Back to bathroom remodel contractors
Santos Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 12 permits filed
36 permits since 2000: 29 completed, 3 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 3 in progress. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 1896 Pacific Av | unit 202: revision to bpa: 202606012236: remodel/ reconfigure: (e) kitchen, primary bath and (e) bath.Details
unit 202: revision to bpa: 202606012236: remodel/ reconfigure: (e) kitchen, primary bath and (e) bath. | $10,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1896 Pacific Av | kitchen and 2 bath remodel.Details
kitchen and 2 bath remodel. | $98,000 |
| May 18, 2026 | In progress issued May 2026 | 1896 Pacific Av | exploratory soft demo only kitchen and (2) bathroom remodel. no walls will be removed. additional permt required to re-state removed.Details
exploratory soft demo only kitchen and (2) bathroom remodel. no walls will be removed. additional permt required to re-state removed. | $10,000 |
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 24 Addison St | in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $100,000 |
| Jan 14, 2026 | Completed final sign-off Mar 2026 | 83 Crags Ct | remodel bathroom remodel in kindDetails
remodel bathroom remodel in kind | $50,000 |
| Jan 30, 2025 | Completed final sign-off Mar 2026 | 1958 Vallejo St | unit 7; remodel kitchen reconfig layout, moving sink, stove, oven, and cabinets. reconfig (2)full baths, remodel (1)powder, change(1) full to powder, bedrooms, and(4) bathrooms, remove/configure (e) non structural partitions, (3) replace (e) windows aluminum clad wood, double hung at front facade.Details
unit 7; remodel kitchen reconfig layout, moving sink, stove, oven, and cabinets. reconfig (2)full baths, remodel (1)powder, change(1) full to powder, bedrooms, and(4) bathrooms, remove/configure (e) non structural partitions, (3) replace (e) windows aluminum clad wood, double hung at front facade. | $350,000 |
| Jan 27, 2025 | Completed final sign-off Apr 2025 | 177 Wool St | bathroom remodel. no wall removal or layout changes. in kind like for likeDetails
bathroom remodel. no wall removal or layout changes. in kind like for like | $25,000 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 1425 Lake St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $50,000 |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 152 Cervantes Bl | bathroom remodel. demo wall to enlarge bathroomDetails
bathroom remodel. demo wall to enlarge bathroom | $40,000 |
| Jan 4, 2024 | Completed final sign-off Mar 2024 | 1262 47th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| Nov 9, 2022 | Completed final sign-off Feb 2024 | 1700 Jones St | unit 3: remodel (3) bathrooms, add (1/2) bath, expand guest bedroom #3 into kitchen, remodel kitchen, replace windows @ kitchen area nonstreet facing.Details
unit 3: remodel (3) bathrooms, add (1/2) bath, expand guest bedroom #3 into kitchen, remodel kitchen, replace windows @ kitchen area nonstreet facing. | $319,000 |
| Sep 14, 2022 | Completed final sign-off Dec 2022 | 201 Lake St | one bathroom remodel in kind. non structuralDetails
one bathroom remodel in kind. non structural | $40,000 |
| Aug 10, 2022 | Completed final sign-off Apr 2025 | 148 Cervantes Bl | expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen.Details
expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen. | $150,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 128 03rd Av | remodel (e) hall bath, replace tub with shower in primary bath @ 3rd fl.Details
remodel (e) hall bath, replace tub with shower in primary bath @ 3rd fl. | $45,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2022 | 656 Douglass St | 2 bathrooms remodels replace in-kindDetails
2 bathrooms remodels replace in-kind | $60,000 |
| Jun 9, 2022 | Completed final sign-off Aug 2022 | 87 Vicksburg St | in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s). | $60,000 |
| Apr 7, 2022 | Completed final sign-off Jun 2022 | 3992 23rd St | bathroom remodel in-kindDetails
bathroom remodel in-kind | $20,000 |
| Sep 3, 2020 | Completed final sign-off Nov 2020 | 280 30th Av | garage area - add half bath, add cabinets in laundry area, new mechanical and storage closet, add drywallDetails
garage area - add half bath, add cabinets in laundry area, new mechanical and storage closet, add drywall | $15,000 |
| Mar 9, 2020 | Completed final sign-off May 2020 | 576 Eureka St | remodel existing first floor bathroom 5' x 7'Details
remodel existing first floor bathroom 5' x 7' | $10,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2020 | 148 Cervantes Bl | hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp.Details
hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp. | $90,000 |