Back to kitchen remodel contractors
Safeway Plumbing & Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2023
- Last 24 months
- 0 permits filed
56 permits since 2000: 24 completed, 4 never finaled, 28 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 265 days from filing to permit and 880 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2023 | Completed final sign-off Sep 2025 | 378 Monticello St | 1st floor - 1) convert 1st floor habitable space into a.d.u 2nd floor - 2) remove stair connected first floor. 2nd floor - 3) enlarge kitchenDetails
1st floor - 1) convert 1st floor habitable space into a.d.u 2nd floor - 2) remove stair connected first floor. 2nd floor - 3) enlarge kitchen | $30,000 |
| Sep 8, 2020 | Completed final sign-off Aug 2025 | 378 Monticello St | 1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldgDetails
1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldg | $50,000 |
| Feb 8, 2010 | Never finaled issued Feb 2010, no final | 1700 Post St | remove & haulaway all chairs, booths, storage shelvings, counter and kitchen equiptment. except kitchen hood, 2-sinks & 2-prep tables.Details
remove & haulaway all chairs, booths, storage shelvings, counter and kitchen equiptment. except kitchen hood, 2-sinks & 2-prep tables. | $7,000 |