Back to kitchen remodel contractors
S & I Construction, Inc
- Based in
- Alameda
- On San Francisco permits
- Apr 2014 to Aug 2022
- Last 24 months
- 0 permits filed
62 permits since 2000: 55 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 15 completed, 1 never finaled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2022 | Completed final sign-off Feb 2023 | 930 Pine St | kitchen and bathroom remodeling: like for like: no relocation involved. replace cabinets, relsce countertop, replace appliances replace tile on floor in kitchen area updated. replace toilet, replace vanity. replace shower pan replace fan updated dedicated circuits per code. no walls or layout changeDetails
kitchen and bathroom remodeling: like for like: no relocation involved. replace cabinets, relsce countertop, replace appliances replace tile on floor in kitchen area updated. replace toilet, replace vanity. replace shower pan replace fan updated dedicated circuits per code. no walls or layout change | $50,000 |
| Apr 15, 2021 | Completed final sign-off Sep 2021 | 3795 20th St | kitchen remodel in-kind. replace apliances. upgrade m/e/p. replace plumbing fixtures in kind. no layout/wall change.Details
kitchen remodel in-kind. replace apliances. upgrade m/e/p. replace plumbing fixtures in kind. no layout/wall change. | $22,000 |
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 537 Grand View Av | remodel kitchen. new cabints, backsplashs, countertop, faucet. add kitchen island with no plumbing.Details
remodel kitchen. new cabints, backsplashs, countertop, faucet. add kitchen island with no plumbing. | $10,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2023 | 17 Hoff St | per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201Details
per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201 | $150,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2022 | 645 Cole St | unit 645: remodel existing kitchen & bathroom. add 1 full bathroom. add new furnace, washer & dryer.Details
unit 645: remodel existing kitchen & bathroom. add 1 full bathroom. add new furnace, washer & dryer. | $90,000 |
| Jul 14, 2020 | Completed final sign-off Jul 2021 | 3724 Divisadero St | full seismic strengthening throughout. interior reconfiguration, relocate kitchen, add bath, lightwell infill at ground floor against blank wall of adjacent building.Details
full seismic strengthening throughout. interior reconfiguration, relocate kitchen, add bath, lightwell infill at ground floor against blank wall of adjacent building. | $174,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 1050 North Point St | kitchen & bath remodel inkindDetails
kitchen & bath remodel inkind | |
| Dec 5, 2019 | Completed final sign-off Jun 2020 | 401 26th Av | #6: remodel kitchen by plan. electrical add 14 recess light and install pipeline for washer.Details
#6: remodel kitchen by plan. electrical add 14 recess light and install pipeline for washer. | $65,000 |
| Sep 10, 2019 | Completed final sign-off Jan 2020 | 455 Vallejo St | kitchen remodel - like for like, change cabinets, countertop, backsplash appliances. replace existing recessed lights with led can lights.Details
kitchen remodel - like for like, change cabinets, countertop, backsplash appliances. replace existing recessed lights with led can lights. | $25,000 |
| Mar 18, 2019 | Completed final sign-off Jul 2020 | 228 Cotter St | replace kitchen cabinets, replace windows (same size) alum clad front, reframe o add sliding door, update electrica to current code, reframe to add skylights, upgrade/refigure fixtures.Details
replace kitchen cabinets, replace windows (same size) alum clad front, reframe o add sliding door, update electrica to current code, reframe to add skylights, upgrade/refigure fixtures. | $40,000 |
| Apr 25, 2018 | Completed final sign-off Jun 2018 | 1259 45th Av | kitchen remodel at 2nd floor: demo kitchen area, install new appliances, new sink, faucet, new counter top, new tiles on floor. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3.Details
kitchen remodel at 2nd floor: demo kitchen area, install new appliances, new sink, faucet, new counter top, new tiles on floor. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3. | $20,000 |
| Oct 2, 2017 | Completed final sign-off Dec 2017 | 601 Van Ness Av | kitchen remodeling - install new cabinet, new counter top, new appliances (fridge, oven, dw) install new back splash, apply new gfi every 2 ft. replace tile on floor. install 3 recess lights (led). all plumbing existing - in kind. n/a maherDetails
kitchen remodeling - install new cabinet, new counter top, new appliances (fridge, oven, dw) install new back splash, apply new gfi every 2 ft. replace tile on floor. install 3 recess lights (led). all plumbing existing - in kind. n/a maher | $22,500 |
| Sep 13, 2017 | Completed final sign-off Mar 2018 | 117 Scott St | 3rd floor: relocate interior bearing wall, add (n) bathroom, convert sitting room to (n) bedroom, convert sunroom to laundry, remodel kitchen.Details
3rd floor: relocate interior bearing wall, add (n) bathroom, convert sitting room to (n) bedroom, convert sunroom to laundry, remodel kitchen. | $34,000 |
| Aug 9, 2017 | Completed final sign-off Oct 2017 | 2650 Ortega St | kitchen remodel, replace, cabinet, floor (install floor tile), countertop, backsplash, recessed lights, new sink, garbage disposal; bathroom remodel, replace tile on floor/wall, shower pan, fan, cabinet, toilet, install vanity, recessed lights.Details
kitchen remodel, replace, cabinet, floor (install floor tile), countertop, backsplash, recessed lights, new sink, garbage disposal; bathroom remodel, replace tile on floor/wall, shower pan, fan, cabinet, toilet, install vanity, recessed lights. | $65,000 |
| Jun 12, 2017 | Completed final sign-off Oct 2017 | 537 Moultrie St | kitchen remodel: change cabients, sink, countertop, appliance, back splash, new gfci, 4 recess lights. bathroom remodel; change tub to shower, valve, install new tile, change toilet, vanity, add fan, install 2 new lights. change bathroom window. add 6 recess lights in living room.Details
kitchen remodel: change cabients, sink, countertop, appliance, back splash, new gfci, 4 recess lights. bathroom remodel; change tub to shower, valve, install new tile, change toilet, vanity, add fan, install 2 new lights. change bathroom window. add 6 recess lights in living room. | $40,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2019 | 715 22nd Av | second story remodel of kitchen, dining, living room, and bathroom.Details
second story remodel of kitchen, dining, living room, and bathroom. | $50,000 |