replace bathroom linoleum w/ceramic tile, enw toilet/fanity in-kind (5'x7') | $12,000 |
| Aug 2, 2018 | Completed final sign-off Jul 2020 | 492 07th Av | 492 7th ave: relocate extg bedroom and one bedroom. relocate extg bathroom and one full bath. relocate and remodel extg kitchen in the 2nd floor. add structural support in common area garage.Details
492 7th ave: relocate extg bedroom and one bedroom. relocate extg bathroom and one full bath. relocate and remodel extg kitchen in the 2nd floor. add structural support in common area garage. | $20,000 |
| Jul 13, 2018 | Completed final sign-off Aug 2018 | 1466 Powell St | to comply with complaint 201867891: bathroom-replace broken shower pan. replace in-kind.maher naDetails
to comply with complaint 201867891: bathroom-replace broken shower pan. replace in-kind.maher na | $1,500 |
| Jul 10, 2018 | Completed final sign-off Oct 2019 | 1190 Burrows St | *add (1) bedroom, (1) office, (1) 3-fixtures full bath & a family rm. on 1st fl. per plan, add deck on 2nd fl. at rear of building per planDetails
*add (1) bedroom, (1) office, (1) 3-fixtures full bath & a family rm. on 1st fl. per plan, add deck on 2nd fl. at rear of building per plan | $50,000 |
| Jun 8, 2018 | Completed final sign-off Oct 2018 | 428 02nd Av | replace bathroom linoleum w/ ceramic tile. install new tilet and vanity.Details
replace bathroom linoleum w/ ceramic tile. install new tilet and vanity. | $4,500 |
| May 9, 2018 | Completed final sign-off Sep 2018 | 334 Kearny St | repair fire & eater damage in kind to damaged area only. 2/f wall 600 sf & 3/f wall 3000 sf. sheetrock ceiling (200sf, 800sf). repairs in office bathroom . no window replacement. no structural damage. applicant call for inspeciton prior to constructon.Details
repair fire & eater damage in kind to damaged area only. 2/f wall 600 sf & 3/f wall 3000 sf. sheetrock ceiling (200sf, 800sf). repairs in office bathroom . no window replacement. no structural damage. applicant call for inspeciton prior to constructon. | $50,000 |
| May 19, 2017 | Completed final sign-off May 2018 | 167 Maynard St | to comply with nov #201613552,201544371,201757691. 1st fl: add guest bedrm, office, mudroom, entertainment, laundry & (1) full bath per plan. create new interior connection between 1st & 2nd fl. 2nd fl: reconfigure interior layout w/living rm, kitchen dining rm, family rm, (1) bedrm & (1) full bathDetails
to comply with nov #201613552,201544371,201757691. 1st fl: add guest bedrm, office, mudroom, entertainment, laundry & (1) full bath per plan. create new interior connection between 1st & 2nd fl. 2nd fl: reconfigure interior layout w/living rm, kitchen dining rm, family rm, (1) bedrm & (1) full bath | $60,000 |
| Jul 8, 2016 | Completed final sign-off Jun 2019 | 433 34th Av | add two studio units, 1 kitchen and 1 bathroom for each unit per ordinance 30-15Details
add two studio units, 1 kitchen and 1 bathroom for each unit per ordinance 30-15 | $170,000 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 329 Silver Av | construct family room, bedroom, study room & one full bathroom at ground floor. in-fill (e) lightwell match to existing exterior roof. not visible from street. remodel kitchen & bathroom @ 2nd floor.Details
construct family room, bedroom, study room & one full bathroom at ground floor. in-fill (e) lightwell match to existing exterior roof. not visible from street. remodel kitchen & bathroom @ 2nd floor. | $62,000 |
| Dec 29, 2015 | Expired or cancelled expired Apr 2018 | 410 Bay Shore Bl | remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space.Details
remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space. | $30,000 |
| May 16, 2014 | Never finaled issued Jun 2014, no final | 1462 Haight St | revised of approved pa# 201401085806 field condition revision. bath a.d.a. relocation, shear walls length revised. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
revised of approved pa# 201401085806 field condition revision. bath a.d.a. relocation, shear walls length revised. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | |
| Sep 11, 2013 | Completed final sign-off Jan 2014 | 855 La Playa | replace kitchen cabinets, counter-top and sink. replace two bathroom toilets, one bathtub, and shower. new bathroom tile for bathroomDetails
replace kitchen cabinets, counter-top and sink. replace two bathroom toilets, one bathtub, and shower. new bathroom tile for bathroom | $12,000 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 2921 Scott St | remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toiletDetails
remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toilet | $6,500 |
| Jul 5, 2013 | Completed final sign-off Feb 2014 | 500 Burrows St | demolition of (e) kitchen cabinets, bathroom tiles & old shelves for storageDetails
demolition of (e) kitchen cabinets, bathroom tiles & old shelves for storage | $1,000 |
| Jun 4, 2013 | Completed final sign-off Jul 2013 | 39 Dashiell Hammett St | replace bath tub & tiles around tub. replace shower pan & renew tiles, around. change broken 36" back door. replace two faucets. replace existing microwave with hood /fan.Details
