Service Master Restoration Svcs/Sharjo
- Based in
- Benecia
- On San Francisco permits
- Apr 2023 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 13 completed, 7 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 in progress, 1 never finaled. Typically 128 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | In progress issued Aug 2026 | 1239 Geneva Av | to comply with nov # 202536212 commercial: r/r damaged drywall, insulation and electrical. hallways & stairways: r/r damaged drywall and insulation. unit 2: r/r damaged wall framing, windows, doors, drywall, inulation, test (e) electrical and plumbing.Details
to comply with nov # 202536212 commercial: r/r damaged drywall, insulation and electrical. hallways & stairways: r/r damaged drywall and insulation. unit 2: r/r damaged wall framing, windows, doors, drywall, inulation, test (e) electrical and plumbing. | $165,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1281 08th Av | soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permitDetails
soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permit | $350,000 |