Back to kitchen remodel contractors
Seamus R Cudden
- Based in
- Daly City
- On San Francisco permits
- Apr 2001 to Sep 2025
- Last 24 months
- 2 permits filed
50 permits since 2000: 43 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Feb 2025 | 264 Diamond St | reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl.Details
reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl. | $250,000 |
| Aug 28, 2019 | Completed final sign-off Jun 2020 | 342 29th Av | replace existing kitchen cabinets in kind on 2/fDetails
replace existing kitchen cabinets in kind on 2/f | $60,000 |
| Jan 2, 2018 | Never finaled issued Nov 2018, no final | 1474 06th Av | 1st fl: garage remodel and horizontal addition (n) stairs, bed,bath, widen garage door,(n) hvac. 2nd fl: kitchen and dining room remodel, relocate powder room, stair from 1st fl to roof deck. 3rd fl: bathroom remodel,combine two bed into master suit with full bath, roof terrace, sky lightDetails
1st fl: garage remodel and horizontal addition (n) stairs, bed,bath, widen garage door,(n) hvac. 2nd fl: kitchen and dining room remodel, relocate powder room, stair from 1st fl to roof deck. 3rd fl: bathroom remodel,combine two bed into master suit with full bath, roof terrace, sky light | $500,000 |
| Apr 24, 2017 | Completed final sign-off Feb 2021 | 501 Teresita Bl | add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry.Details
add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry. | $400,000 |
| Apr 7, 2015 | Completed final sign-off Feb 2016 | 2360 Vallejo St | kitchen remodel down to the studs with plumbing and electrical work. replace rear facing window with new wood framed double hung.Details
kitchen remodel down to the studs with plumbing and electrical work. replace rear facing window with new wood framed double hung. | $60,000 |
| Aug 22, 2014 | Completed final sign-off Sep 2014 | 371 Oak St | replace kitchen countertops ; to comply with cec150.0(k)3Details
replace kitchen countertops ; to comply with cec150.0(k)3 | $3,500 |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 1083 Jamestown Av | replace kitchen cabinets and counter tops; replace bathroom fixturesDetails
replace kitchen cabinets and counter tops; replace bathroom fixtures | $8,000 |
| Dec 27, 2012 | Completed final sign-off Mar 2013 | 44 Vista Verde Ct | repair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electricalDetails
repair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electrical | $30,000 |
| Feb 16, 2012 | Completed final sign-off Sep 2012 | 100 Berkeley Wy | kitchen and dining room remodel & enlarge.Details
kitchen and dining room remodel & enlarge. | $85,000 |
| May 26, 2011 | Completed final sign-off Nov 2011 | 278 Staples Av | to comply w/mov #201078655 - remodel (e) upper flr bedrooms, bath, living rm & kitchen. remodel (e) lower floor for new bedrooms & bath. infill ground floor level below upper floor (e) dining & bath. create new interior stair between 1st & 2nd floor.Details
to comply w/mov #201078655 - remodel (e) upper flr bedrooms, bath, living rm & kitchen. remodel (e) lower floor for new bedrooms & bath. infill ground floor level below upper floor (e) dining & bath. create new interior stair between 1st & 2nd floor. | $120,000 |
| Nov 12, 2010 | Completed final sign-off Jul 2011 | 31 Marietta Dr | fire damage, demo and remove damaged members, finishes and fixtures. relace all damaged interior finishes. kitchen and bath remodel. relocate 1 bat, add 2 baths, split large bedroom into 2 bedrooms. new compliant stairway. upgrade wiring and plumbing (n) roofingDetails
fire damage, demo and remove damaged members, finishes and fixtures. relace all damaged interior finishes. kitchen and bath remodel. relocate 1 bat, add 2 baths, split large bedroom into 2 bedrooms. new compliant stairway. upgrade wiring and plumbing (n) roofing | $200,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 31 Marietta Dr | fire damaged, demo & remove damaged member. ie; sheetrock, doors, kitchen cabinets, floor coverings, no structural wall to be removed. replace hardwood flr. throughout room to be replace in-kind. remodel bathroom & kitchen in kind. all work replace in kind.Details
fire damaged, demo & remove damaged member. ie; sheetrock, doors, kitchen cabinets, floor coverings, no structural wall to be removed. replace hardwood flr. throughout room to be replace in-kind. remodel bathroom & kitchen in kind. all work replace in kind. | $7,000 |
| Aug 4, 2010 | Completed final sign-off Nov 2010 | 324 Fair Oaks St | kitchen remodel: remove & replace (e) cabinets, remove & replace kitchen exterior door.Details
kitchen remodel: remove & replace (e) cabinets, remove & replace kitchen exterior door. | $30,000 |
| Aug 3, 2009 | Completed final sign-off Dec 2009 | 1514 Clay St | kitchen, bath, bedroom, living room remodel. convert living room into 2nd bedroom on 1st fl. replace single pane wood windows( at front and rear) in kind with dual pane to match.Details
kitchen, bath, bedroom, living room remodel. convert living room into 2nd bedroom on 1st fl. replace single pane wood windows( at front and rear) in kind with dual pane to match. | $85,000 |
| Jul 26, 2007 | Completed final sign-off Aug 2007 | 381 Corbett Av | repair dry-rot above rear entry door. upgrade interior 4x4 support bean to 4x6 at kitchen pantry area.Details
repair dry-rot above rear entry door. upgrade interior 4x4 support bean to 4x6 at kitchen pantry area. | $700 |
| Apr 26, 2001 | Expired or cancelled expired Aug 2001 | 830 Peralta Av | remodel and replacement of kitchen cabinets countertop finished in fermicaDetails
remodel and replacement of kitchen cabinets countertop finished in fermica | $5,000 |