Back to bathroom remodel contractors
Sierra Construction
- Based in
- South San Francisco
- On San Francisco permits
- May 2012 to Apr 2024
- Last 24 months
- 0 permits filed
36 permits since 2000: 31 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 17 completed, 2 never finaled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 355 Buena Vista East Av | apt 203: kitchen remodel: replace cabinets & counter tops and sink. bathroom remodel: replace plumbing fixtures. replace tiles. install recessed can lights.Details
apt 203: kitchen remodel: replace cabinets & counter tops and sink. bathroom remodel: replace plumbing fixtures. replace tiles. install recessed can lights. | $30,000 |
| May 21, 2023 | Completed final sign-off Aug 2023 | 521 29th St | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Feb 3, 2023 | Completed final sign-off Jun 2023 | 1765 Pacific Av | unit #5: replace kitchen counter top, update electrical in kitchen. update bathroom with new fixtures and finishes.Details
unit #5: replace kitchen counter top, update electrical in kitchen. update bathroom with new fixtures and finishes. | $30,000 |
| Jul 18, 2022 | Completed final sign-off Oct 2022 | 138 Corwin St | top floor unit: remodel kitchen in-kind. replace cabinets and counter tops. remodel (2) bathrooms. replace plumbing fixtures install tile.Details
top floor unit: remodel kitchen in-kind. replace cabinets and counter tops. remodel (2) bathrooms. replace plumbing fixtures install tile. | $30,000 |
| Apr 7, 2021 | Completed final sign-off Aug 2021 | 355 Bryant St | replace bathroom fixtures. new tile, new plumbing fixtures. new electricl fixtures.Details
replace bathroom fixtures. new tile, new plumbing fixtures. new electricl fixtures. | $12,000 |
| Aug 8, 2019 | Completed final sign-off Feb 2020 | 1765 Pacific Av | unit # 4: replace bathroom plumbing fixtures, replace tile in bathroom, rewire bathroom install recess can in kitchen. 1 hour fire rated can.Details
unit # 4: replace bathroom plumbing fixtures, replace tile in bathroom, rewire bathroom install recess can in kitchen. 1 hour fire rated can. | $12,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 640 Polk St | #101: replace 4 windows, replace partial subfloor, replace tile sink toilet in bathroom, replace flooring. windows will be vinylDetails
#101: replace 4 windows, replace partial subfloor, replace tile sink toilet in bathroom, replace flooring. windows will be vinyl | $15,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 640 Polk St | #102: replace 4 windows, replace kitchen cabinets, replace bathroom tile sink toilet, install n flooring. windows will be vinylDetails
#102: replace 4 windows, replace kitchen cabinets, replace bathroom tile sink toilet, install n flooring. windows will be vinyl | $20,000 |
| Apr 5, 2019 | Completed final sign-off Feb 2020 | 490 Belvedere St | kitchen & bathroom remodel: replace kitchen cabinet & countertops, add lighting. redo shower at second floor. no additional plumbing fixture. no new wall & no existing wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5.Details
kitchen & bathroom remodel: replace kitchen cabinet & countertops, add lighting. redo shower at second floor. no additional plumbing fixture. no new wall & no existing wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5. | $12,000 |
| Jan 17, 2019 | Completed final sign-off Mar 2020 | 161 Hartford St | convert ground floor storage into bedroom w/ bathDetails
convert ground floor storage into bedroom w/ bath | $30,000 |
| Nov 30, 2018 | Completed final sign-off Jun 2020 | 1556 08th Av | proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floorDetails
proposed kitchen remodel, reconfigure upper floor bedroom & bathroom layout; add 792 sf of habitable sapce in lower floor. (2) new bedrooms and bathroom; reconfigure (e) stair to lower floor | $200,000 |
| Feb 9, 2018 | Completed final sign-off Feb 2019 | 712 Detroit St | remodel of kitchen: work to include demo & new construction, new plumbing, lighting, finishes & millwork. bathroom throughout: remodel of (e) bathrooms, work to include demolition & new construction. new plumbing lighting, finishes & millwork/cabinetry. living room (e) fireplace to be refinished.Details
remodel of kitchen: work to include demo & new construction, new plumbing, lighting, finishes & millwork. bathroom throughout: remodel of (e) bathrooms, work to include demolition & new construction. new plumbing lighting, finishes & millwork/cabinetry. living room (e) fireplace to be refinished. | $100,000 |
| Sep 12, 2017 | Completed final sign-off Mar 2018 | 1765 Pacific Av | unit #2. replace kitchen cabinets and counters. replace plumbing fixtures, add recess cans. update electrical in kitchen, replace bathroom's plumbing fixtures, update electrical.Details
unit #2. replace kitchen cabinets and counters. replace plumbing fixtures, add recess cans. update electrical in kitchen, replace bathroom's plumbing fixtures, update electrical. | $25,000 |
| Jul 25, 2017 | Completed final sign-off Oct 2019 | 667 Orizaba Av | 2-story horizontal addition to (e) 2-story residence. addition is to the rear of the lot. (n) bathroom on 2nd floor.Details
2-story horizontal addition to (e) 2-story residence. addition is to the rear of the lot. (n) bathroom on 2nd floor. | $100,000 |
| Jul 21, 2017 | Completed final sign-off Jan 2018 | 972 Carolina St | remodel bathroom at hallway. replace plumbing fixtures. install new light fitures. new tiles. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel bathroom at hallway. replace plumbing fixtures. install new light fitures. new tiles. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $15,000 |
| Nov 9, 2016 | Completed final sign-off Jan 2018 | 972 Carolina St | remodel kitchen, remove non bearing wall between kitchen and office. enlarge window in kitchen. build new bath at gr flDetails
remodel kitchen, remove non bearing wall between kitchen and office. enlarge window in kitchen. build new bath at gr fl | $25,000 |
| Jul 19, 2016 | Completed final sign-off Nov 2016 | 972 Carolina St | work to be at rear cottage, repair termite damage studs & floor joists. replace plumbing fixtures , install tile in shower, bathroom repair everything in the same location.Details
work to be at rear cottage, repair termite damage studs & floor joists. replace plumbing fixtures , install tile in shower, bathroom repair everything in the same location. | $15,000 |
| Feb 13, 2015 | Completed final sign-off Jun 2015 | 519 Chenery St | remodel 2 bathrooms on 2nd floor. replace plumbing fixtures. install tile on floor, shower tile & additoinal lighting. (electrical & plumbing under separate permit.Details
remodel 2 bathrooms on 2nd floor. replace plumbing fixtures. install tile on floor, shower tile & additoinal lighting. (electrical & plumbing under separate permit. | $15,000 |
| Feb 26, 2014 | Completed final sign-off Oct 2014 | 34 Ford St | remodel guest bathroom. replace bathroom fixtures. replace tiel, replace window. upgrade electrical in bathroom. 2nd floor, walls remain in placed.Details
remodel guest bathroom. replace bathroom fixtures. replace tiel, replace window. upgrade electrical in bathroom. 2nd floor, walls remain in placed. | $12,000 |