Seamus R Cudden
- Based in
- Daly City
- On San Francisco permits
- Apr 2001 to Sep 2025
- Last 24 months
- 2 permits filed
50 permits since 2000: 43 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 7 completed. Typically 123 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Feb 2025 | 264 Diamond St | reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl.Details
reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl. | $250,000 |
| Nov 9, 2021 | Completed final sign-off Dec 2022 | 235 Laidley St | repair extg 2 story rear deck. replae and upgrade extg wood columns and beam in same location. replace extg guardrail to metal. replace extg stair with spiral stairs. no change to size, height, & egress.Details
repair extg 2 story rear deck. replae and upgrade extg wood columns and beam in same location. replace extg guardrail to metal. replace extg stair with spiral stairs. no change to size, height, & egress. | $30,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 4249 21st St | repair dry rot at upp[er landing/deck at juncture of window & deckDetails
repair dry rot at upp[er landing/deck at juncture of window & deck | $4,800 |
| Aug 2, 2017 | Completed final sign-off Apr 2019 | 1722 08th Av | remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry.Details
remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry. | $180,000 |
| Aug 5, 2016 | Completed final sign-off Mar 2017 | 1692 08th Av | remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/hDetails
remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/h | $150,000 |
| Mar 31, 2016 | Completed final sign-off Jun 2017 | 369 Oak St | infill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit.Details
infill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit. | $125,000 |
| Dec 27, 2012 | Completed final sign-off Mar 2013 | 44 Vista Verde Ct | repair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electricalDetails
repair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electrical | $30,000 |