Safeway Plumbing & Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2023
- Last 24 months
- 0 permits filed
56 permits since 2000: 24 completed, 4 never finaled, 28 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 265 days from filing to permit and 592 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2023 | Completed final sign-off Sep 2025 | 378 Monticello St | 1st floor - 1) convert 1st floor habitable space into a.d.u 2nd floor - 2) remove stair connected first floor. 2nd floor - 3) enlarge kitchenDetails
1st floor - 1) convert 1st floor habitable space into a.d.u 2nd floor - 2) remove stair connected first floor. 2nd floor - 3) enlarge kitchen | $30,000 |
| Sep 8, 2020 | Completed final sign-off Aug 2025 | 378 Monticello St | 1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldgDetails
1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldg | $50,000 |
| Jul 23, 2009 | Completed final sign-off Aug 2009 | 444 Corbett Av | remove (e) steps of stairs lead from 1st fl. to roof. less than 50% of total stairs. remove (e) walkway on roof. replace them with pressure treated 2x material. stairs are not visible from street.Details
remove (e) steps of stairs lead from 1st fl. to roof. less than 50% of total stairs. remove (e) walkway on roof. replace them with pressure treated 2x material. stairs are not visible from street. | $3,900 |