Back to kitchen remodel contractors
Sierra Construction
- Based in
- South San Francisco
- On San Francisco permits
- May 2012 to Apr 2024
- Last 24 months
- 0 permits filed
36 permits since 2000: 31 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 16 completed, 2 never finaled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 355 Buena Vista East Av | apt 203: kitchen remodel: replace cabinets & counter tops and sink. bathroom remodel: replace plumbing fixtures. replace tiles. install recessed can lights.Details
apt 203: kitchen remodel: replace cabinets & counter tops and sink. bathroom remodel: replace plumbing fixtures. replace tiles. install recessed can lights. | $30,000 |
| Feb 3, 2023 | Completed final sign-off Jun 2023 | 1765 Pacific Av | unit #5: replace kitchen counter top, update electrical in kitchen. update bathroom with new fixtures and finishes.Details
unit #5: replace kitchen counter top, update electrical in kitchen. update bathroom with new fixtures and finishes. | $30,000 |
| Jul 18, 2022 | Completed final sign-off Oct 2022 | 138 Corwin St | top floor unit: remodel kitchen in-kind. replace cabinets and counter tops. remodel (2) bathrooms. replace plumbing fixtures install tile.Details
top floor unit: remodel kitchen in-kind. replace cabinets and counter tops. remodel (2) bathrooms. replace plumbing fixtures install tile. | $30,000 |
| Feb 19, 2021 | Completed final sign-off May 2021 | 1497 15th Av | replace kitchen cabinets, new counter top, new appliances.Details
replace kitchen cabinets, new counter top, new appliances. | $12,000 |
| Jun 30, 2020 | Completed final sign-off Aug 2020 | 1495 15th Av | replace kitchen cabinets & counter top in kindDetails
replace kitchen cabinets & counter top in kind | $12,000 |
| Jan 8, 2020 | Completed final sign-off Aug 2020 | 2859 Mission St | remodel (e) restaurant. remove portion of storefront glass and replace with single hung window. add kitchen equipment. new lightin in dining area. all other mechanical & electrical to remain.Details
remodel (e) restaurant. remove portion of storefront glass and replace with single hung window. add kitchen equipment. new lightin in dining area. all other mechanical & electrical to remain. | $100,000 |
| Aug 8, 2019 | Completed final sign-off Feb 2020 | 1765 Pacific Av | unit # 4: replace bathroom plumbing fixtures, replace tile in bathroom, rewire bathroom install recess can in kitchen. 1 hour fire rated can.Details
unit # 4: replace bathroom plumbing fixtures, replace tile in bathroom, rewire bathroom install recess can in kitchen. 1 hour fire rated can. | $12,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 640 Polk St | #102: replace 4 windows, replace kitchen cabinets, replace bathroom tile sink toilet, install n flooring. windows will be vinylDetails
#102: replace 4 windows, replace kitchen cabinets, replace bathroom tile sink toilet, install n flooring. windows will be vinyl | $20,000 |
| Apr 5, 2019 | Completed final sign-off Jul 2019 | 85 Caselli Av | kitchen remodel: replace kitchen cabinets & countertop, new sink and appliances. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3.Details
kitchen remodel: replace kitchen cabinets & countertop, new sink and appliances. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3. | $12,000 |
| Apr 5, 2019 | Completed final sign-off Feb 2020 | 490 Belvedere St | kitchen & bathroom remodel: replace kitchen cabinet & countertops, add lighting. redo shower at second floor. no additional plumbing fixture. no new wall & no existing wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5.Details
kitchen & bathroom remodel: replace kitchen cabinet & countertops, add lighting. redo shower at second floor. no additional plumbing fixture. no new wall & no existing wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5. | $12,000 |
| Nov 30, 2018 | Completed final sign-off Jun 2020 | 1556 08th Av | proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floorDetails
proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floor | $200,000 |
| Feb 9, 2018 | Completed final sign-off Feb 2019 | 712 Detroit St | remodel of kitchen: work to include demo & new construction, new plumbing, lighting, finishes & millwork. bathroom throughout: remodel of (e) bathrooms, work to include demolition & new construction. new plumbing lighting, finishes & millwork/cabinetry. living room (e) fireplace to be refinished.Details
remodel of kitchen: work to include demo & new construction, new plumbing, lighting, finishes & millwork. bathroom throughout: remodel of (e) bathrooms, work to include demolition & new construction. new plumbing lighting, finishes & millwork/cabinetry. living room (e) fireplace to be refinished. | $100,000 |
| Sep 12, 2017 | Completed final sign-off Mar 2018 | 1765 Pacific Av | unit #2. replace kitchen cabinets and counters. replace plumbing fixtures, add recess cans. update electrical in kitchen, replace bathroom's plumbing fixtures, update electrical.Details
unit #2. replace kitchen cabinets and counters. replace plumbing fixtures, add recess cans. update electrical in kitchen, replace bathroom's plumbing fixtures, update electrical. | $25,000 |
| Nov 9, 2016 | Completed final sign-off Jan 2018 | 972 Carolina St | remodel kitchen, remove non bearing wall between kitchen and office. enlarge window in kitchen. build new bath at gr flDetails
remodel kitchen, remove non bearing wall between kitchen and office. enlarge window in kitchen. build new bath at gr fl | $25,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2016 | 1275 12th Av | remodel kitchen: replace cabinets, counter tops, sink, faucet, garbage disposal. relocate outlets and sink. no change on walls.Details
remodel kitchen: replace cabinets, counter tops, sink, faucet, garbage disposal. relocate outlets and sink. no change on walls. | $15,000 |
| Feb 5, 2016 | Completed final sign-off Apr 2016 | 3152 26th St | unit 3152: replace kitchen cabinets & countersDetails
unit 3152: replace kitchen cabinets & counters | $8,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2015 | 47 Mirabel Av | kitchen remodeling: replace kitchen cabinets and counter, new sink and appliances, no change in wall, layout & opening change. no lighting change.Details
kitchen remodeling: replace kitchen cabinets and counter, new sink and appliances, no change in wall, layout & opening change. no lighting change. | $10,000 |
| May 21, 2012 | Never finaled issued May 2012, no final | 2171 Mission St | all work in unit 301 - relocate kitchen cabinets, appliances, gas line. non-structure.Details
all work in unit 301 - relocate kitchen cabinets, appliances, gas line. non-structure. | $3,000 |