Back to bathroom remodel contractors
Service Master Restoration Svcs/Sharjo
- Based in
- Benecia
- On San Francisco permits
- Apr 2023 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 13 completed, 7 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 1 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | In progress issued Feb 2026 | 383 Paris St | like for like replacement of insulation, drywall, flooring in kitchen. drywall in bedroom and bathroom, flooring in dining and second bedroom. kitchen cabients.Details
like for like replacement of insulation, drywall, flooring in kitchen. drywall in bedroom and bathroom, flooring in dining and second bedroom. kitchen cabients. | $50,000 |
| Apr 4, 2024 | In progress issued Jul 2025 | 2969 Mission St | fire damage repair: including removal & replacement of the following at the rear of the building: roof/ceiling framing, wall framing on 2/f & finishes. minor electrical work. ada upgrades to bathroom & break room & entrance.Details
fire damage repair: including removal & replacement of the following at the rear of the building: roof/ceiling framing, wall framing on 2/f & finishes. minor electrical work. ada upgrades to bathroom & break room & entrance. | $75,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1281 08th Av | soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permitDetails
soft demo in affected units 101,106,104,201,204,206, and common stairways caused by fire. remove fire debris and wall finishes all common areas. unit 101 kitchen and bath unit 102 bath unit 103 kitchen, unit 201 kitchen unit 202 bath unit 203 kitchen. all reconstruction under seperate permit | $350,000 |
| Aug 11, 2023 | Completed final sign-off Dec 2023 | 336 Lombard St | bathroom remodel like for like.Details
bathroom remodel like for like. | $5,000 |