Back to bathroom remodel contractors
San Francisco Developers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Aug 2026
- Last 24 months
- 22 permits filed
74 permits since 2000: 38 completed, 19 in progress, 11 never finaled, 6 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 12 completed, 10 in progress, 4 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 631 Folsom St | unit ph-f: interior floor and kitchen finishes remodeling. primary bathroom plubming and surface finish remodel in-kind. lower level hallway closet modification for new walk-in closet for adjacent bedroom.Details
unit ph-f: interior floor and kitchen finishes remodeling. primary bathroom plubming and surface finish remodel in-kind. lower level hallway closet modification for new walk-in closet for adjacent bedroom. | $50,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 919 Fell St | main and top floor interior remodel - relocation of (e) powder room at main floor. addition of new bathroom at top floor. new partition at top floor for new bedroom.Details
main and top floor interior remodel - relocation of (e) powder room at main floor. addition of new bathroom at top floor. new partition at top floor for new bedroom. | $50,000 |
| Apr 20, 2026 | In progress issued Apr 2026 | 919 Fell St | complete kitchen and powder room remodel on ground flr. main and full bathroom remodel on 2nd flr. replacement of 17 windows street facing front and back of home u-factor 0.40 max, update electrical and plumbing as necessary. replace 1 furnace like for like in garage (high efficient).Details
complete kitchen and powder room remodel on ground flr. main and full bathroom remodel on 2nd flr. replacement of 17 windows street facing front and back of home u-factor 0.40 max, update electrical and plumbing as necessary. replace 1 furnace like for like in garage (high efficient). | $50,000 |
| Mar 18, 2026 | In progress issued Apr 2026 | 3740 Sacramento St | complete remodel of kitchen, powder room on 2nd floor, and full bathroom on 3rd floor. replacement of front and rear windows. upgrade of all trades: electrical, plumbing, and mechanical. no wall removal, in-kind remodel.Details
complete remodel of kitchen, powder room on 2nd floor, and full bathroom on 3rd floor. replacement of front and rear windows. upgrade of all trades: electrical, plumbing, and mechanical. no wall removal, in-kind remodel. | $25,000 |
| Dec 29, 2025 | In progress issued Jan 2026 | 3740 Sacramento St | revision to pa 202509256138: conversion of ground level to habitable space to add one bedroom, one bathroom, one family room and laundry room. widen the garage doorDetails
revision to pa 202509256138: conversion of ground level to habitable space to add one bedroom, one bathroom, one family room and laundry room. widen the garage door | $100,000 |
| Dec 15, 2025 | In progress issued Dec 2025 | 2821 Steiner St | 282floor plan modification at ground level to add 1 bedroom/gym, 1 bath, secondary laundry, and new elevator shaft.Details
282floor plan modification at ground level to add 1 bedroom/gym, 1 bath, secondary laundry, and new elevator shaft. | $35,000 |
| Sep 25, 2025 | In progress issued Sep 2025 | 2821 Steiner St | remodeling of existing 3 bathroom in kind in level 2, kitchen in level 3, and powder rooms in level 1 and 3. replacement of all rear windows and exterior doors. for all new clad aluminum units, not facing the street.Details
remodeling of existing 3 bathroom in kind in level 2, kitchen in level 3, and powder rooms in level 1 and 3. replacement of all rear windows and exterior doors. for all new clad aluminum units, not facing the street. | $150,000 |
| Sep 19, 2025 | Expired or cancelled withdrawn Sep 2025 | 3740 Sacramento St | volunteer foundation replacement, main fl kitchen remodel. convert ground fl to habitable space to add bedroom, bathroom, family rm, & laundry. add powder rm main fl.Details
