Back to kitchen remodel contractors
San Francisco Developers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Aug 2026
- Last 24 months
- 22 permits filed
74 permits since 2000: 38 completed, 19 in progress, 11 never finaled, 6 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 11 completed, 6 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 631 Folsom St | unit ph-f: interior floor and kitchen finishes remodeling. primary bathroom plubming and surface finish remodel in-kind. lower level hallway closet modification for new walk-in closet for adjacent bedroom.Details
unit ph-f: interior floor and kitchen finishes remodeling. primary bathroom plubming and surface finish remodel in-kind. lower level hallway closet modification for new walk-in closet for adjacent bedroom. | $50,000 |
| Apr 20, 2026 | In progress issued Apr 2026 | 919 Fell St | complete kitchen and powder room remodel on ground flr. main and full bathroom remodel on 2nd flr. replacement of 17 windows street facing front and back of home u-factor 0.40 max, update electrical and plumbing as necessary. replace 1 furnace like for like in garage (high efficient).Details
complete kitchen and powder room remodel on ground flr. main and full bathroom remodel on 2nd flr. replacement of 17 windows street facing front and back of home u-factor 0.40 max, update electrical and plumbing as necessary. replace 1 furnace like for like in garage (high efficient). | $50,000 |
| Mar 18, 2026 | In progress issued Apr 2026 | 3740 Sacramento St | complete remodel of kitchen, powder room on 2nd floor, and full bathroom on 3rd floor. replacement of front and rear windows. upgrade of all trades: electrical, plumbing, and mechanical. no wall removal, in-kind remodel.Details
complete remodel of kitchen, powder room on 2nd floor, and full bathroom on 3rd floor. replacement of front and rear windows. upgrade of all trades: electrical, plumbing, and mechanical. no wall removal, in-kind remodel. | $25,000 |
| Mar 12, 2026 | In progress issued Jul 2026 | 2821 Steiner St | attached adu within existing habitable space, conversion of existing wetbar into a full kitchen, addition of new powder room and new stairs between ground floor and first floor.Details
attached adu within existing habitable space, conversion of existing wetbar into a full kitchen, addition of new powder room and new stairs between ground floor and first floor. | $35,000 |
| Sep 25, 2025 | In progress issued Sep 2025 | 2821 Steiner St | remodeling of existing 3 bathroom in kind in level 2, kitchen in level 3, and powder rooms in level 1 and 3. replacement of all rear windows and exterior doors. for all new clad aluminum units, not facing the street.Details
remodeling of existing 3 bathroom in kind in level 2, kitchen in level 3, and powder rooms in level 1 and 3. replacement of all rear windows and exterior doors. for all new clad aluminum units, not facing the street. | $150,000 |
| Sep 19, 2025 | Expired or cancelled withdrawn Sep 2025 | 3740 Sacramento St | volunteer foundation replacement, main fl kitchen remodel. convert ground fl to habitable space to add bedroom, bathroom, family rm, & laundry. add powder rm main fl.Details
volunteer foundation replacement, main fl kitchen remodel. convert ground fl to habitable space to add bedroom, bathroom, family rm, & laundry. add powder rm main fl. | $250,000 |
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 3983 19th St | addition of (n) powder room on 2nd floor, remove portion of wall and post between hallway,kitchen and dining room, replace of facade windows at 2nd and 3rd floor. add (n) partition wall at 3rd floor to create two bedrooms, replace (e) and addition of (n) window at bedrooms at 3rd level. visibleDetails
addition of (n) powder room on 2nd floor, remove portion of wall and post between hallway,kitchen and dining room, replace of facade windows at 2nd and 3rd floor. add (n) partition wall at 3rd floor to create two bedrooms, replace (e) and addition of (n) window at bedrooms at 3rd level. visible | $50,000 |
| Jul 25, 2025 | Completed final sign-off Dec 2025 | 3983 19th St | 1 kitchen and 2 upper floor bathrooms remodel in kind. upgrade plumbing and electrical.Details
1 kitchen and 2 upper floor bathrooms remodel in kind. upgrade plumbing and electrical. | $75,000 |
| Jun 17, 2025 | Completed final sign-off Oct 2025 | 141 Lower Tr | (2) bathroom and (1) kitchen remodel in kind. drywall repair and repaint. no wall demolition or construction, no change in plumbing fixture count.Details
