Back to bathroom remodel contractors
Safeway Plumbing & Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2023
- Last 24 months
- 0 permits filed
56 permits since 2000: 24 completed, 4 never finaled, 28 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2020 | Completed final sign-off Aug 2025 | 378 Monticello St | 1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldgDetails
1st fl: 1) infill space under 2nd fl @ south side of property 2) add two bedrms, two 3-fix baths, entertainment rm 2nd fl: 3) reconfigure interior layout w/ two bedrm, two bath, kitchen, living & dining area 4) demolish (e) deck @ rear of bldg 5) construct (n) deck & stair from 2nd fl @ rear of bldg | $50,000 |
| Oct 1, 2007 | Completed final sign-off Feb 2008 | 720 Gough St | bathroom remodel: remove (e) tub & tile. install a new shower pan with bench and a new shower valve new surrounding tiles and install new tile on floor with new vanity and new toilet.Details
bathroom remodel: remove (e) tub & tile. install a new shower pan with bench and a new shower valve new surrounding tiles and install new tile on floor with new vanity and new toilet. | $7,500 |
| Jul 30, 2007 | Completed final sign-off Dec 2007 | 1423 27th Av | remodel master bathroom. reconfigure fixtures but no structural work.Details
remodel master bathroom. reconfigure fixtures but no structural work. | $6,500 |
| Jul 19, 2006 | Completed final sign-off Dec 2006 | 1423 27th Av | bathroom remodel-remove (e) bathtub, install shower with tile fllor & wall, install new tile floor & wall. shower min 30in in any direction, min 1024#.Details
bathroom remodel-remove (e) bathtub, install shower with tile fllor & wall, install new tile floor & wall. shower min 30in in any direction, min 1024#. | $5,900 |
| Mar 27, 2006 | Completed final sign-off Apr 2006 | 2127 35th Av | remodel existing bathroom. no structural. replace shower stall, toilet, vanity. no change to partitions or windows.Details
remodel existing bathroom. no structural. replace shower stall, toilet, vanity. no change to partitions or windows. | $5,500 |