50 permits since 2000: 43 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 4 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Feb 2025 | 264 Diamond St | reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl.Details
reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl. | $250,000 |
| Jan 2, 2018 | Never finaled issued Nov 2018, no final | 1474 06th Av | 1st fl: garage remodel and horizontal addition (n) stairs, bed,bath, widen garage door,(n) hvac. 2nd fl: kitchen and dining room remodel, relocate powder room, stair from 1st fl to roof deck. 3rd fl: bathroom remodel,combine two bed into master suit with full bath, roof terrace, sky lightDetails
1st fl: garage remodel and horizontal addition (n) stairs, bed,bath, widen garage door,(n) hvac. 2nd fl: kitchen and dining room remodel, relocate powder room, stair from 1st fl to roof deck. 3rd fl: bathroom remodel,combine two bed into master suit with full bath, roof terrace, sky light | $500,000 |
| Aug 2, 2017 | Completed final sign-off Apr 2019 | 1722 08th Av | remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry.Details
remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry. | $180,000 |
| Apr 24, 2017 | Completed final sign-off Feb 2021 | 501 Teresita Bl | add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry.Details
add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry. | $400,000 |
| Aug 5, 2016 | Completed final sign-off Mar 2017 | 1692 08th Av | remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/hDetails
remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/h | $150,000 |
| Mar 25, 2015 | Completed final sign-off Jun 2015 | 126 Justin Dr | install washer/ dryer in 1st floor bathroom; replace bathtub with lvanity in 1/f bathroomDetails
install washer/ dryer in 1st floor bathroom; replace bathtub with lvanity in 1/f bathroom | $6,000 |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 1083 Jamestown Av | replace kitchen cabinets and counter tops; replace bathroom fixturesDetails
replace kitchen cabinets and counter tops; replace bathroom fixtures | $8,000 |
| May 26, 2011 | Completed final sign-off Nov 2011 | 278 Staples Av | to comply w/mov #201078655 - remodel (e) upper flr bedrooms, bath, living rm & kitchen. remodel (e) lower floor for new bedrooms & bath. infill ground floor level below upper floor (e) dining & bath. create new interior stair between 1st & 2nd floor.Details
to comply w/mov #201078655 - remodel (e) upper flr bedrooms, bath, living rm & kitchen. remodel (e) lower floor for new bedrooms & bath. infill ground floor level below upper floor (e) dining & bath. create new interior stair between 1st & 2nd floor. | $120,000 |
| Nov 12, 2010 | Completed final sign-off Jul 2011 | 31 Marietta Dr | fire damage, demo and remove damaged members, finishes and fixtures. relace all damaged interior finishes. kitchen and bath remodel. relocate 1 bat, add 2 baths, split large bedroom into 2 bedrooms. new compliant stairway. upgrade wiring and plumbing (n) roofingDetails
fire damage, demo and remove damaged members, finishes and fixtures. relace all damaged interior finishes. kitchen and bath remodel. relocate 1 bat, add 2 baths, split large bedroom into 2 bedrooms. new compliant stairway. upgrade wiring and plumbing (n) roofing | $200,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 31 Marietta Dr | fire damaged, demo & remove damaged member. ie; sheetrock, doors, kitchen cabinets, floor coverings, no structural wall to be removed. replace hardwood flr. throughout room to be replace in-kind. remodel bathroom & kitchen in kind. all work replace in kind.Details
fire damaged, demo & remove damaged member. ie; sheetrock, doors, kitchen cabinets, floor coverings, no structural wall to be removed. replace hardwood flr. throughout room to be replace in-kind. remodel bathroom & kitchen in kind. all work replace in kind. | $7,000 |
| Aug 3, 2009 | Completed final sign-off Dec 2009 | 1514 Clay St | kitchen, bath, bedroom, living room remodel. convert living room into 2nd bedroom on 1st fl. replace single pane wood windows( at front and rear) in kind with dual pane to match.Details
kitchen, bath, bedroom, living room remodel. convert living room into 2nd bedroom on 1st fl. replace single pane wood windows( at front and rear) in kind with dual pane to match. | $85,000 |