Shameless Design
- Based in
- Walnut Creek
- On San Francisco permits
- Nov 2007 to Sep 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 20 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2013 | Completed final sign-off Apr 2014 | 863 Kansas St | expand bottom level bathroom by moving non bearing wall. add shower to bathroom. add wall at bottom of (e) spiral staircase with pocket doors. remove wet bar & cabinetsDetails
expand bottom level bathroom by moving non bearing wall. add shower to bathroom. add wall at bottom of (e) spiral staircase with pocket doors. remove wet bar & cabinets | $5,000 |
| Nov 29, 2007 | Completed final sign-off Mar 2008 | 3016 Pine St | repair existing stairs, replace stringers, raise handrail, water proof, reinforce. replace as existing. less than 50%.Details
repair existing stairs, replace stringers, raise handrail, water proof, reinforce. replace as existing. less than 50%. | $7,000 |