Back to kitchen remodel contractors
Santos Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 12 permits filed
36 permits since 2000: 29 completed, 3 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 in progress. Typically 0 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 1896 Pacific Av | unit 202: revision to bpa: 202606012236: remodel/ reconfigure: (e) kitchen, primary bath and (e) bath.Details
unit 202: revision to bpa: 202606012236: remodel/ reconfigure: (e) kitchen, primary bath and (e) bath. | $10,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1896 Pacific Av | kitchen and 2 bath remodel.Details
kitchen and 2 bath remodel. | $98,000 |
| May 18, 2026 | In progress issued May 2026 | 1896 Pacific Av | exploratory soft demo only kitchen and (2) bathroom remodel. no walls will be removed. additional permt required to re-state removed.Details
exploratory soft demo only kitchen and (2) bathroom remodel. no walls will be removed. additional permt required to re-state removed. | $10,000 |
| Jan 30, 2025 | Completed final sign-off Mar 2026 | 1958 Vallejo St | unit 7; remodel kitchen reconfig layout, moving sink, stove, oven, and cabinets. reconfig (2)full baths, remodel (1)powder, change(1) full to powder, bedrooms, and(4) bathrooms, remove/configure (e) non structural partitions, (3) replace (e) windows aluminum clad wood, double hung at front facade.Details
unit 7; remodel kitchen reconfig layout, moving sink, stove, oven, and cabinets. reconfig (2)full baths, remodel (1)powder, change(1) full to powder, bedrooms, and(4) bathrooms, remove/configure (e) non structural partitions, (3) replace (e) windows aluminum clad wood, double hung at front facade. | $350,000 |
| Jan 4, 2024 | Completed final sign-off Mar 2024 | 1262 47th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2023 | 18 Jordan Av | one kitchen remodel in kind. three window replacement. u=.30max in kind - in the back.Details
one kitchen remodel in kind. three window replacement. u=.30max in kind - in the back. | $60,000 |
| Feb 3, 2023 | Completed final sign-off Aug 2023 | 87 Vicksburg St | remodel kitchen in-kind. upgrade electrical panel from 100amp to 200 amp.Details
remodel kitchen in-kind. upgrade electrical panel from 100amp to 200 amp. | $75,000 |
| Nov 9, 2022 | Completed final sign-off Feb 2024 | 1700 Jones St | unit 3: remodel (3) bathrooms, add (1/2) bath, expand guest bedroom #3 into kitchen, remodel kitchen, replace windows @ kitchen area nonstreet facing.Details
unit 3: remodel (3) bathrooms, add (1/2) bath, expand guest bedroom #3 into kitchen, remodel kitchen, replace windows @ kitchen area nonstreet facing. | $319,000 |
| Aug 10, 2022 | Completed final sign-off Apr 2025 | 148 Cervantes Bl | expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen.Details
expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen. | $150,000 |
| Mar 15, 2022 | Completed final sign-off Oct 2022 | 871 24th Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $48,000 |