San Francisco Developers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Aug 2026
- Last 24 months
- 22 permits filed
74 permits since 2000: 38 completed, 19 in progress, 11 never finaled, 6 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 14 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2013 | Completed final sign-off Aug 2013 | 4263 22nd St | revision to pa# 2012-1010-1702-reduce top floor at rear, reduce roof deck at rear of 3rd floor. infill of lightwell at west side of 2nd floor. modification to framing plan to repair rotted structural membranes. reduce size of 2 windows on 2nd floorDetails
revision to pa# 2012-1010-1702-reduce top floor at rear, reduce roof deck at rear of 3rd floor. infill of lightwell at west side of 2nd floor. modification to framing plan to repair rotted structural membranes. reduce size of 2 windows on 2nd floor | $10,000 |
| Jan 15, 2013 | Completed final sign-off Sep 2013 | 56 Danvers St | proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building.Details
proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building. | $160,000 |