volunteer foundation replacement, main fl kitchen remodel. convert ground fl to habitable space to add bedroom, bathroom, family rm, & laundry. add powder rm main fl. | $250,000 |
| Jul 25, 2025 | Completed final sign-off Dec 2025 | 3983 19th St | 1 kitchen and 2 upper floor bathrooms remodel in kind. upgrade plumbing and electrical.Details
1 kitchen and 2 upper floor bathrooms remodel in kind. upgrade plumbing and electrical. | $75,000 |
| Jun 17, 2025 | Completed final sign-off Oct 2025 | 141 Lower Tr | (2) bathroom and (1) kitchen remodel in kind. drywall repair and repaint. no wall demolition or construction, no change in plumbing fixture count.Details
(2) bathroom and (1) kitchen remodel in kind. drywall repair and repaint. no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Jun 21, 2024 | In progress issued Jul 2024 | 47 Worth St | ground floor remodeling: to add 2 bedrooms, 2 baths and laundry room; no work on main floor; ref pa# 202403046978Details
ground floor remodeling: to add 2 bedrooms, 2 baths and laundry room; no work on main floor; ref pa# 202403046978 | $100,000 |
| Mar 4, 2024 | In progress issued Mar 2024 | 47 Worth St | remodeling of (e) kitchen and hallway bath located on upper level in kind. (kitchen remodel 140sf and bathroom 45sf). repair rear staircase in kind appx 40%Details
remodeling of (e) kitchen and hallway bath located on upper level in kind. (kitchen remodel 140sf and bathroom 45sf). repair rear staircase in kind appx 40% | $15,000 |
| Dec 19, 2022 | In progress issued Aug 2026 | 14 Portola Dr | proposed horizontal addition to (e) single family house: add 1 office & 1 bath on 2/f. convert one bed to master, convert 1 bed to study,add 1 master bath, add juliet balcony at rear all on 3/f. add 2 skylights. proposed moment frame,n footing & slab at front.new rear retaining wall.Details
proposed horizontal addition to (e) single family house: add 1 office & 1 bath on 2/f. convert one bed to master, convert 1 bed to study,add 1 master bath, add juliet balcony at rear all on 3/f. add 2 skylights. proposed moment frame,n footing & slab at front.new rear retaining wall. | $600,000 |
| Mar 7, 2019 | Completed final sign-off Oct 2019 | 787 31st Av | convert (e) 1/f garage, storage & workshop to game room, bedroom & bath/ remove posts in garage, new beam/ remove walls between (e) dining room, kitchen & family room on 2/f; new bath on 3/f.Details
convert (e) 1/f garage, storage & workshop to game room, bedroom & bath/ remove posts in garage, new beam/ remove walls between (e) dining room, kitchen & family room on 2/f; new bath on 3/f. | $75,000 |
| Jan 22, 2019 | Completed final sign-off Sep 2019 | 787 31st Av | remodel kitchen 18'x12' & 3 baths. (n) plumbing & electrical throughout. replace (e) furnace w/ new, drywall as neededDetails
remodel kitchen 18'x12' & 3 baths. (n) plumbing & electrical throughout. replace (e) furnace w/ new, drywall as needed | $75,000 |
| Jun 7, 2018 | Completed final sign-off Oct 2018 | 36 Brunswick St | proposed foundation replacement & interior remodel remodel of a 3 story single family home. 1st floor - (n) trash room; 2nd floor - change in layout; 3rd fl - (n) bathroomDetails
proposed foundation replacement & interior remodel remodel of a 3 story single family home. 1st floor - (n) trash room; 2nd floor - change in layout; 3rd fl - (n) bathroom | $50,000 |
| Dec 2, 2015 | Never finaled issued Mar 2016, no final | 75 Mars St | revision to 2013-1018-9655 - int. floor plan modifications @ basment- change size of stairs. 1st fl - convert gym to bedrm, guest bedrm to office & full bath to 1/2 bath; 2nd fl - add wetbar, convert office to bedrm, relocate launry rm and bath rm; 3rd floor - convert office to bedroom & add bath rmDetails
revision to 2013-1018-9655 - int. floor plan modifications @ basment- change size of stairs. 1st fl - convert gym to bedrm, guest bedrm to office & full bath to 1/2 bath; 2nd fl - add wetbar, convert office to bedrm, relocate launry rm and bath rm; 3rd floor - convert office to bedroom & add bath rm | $55,000 |
