Back to bathroom remodel contractors
S Mc Cann Construction Inc
- Based in
- Novato
- On San Francisco permits
- Nov 2012 to May 2022
- Last 24 months
- 0 permits filed
56 permits since 2000: 43 completed, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 12 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2022 | Expired or cancelled withdrawn Mar 2025 | 226 Rutledge St | replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundryDetails
replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundry | $300,000 |
| Oct 12, 2021 | Completed final sign-off Jun 2022 | 71 Beaver St | bath remodel, replace door from laundry intogarage with fire rated self closing door.Details
bath remodel, replace door from laundry intogarage with fire rated self closing door. | $15,000 |
| Jul 2, 2021 | Expired or cancelled expired Sep 2024 | 75 Roosevelt Wy | remodel of kitchen + 2 bathrooms, new cabinets, countertops,tile, vanity,new plumbing + electric by other sub contractors. no new framing on removal of walls.Details
remodel of kitchen + 2 bathrooms, new cabinets, countertops,tile, vanity,new plumbing + electric by other sub contractors. no new framing on removal of walls. | $50,000 |
| Sep 10, 2020 | Completed final sign-off Mar 2021 | 2423 Green St | bathroom remodel, new dry wall, tile, fixtures, vanities, plumbing & electrical by othersDetails
bathroom remodel, new dry wall, tile, fixtures, vanities, plumbing & electrical by others | $25,000 |
| Jul 6, 2018 | Completed final sign-off Jan 2019 | 50 Chaves Av | kitchen & bathroom remodel, new cabs, tile, countertops, plumbing/electrical fixtures, no framing on new walls. (e) layout remains unchanged.Details
kitchen & bathroom remodel, new cabs, tile, countertops, plumbing/electrical fixtures, no framing on new walls. (e) layout remains unchanged. | $40,000 |
| Dec 21, 2017 | Completed final sign-off Nov 2024 | 38 Elsie St | remodel existing kitchen and bath, remodel roof over kitchen-shed to gable, replace door and window in kitchen. **upper unit**Details
remodel existing kitchen and bath, remodel roof over kitchen-shed to gable, replace door and window in kitchen. **upper unit** | $40,000 |
| Aug 7, 2017 | Completed final sign-off Feb 2018 | 900 Minnesota St | #117 - kitchen remdoel: new cabients, countertops, brick splash & bathroom remodel: new tile, vanity. no structural work.Details
#117 - kitchen remdoel: new cabients, countertops, brick splash & bathroom remodel: new tile, vanity. no structural work. | $40,000 |
| Apr 10, 2017 | Completed final sign-off Aug 2018 | 4037 25th St | unit 4037 - interior renovations (n) bath, relocate (e) washer/dryer & closet, remove ceiling drywall throughout unit, insulate & replace drywall. unit 4039 - (n) bath, relocate (e) closetDetails
unit 4037 - interior renovations (n) bath, relocate (e) washer/dryer & closet, remove ceiling drywall throughout unit, insulate & replace drywall. unit 4039 - (n) bath, relocate (e) closet | $20,000 |
| Mar 27, 2017 | Completed final sign-off May 2018 | 1326 Haight St | new kitchen cabinets & fixtures, kitchen remodel replace broken window/ glazing at rear (approx 20 windows) new bathrooms remodel ,refinish flooring, max u factor for windows 0.32Details
new kitchen cabinets & fixtures, kitchen remodel replace broken window/ glazing at rear (approx 20 windows) new bathrooms remodel ,refinish flooring, max u factor for windows 0.32 | $10,000 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 691 02nd Av | replace 20 windows in-kind, same size and location. windows at front elevation will be wood. windows at rear will be vinyl clad wood. remodel 2nd floor bathroom, remodel kitchen with new countertops, cabinets and fizxtures. remodel lower level bathroom.Details
replace 20 windows in-kind, same size and location. windows at front elevation will be wood. windows at rear will be vinyl clad wood. remodel 2nd floor bathroom, remodel kitchen with new countertops, cabinets and fizxtures. remodel lower level bathroom. | $42,000 |
| Nov 6, 2015 | Never finaled issued Jun 2016, no final | 2591 26th Av | coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ gradeDetails
coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ grade | $155,000 |
| Jun 19, 2015 | Completed final sign-off Feb 2016 | 2 05th Av | remodel 3 baths, reconfigure interior non bearing partition walls per proposed plan, existing openings to remain unchanged maher not reqDetails
remodel 3 baths, reconfigure interior non bearing partition walls per proposed plan, existing openings to remain unchanged maher not req | $150,000 |
| Sep 29, 2014 | Completed final sign-off Dec 2014 | 42 Collins St | replace toilet, vanity, tile, shower fixts, drywall, bathroom remodel. no structural work.Details
replace toilet, vanity, tile, shower fixts, drywall, bathroom remodel. no structural work. | $16,000 |
| Aug 21, 2014 | Never finaled issued Aug 2015, no final | 2423 Green St | horizontal rear yard addition on one level: new one bedroom. remodel one bathroom. maher ord not applicable.Details
horizontal rear yard addition on one level: new one bedroom. remodel one bathroom. maher ord not applicable. | $71,500 |
| Feb 14, 2014 | Completed final sign-off May 2014 | 129 Elsie St | remodel 2 bathrooms, no structural work, new tile, showers/bth, vanity, toilets, new lighting.Details
remodel 2 bathrooms, no structural work, new tile, showers/bth, vanity, toilets, new lighting. | $29,000 |
| Jun 5, 2013 | Completed final sign-off Dec 2013 | 1235 05th Av | remodel of existing bathroom, infill existing lightwell.Details
remodel of existing bathroom, infill existing lightwell. | $15,000 |