S Mc Cann Construction Inc
- Based in
- Novato
- On San Francisco permits
- Nov 2012 to May 2022
- Last 24 months
- 0 permits filed
56 permits since 2000: 43 completed, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 18 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2021 | Never finaled issued Aug 2021, no final | 3733 17th St | remove and replace dry rotted decks, stair, fence and rear wall in-kind.Details
remove and replace dry rotted decks, stair, fence and rear wall in-kind. | $8,000 |
| Jun 5, 2018 | Completed final sign-off Jul 2018 | 906 Steiner St | repair rot damage on rear staircase. less thant 50%. repair/replace rotted structural members and non structural pieces in kind. also comply with nov 201839441.Details
repair rot damage on rear staircase. less thant 50%. repair/replace rotted structural members and non structural pieces in kind. also comply with nov 201839441. | $10,000 |
| May 29, 2018 | Completed final sign-off Dec 2018 | 806 Noe St | facade and exterior stairs remodelDetails
facade and exterior stairs remodel | $7,500 |
| Nov 10, 2014 | Completed final sign-off Jul 2015 | 3552 19th St | revision to pa #201411030475 to replace roof deck in-kind and repair dry rotted stair less than 50% in-kind. structural post and foots. new electrical. ad hose bibbDetails
revision to pa #201411030475 to replace roof deck in-kind and repair dry rotted stair less than 50% in-kind. structural post and foots. new electrical. ad hose bibb | $1,000 |