(2) bathroom and (1) kitchen remodel in kind. drywall repair and repaint. no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Dec 4, 2024 | Completed final sign-off Mar 2025 | 148 Saturn St | ground fl unit. replacement of rear kitchen countertop . reinstall cooktop/oven & fridge. 10 sq ft drywall repair/repair kitchenDetails
ground fl unit. replacement of rear kitchen countertop . reinstall cooktop/oven & fridge. 10 sq ft drywall repair/repair kitchen | $10,000 |
| Mar 4, 2024 | In progress issued Mar 2024 | 47 Worth St | remodeling of (e) kitchen and hallway bath located on upper level in kind. (kitchen remodel 140sf and bathroom 45sf). repair rear staircase in kind appx 40%Details
remodeling of (e) kitchen and hallway bath located on upper level in kind. (kitchen remodel 140sf and bathroom 45sf). repair rear staircase in kind appx 40% | $15,000 |
| Mar 7, 2019 | Completed final sign-off Oct 2019 | 787 31st Av | convert (e) 1/f garage, storage & workshop to game room, bedroom & bath/ remove posts in garage, new beam/ remove walls between (e) dining room, kitchen & family room on 2/f; new bath on 3/f.Details
convert (e) 1/f garage, storage & workshop to game room, bedroom & bath/ remove posts in garage, new beam/ remove walls between (e) dining room, kitchen & family room on 2/f; new bath on 3/f. | $75,000 |
| Jan 22, 2019 | Completed final sign-off Sep 2019 | 787 31st Av | remodel kitchen 18'x12' & 3 baths. (n) plumbing & electrical throughout. replace (e) furnace w/ new, drywall as neededDetails
remodel kitchen 18'x12' & 3 baths. (n) plumbing & electrical throughout. replace (e) furnace w/ new, drywall as needed | $75,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 221 Craut St | bathroom & kitchen remodeling. drywall replacement as needed in kind. no structural alterations and work within existing location.Details
bathroom & kitchen remodeling. drywall replacement as needed in kind. no structural alterations and work within existing location. | $15,000 |
| Mar 13, 2013 | Never finaled issued Mar 2013, no final | 3978 Cesar Chavez St | proposed interior kitchen and bath remodel within extg 2 units and conversion of extg storage into habitable area. all work to be done with extg boundry of bldg.Details
proposed interior kitchen and bath remodel within extg 2 units and conversion of extg storage into habitable area. all work to be done with extg boundry of bldg. | $20,000 |
| Jan 15, 2013 | Completed final sign-off Sep 2013 | 56 Danvers St | proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building.Details
proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building. | $160,000 |
| Oct 24, 2012 | Never finaled issued Oct 2012, no final | 3978 Cesar Chavez St | remodeling of kitchen (2) on 1 2nd flr & one on 3rd flr, remodeling of bathrms (4) 0n 2nd and 3rd flrs, (2 on 2nd & 2 on 3rd); repl drywall in kind as needed;repl interior doors & moldings to comply with nov 200010757; repl 1 window in kind on prop lineDetails
remodeling of kitchen (2) on 1 2nd flr & one on 3rd flr, remodeling of bathrms (4) 0n 2nd and 3rd flrs, (2 on 2nd & 2 on 3rd); repl drywall in kind as needed;repl interior doors & moldings to comply with nov 200010757; repl 1 window in kind on prop line | $125,000 |
| Apr 10, 2012 | Completed final sign-off Jul 2012 | 1406 43rd Av | kitchen and (1) bathroom +1/2 bath remodeling on 2nd floor. no structural work. repair drywall as needed. electrical upgrade as needed. paint of main floor. comply with cec 150 (k) 8 and cec 150 (k) 10.Details
kitchen and (1) bathroom +1/2 bath remodeling on 2nd floor. no structural work. repair drywall as needed. electrical upgrade as needed. paint of main floor. comply with cec 150 (k) 8 and cec 150 (k) 10. | $25,000 |
| Mar 26, 2012 | Completed final sign-off Sep 2012 | 722 Guerrero St | unit#722 only:kitchen and bathroom remodeling. furnace replacement. paint of unit.Details
unit#722 only:kitchen and bathroom remodeling. furnace replacement. paint of unit. | $20,000 |
| Aug 2, 2011 | Completed final sign-off Dec 2011 | 67 Linda St | remodeling of kitchen, including electrical upgrade. interior remodeling only, existing structure to remain.Details
remodeling of kitchen, including electrical upgrade. interior remodeling only, existing structure to remain. | $25,000 |
| Jul 8, 2011 | Completed final sign-off Nov 2011 | 262 Santa Paula Av | remodelling of hallway bathroom and master bathroom on 2nd floor, kitchen countertop replacement on ground floor. no wall relocation.Details
remodelling of hallway bathroom and master bathroom on 2nd floor, kitchen countertop replacement on ground floor. no wall relocation. | $40,000 |