Back to kitchen remodel contractors
Service Master Restoration Svcs/Sharjo
- Based in
- Benecia
- On San Francisco permits
- Apr 2023 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 13 completed, 7 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 2 completed, 3 in progress, 2 never finaled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 3686 17th St | kitchen remodel: remove and replace ceiling sheetrock, approx 120 sq ft. remove and replace cabinets, and counter tops, like for like, reuse sink and appliances. all work interior in kitchen only. paint kitchen. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
kitchen remodel: remove and replace ceiling sheetrock, approx 120 sq ft. remove and replace cabinets, and counter tops, like for like, reuse sink and appliances. all work interior in kitchen only. paint kitchen. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $20,000 |
| Mar 19, 2026 | In progress issued Apr 2026 | 1301 Shafter Av | scope is limited to fire damge restoration (like for like).no structural damage, replacement of interior finishes and windows to match original. existing non load bearing partition wall between kitchen and dining room is removed. to comply with nov# 2025 34513.Details
scope is limited to fire damge restoration (like for like).no structural damage, replacement of interior finishes and windows to match original. existing non load bearing partition wall between kitchen and dining room is removed. to comply with nov# 2025 34513. | $350,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 383 Paris St | like for like replacement of insulation, drywall, flooring in kitchen. drywall in bedroom and bathroom, flooring in dining and second bedroom. kitchen cabients.Details
like for like replacement of insulation, drywall, flooring in kitchen. drywall in bedroom and bathroom, flooring in dining and second bedroom. kitchen cabients. | $50,000 |
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 336 Lombard St | back elevation patio backyard: (2) windows - 1 window livingroom and 1 kitchen. 1 exterior door remove reinstall new -in kind.Details
back elevation patio backyard: (2) windows - 1 window livingroom and 1 kitchen. 1 exterior door remove reinstall new -in kind. | $3,500 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1281 08th Av | soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permitDetails
soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permit | $350,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1279 08th Av | soft demo in units from fire damage remove fire debris and wall finishes, all common areas unit a-all walls , unit 104-kitchen, unit 105-all, unit 106 no work, unit 204 kitchen, unit 205 all, init 206 no work. all reconstruction under seperate permitDetails
soft demo in units from fire damage remove fire debris and wall finishes, all common areas unit a-all walls , unit 104-kitchen, unit 105-all, unit 106 no work, unit 204 kitchen, unit 205 all, init 206 no work. all reconstruction under seperate permit | $350,000 |
| Jun 28, 2023 | Completed final sign-off Dec 2023 | 336 Lombard St | replace insulation and drywall. remodel kitchen cabinets, flooring and painting. replace and remodel in-kind. no layout change.Details
replace insulation and drywall. remodel kitchen cabinets, flooring and painting. replace and remodel in-kind. no layout change. | $75,000 |