Back to bathroom remodel contractors
Shameless Design
- Based in
- Walnut Creek
- On San Francisco permits
- Nov 2007 to Sep 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 16 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2015 | Completed final sign-off Jan 2016 | 266 18th Av | interior remodel to 2nd flr and garage level - relocate (e) bathroom, add 2 (ne) bathrooms, new exterior sliding door and relocation of(e) partitions - new conditioned space from garage level storage space.Details
interior remodel to 2nd flr and garage level - relocate (e) bathroom, add 2 (ne) bathrooms, new exterior sliding door and relocation of(e) partitions - new conditioned space from garage level storage space. | $50,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2016 | 266 18th Av | move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor.Details
move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor. | $30,000 |
| Aug 23, 2013 | Completed final sign-off Apr 2014 | 863 Kansas St | expand bottom level bathroom by moving non bearing wall. add shower to bathroom. add wall at bottom of (e) spiral staircase with pocket doors. remove wet bar & cabinetsDetails
expand bottom level bathroom by moving non bearing wall. add shower to bathroom. add wall at bottom of (e) spiral staircase with pocket doors. remove wet bar & cabinets | $5,000 |
| Aug 19, 2013 | Completed final sign-off Oct 2013 | 30 07th St | remove tile from bathroom walls, cap shower outlet. install sheet rock on walls.Details
remove tile from bathroom walls, cap shower outlet. install sheet rock on walls. | $1,500 |