Sierra Construction
- Based in
- South San Francisco
- On San Francisco permits
- May 2012 to Apr 2024
- Last 24 months
- 0 permits filed
36 permits since 2000: 31 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 56 days from filing to permit and 494 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2018 | Completed final sign-off Jun 2020 | 1556 08th Av | proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floorDetails
proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floor | $200,000 |