Santos Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 12 permits filed
36 permits since 2000: 29 completed, 3 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 342 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2022 | Completed final sign-off Apr 2025 | 148 Cervantes Bl | expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen.Details
expand 2nd fl rear deck to rear and south side. add to side-yard 2-story stair addition with tiled roof deck. close-in underside of 2nd fl deck to convert patio into enclosed rec room. remodel bathroom. relocate electric meter. upgrade doors and windows. add to 2nd floor deck an outdoor kitchen. | $150,000 |
| Jan 7, 2020 | Completed final sign-off Jan 2021 | 148 Cervantes Bl | add rear deck no higher than 10 ftDetails
add rear deck no higher than 10 ft | $40,000 |