| Nov 3, 2015 | Completed final sign-off Oct 2021 | 2853 Folsom St | proposed conversion of (e) storage @ 1st fllor & (e) attic area to conditioned living space to accommodate one additional unit (unit# 3) adding 3 bedrooms & 3 bath. proposed floor plans modifications. all work to be performed within (e) boundary of the building.Details
proposed conversion of (e) storage @ 1st fllor & (e) attic area to conditioned living space to accommodate one additional unit (unit# 3) adding 3 bedrooms & 3 bath. proposed floor plans modifications. all work to be performed within (e) boundary of the building. | $400,000 |
| Mar 16, 2015 | Never finaled issued Mar 2015, no final | 75 Mars St | revision to pa # 2010-0615-4512 & #2013-1018-9655. elimination of elevator at the 4th floor, new interior floor plan and structural changes and foundation. add 1/2 bath, and 1 full bath at the 3rd flDetails
revision to pa # 2010-0615-4512 & #2013-1018-9655. elimination of elevator at the 4th floor, new interior floor plan and structural changes and foundation. add 1/2 bath, and 1 full bath at the 3rd fl | $1,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 221 Craut St | bathroom & kitchen remodeling. drywall replacement as needed in kind. no structural alterations and work within existing location.Details
bathroom & kitchen remodeling. drywall replacement as needed in kind. no structural alterations and work within existing location. | $15,000 |
| Mar 13, 2013 | Never finaled issued Mar 2013, no final | 3978 Cesar Chavez St | proposed interior kitchen and bath remodel within extg 2 units and conversion of extg storage into habitable area. all work to be done with extg boundry of bldg.Details
proposed interior kitchen and bath remodel within extg 2 units and conversion of extg storage into habitable area. all work to be done with extg boundry of bldg. | $20,000 |
| Jan 15, 2013 | Completed final sign-off Sep 2013 | 56 Danvers St | proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building.Details
proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building. | $160,000 |
| Jul 13, 2012 | Completed final sign-off Mar 2015 | 67 Linda St | vertical addition on new 3rd floor. interior remodel, (n) family room & (n) bathroom @ 1st fl. two (n) bedrooms & bathroom on new 3rd floor.Details
vertical addition on new 3rd floor. interior remodel, (n) family room & (n) bathroom @ 1st fl. two (n) bedrooms & bathroom on new 3rd floor. | $220,000 |
| Apr 10, 2012 | Completed final sign-off Jul 2012 | 1406 43rd Av | kitchen and (1) bathroom +1/2 bath remodeling on 2nd floor. no structural work. repair drywall as needed. electrical upgrade as needed. paint of main floor. comply with cec 150 (k) 8 and cec 150 (k) 10.Details
kitchen and (1) bathroom +1/2 bath remodeling on 2nd floor. no structural work. repair drywall as needed. electrical upgrade as needed. paint of main floor. comply with cec 150 (k) 8 and cec 150 (k) 10. | $25,000 |
| Mar 26, 2012 | Completed final sign-off Sep 2012 | 722 Guerrero St | unit#722 only:kitchen and bathroom remodeling. furnace replacement. paint of unit.Details
unit#722 only:kitchen and bathroom remodeling. furnace replacement. paint of unit. | $20,000 |
| Aug 19, 2011 | Completed final sign-off Dec 2011 | 67 Linda St | remodeling existing bathroom including electrical upgrade, interior remodeling only. existing structure to remain, replacement of furnace unit.Details
remodeling existing bathroom including electrical upgrade, interior remodeling only. existing structure to remain, replacement of furnace unit. | $8,000 |
| Jul 8, 2011 | Completed final sign-off Nov 2011 | 262 Santa Paula Av | remodelling of hallway bathroom and master bathroom on 2nd floor, kitchen countertop replacement on ground floor. no wall relocation.Details
remodelling of hallway bathroom and master bathroom on 2nd floor, kitchen countertop replacement on ground floor. no wall relocation. | $40,000 |