Back to kitchen remodel contractors
Shameless Design
- Based in
- Walnut Creek
- On San Francisco permits
- Nov 2007 to Sep 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2021 | Completed final sign-off Sep 2021 | 515 Masonic Av | unit #3: kitchen remodel. new cabinets, new counter, and new flooring (no moving walls)Details
unit #3: kitchen remodel. new cabinets, new counter, and new flooring (no moving walls) | $13,000 |
| Dec 15, 2020 | Completed final sign-off Apr 2022 | 834 Castro St | unit 2: remodel kitchen in-kind. replace cabinets, countertops, flooring.Details
unit 2: remodel kitchen in-kind. replace cabinets, countertops, flooring. | $25,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2016 | 266 18th Av | move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor.Details
move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor. | $30,000 |