Permit GraphShortlistSan Francisco building permits since 2000

Seamus R Cudden

Contractor license
756223
State license record
Based in
Daly City
On San Francisco permits
Apr 2001 to Sep 2025
Last 24 months
2 permits filed

50 permits since 2000: 43 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.

Of the 3 never-finaled permits, 3 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Deck permits

AllRoof deck 2Deck 7Stairs 15Kitchen remodel 16Bathroom remodel 11

7 deck permits: 7 completed. Typically 123 days from filing to permit and 204 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 16, 2021Completed
final sign-off Feb 2025
264 Diamond Streconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl.
Details
Permit
202111162462
Status
complete
Filed
Nov 16, 2021
Permit issued
Jan 20, 2023
Final sign-off
Feb 14, 2025
Declared cost
$250,000
Address
264 Diamond St

reconstruct garage lvl storage area at rear of bldg, infill 49sf at gr lvl. infill 142sf at (e) 1st lvl mud room. renovate & expand (e) kitchen & relocate 1/2 bath on 1st lvl. reconstruct (e) 2nd lvl office with 32sf added. construct new rear deck & stairs at 1st & decks over infill space at 2nd fl.

Open the permit page

$250,000
Nov 9, 2021Completed
final sign-off Dec 2022
235 Laidley Strepair extg 2 story rear deck. replae and upgrade extg wood columns and beam in same location. replace extg guardrail to metal. replace extg stair with spiral stairs. no change to size, height, & egress.
Details
Permit
202111092061
Status
complete
Filed
Nov 9, 2021
Permit issued
May 27, 2022
Final sign-off
Dec 6, 2022
Declared cost
$30,000
Address
235 Laidley St

repair extg 2 story rear deck. replae and upgrade extg wood columns and beam in same location. replace extg guardrail to metal. replace extg stair with spiral stairs. no change to size, height, & egress.

Open the permit page

$30,000
Aug 31, 2020Completed
final sign-off Nov 2020
4249 21st Strepair dry rot at upp[er landing/deck at juncture of window & deck
Details
Permit
202008312951
Status
complete
Filed
Aug 31, 2020
Permit issued
Aug 31, 2020
Final sign-off
Nov 17, 2020
Declared cost
$4,800
Address
4249 21st St

repair dry rot at upp[er landing/deck at juncture of window & deck

Open the permit page

$4,800
Aug 2, 2017Completed
final sign-off Apr 2019
1722 08th Avremove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry.
Details
Permit
201708023652
Status
complete
Filed
Aug 2, 2017
Permit issued
May 4, 2018
Final sign-off
Apr 1, 2019
Declared cost
$180,000
Address
1722 08th Av

remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry.

Open the permit page

$180,000
Aug 5, 2016Completed
final sign-off Mar 2017
1692 08th Avremodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/h
Details
Permit
201608054345
Status
complete
Filed
Aug 5, 2016
Permit issued
Aug 9, 2016
Final sign-off
Mar 1, 2017
Declared cost
$150,000
Address
1692 08th Av

remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/h

Open the permit page

$150,000
Mar 31, 2016Completed
final sign-off Jun 2017
369 Oak Stinfill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit.
Details
Permit
201603313570
Status
complete
Filed
Mar 31, 2016
Permit issued
Aug 1, 2016
Final sign-off
Jun 15, 2017
Declared cost
$125,000
Address
369 Oak St

infill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit.

Open the permit page

$125,000
Dec 27, 2012Completed
final sign-off Mar 2013
44 Vista Verde Ctrepair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electrical
Details
Permit
201212276907
Status
complete
Filed
Dec 27, 2012
Permit issued
Dec 27, 2012
Final sign-off
Mar 12, 2013
Declared cost
$30,000
Address
44 Vista Verde Ct

repair dry rot at existing rear decks less than 50%; replace existing glaze aluminum windows at rear of property not visable from street; replace kitchen countertops and upgrade kitchen electrical

Open the permit page

$30,000