replace bath tub & tiles around tub. replace shower pan & renew tiles, around. change broken 36" back door. replace two faucets. replace existing microwave with hood /fan. | $6,500 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 1037 Stockton St | construct new ada bathroom (upgrade to (e). repair damaged floor & repair damage dry wall ceiling & wallsDetails
construct new ada bathroom (upgrade to (e). repair damaged floor & repair damage dry wall ceiling & walls | $12,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 1000 Ashbury St | #3- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls.Details
#3- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls. | $10,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 1000 Ashbury St | #2- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls.Details
#2- remodel kitchen & bathroom, new kitchen cabinet & appliances, no structural work, no change in layout, ceilings or walls. | $10,000 |
| Sep 11, 2012 | Completed final sign-off Sep 2013 | 1200 Valencia St | voluntary structural strengthening (seismic under seperate permit 2012-03-02-5246, not issued). add moment frames & plywood. upgrade bathroom for disabled access. add 3-one story steel frames & 1 plywood sheathing wall.Details
voluntary structural strengthening (seismic under seperate permit 2012-03-02-5246, not issued). add moment frames & plywood. upgrade bathroom for disabled access. add 3-one story steel frames & 1 plywood sheathing wall. | $55,000 |
| Sep 7, 2012 | Completed final sign-off Aug 2014 | 1210 Valencia St | voluntary strengthening add 2 moment frames and plywood upgrade bathroom to disabled accessDetails
voluntary strengthening add 2 moment frames and plywood upgrade bathroom to disabled access | $60,000 |
| Jun 16, 2011 | Completed final sign-off Aug 2011 | 3124 Fulton St | remove master bedroom, bathroom tiles and replace with new tiles. remove old/existing bathroom cabinet and replace it with a new bathroom cabinet. no structural changes, no wall relocation. no (n) lights, field inspector to verify plumbing or electrical permit.Details
remove master bedroom, bathroom tiles and replace with new tiles. remove old/existing bathroom cabinet and replace it with a new bathroom cabinet. no structural changes, no wall relocation. no (n) lights, field inspector to verify plumbing or electrical permit. | $8,000 |
| May 16, 2011 | Completed final sign-off Aug 2011 | 3124 Fulton St | #5 - rev. to pa#201104113870 - remove old bathroom tiles and replace with new bathroom tiles, remove old bathtub and replace with new bathtub. no other work. bathtub remove & replace + new tile surround only.Details
#5 - rev. to pa#201104113870 - remove old bathroom tiles and replace with new bathroom tiles, remove old bathtub and replace with new bathtub. no other work. bathtub remove & replace + new tile surround only. | $3,800 |
| Feb 18, 2011 | Completed final sign-off Nov 2011 | 827 Stockton St | install 2 bathrooms on mezzanine floor, equipment room in mezz. floor. upgrade exit doors. enlarge (e) bathrooms on ground floor.Details
install 2 bathrooms on mezzanine floor, equipment room in mezz. floor. upgrade exit doors. enlarge (e) bathrooms on ground floor. | $110,000 |
| Oct 20, 2009 | Completed final sign-off Feb 2010 | 58 Ord St | rear bldg. add 2 dormers at east elevation. enclose porch ( 4'-6" x 7') @ 2nd fl north east corner. convert 1st fl from storage to bedroom and full bath. replace/add/ change windows. remodel house incl. sheet rock, hardwood floors.Details
rear bldg. add 2 dormers at east elevation. enclose porch ( 4'-6" x 7') @ 2nd fl north east corner. convert 1st fl from storage to bedroom and full bath. replace/add/ change windows. remodel house incl. sheet rock, hardwood floors. | $60,000 |
| Jun 8, 2009 | Completed final sign-off Feb 2010 | 58 Ord St | remodel kitchen and bathroom on main level of houseDetails
remodel kitchen and bathroom on main level of house | $25,000 |
| Apr 8, 2009 | Completed final sign-off Oct 2009 | 60 Ord St | remodel (e) kitchen & bathroom.Details
remodel (e) kitchen & bathroom. | $33,000 |
| Apr 8, 2009 | Completed final sign-off Feb 2010 | 58 Ord St | remodel (e) kitchen & bathroom. no lighting change.Details
remodel (e) kitchen & bathroom. no lighting change. | $33,000 |
| Feb 6, 2009 | Completed final sign-off Aug 2009 | 1228 Alabama St | new bathrooms at rear porch of 2nd fl & 3rd fl, revision to pa #200611137453.Details
new bathrooms at rear porch of 2nd fl & 3rd fl, revision to pa #200611137453. | $4,000 |
| Dec 19, 2008 | Completed final sign-off Jun 2009 | 1916 Taylor St | (unit #1918 taylor)remove plaster for entire unit. replace with sheet rock install insulation for exterior wall. replace tile for bathroom. kitchen: install cabinet & replace with new stove.Details
(unit #1918 taylor)remove plaster for entire unit. replace with sheet rock install insulation for exterior wall. replace tile for bathroom. kitchen: install cabinet & replace with new stove. | $45,000 |