S & I Construction, Inc
- Based in
- Alameda
- On San Francisco permits
- Apr 2014 to Aug 2022
- Last 24 months
- 0 permits filed
62 permits since 2000: 55 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 29 completed, 3 never finaled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2022 | Completed final sign-off Feb 2023 | 930 Pine St | kitchen and bathroom remodeling: like for like: no relocation involved. replace cabinets, relsce countertop, replace appliances replace tile on floor in kitchen area updated. replace toilet, replace vanity. replace shower pan replace fan updated dedicated circuits per code. no walls or layout changeDetails
kitchen and bathroom remodeling: like for like: no relocation involved. replace cabinets, relsce countertop, replace appliances replace tile on floor in kitchen area updated. replace toilet, replace vanity. replace shower pan replace fan updated dedicated circuits per code. no walls or layout change | $50,000 |
| Aug 22, 2022 | Completed final sign-off Oct 2022 | 80 Richland Av | shower pan replacement like for like: noo relocation involved: repace rescessed lights in bath area. replace shower valve. no walls or layout changes.Details
shower pan replacement like for like: noo relocation involved: repace rescessed lights in bath area. replace shower valve. no walls or layout changes. | $15,000 |
| Dec 14, 2021 | Completed final sign-off Dec 2022 | 223 Upper Tr | interior: new flooors, add closet, new kichen casework and appliances, new remodel 2 bathrooms with like fixtures in simiir locations, replace doors and lighting.Details
interior: new flooors, add closet, new kichen casework and appliances, new remodel 2 bathrooms with like fixtures in simiir locations, replace doors and lighting. | $60,000 |
| Aug 11, 2021 | Completed final sign-off Nov 2021 | 650 Steiner St | unit 4: bathroom remodeling like for like, replace tub with shower, 2 recessed lights, replace fan, 2bfi. replace all plumbing fixtures. update mep up to code.Details
unit 4: bathroom remodeling like for like, replace tub with shower, 2 recessed lights, replace fan, 2bfi. replace all plumbing fixtures. update mep up to code. | $18,000 |
| Jul 9, 2021 | Completed final sign-off Dec 2022 | 2123 28th Av | convert 1/2 bath to full bath 2nd fl. new shower pan and shower head. toilet, vanity, recessed lights,fan.new walls with 2x4 sht 16" on centerDetails
convert 1/2 bath to full bath 2nd fl. new shower pan and shower head. toilet, vanity, recessed lights,fan.new walls with 2x4 sht 16" on center | $30,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2023 | 17 Hoff St | per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201Details
per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201 | $150,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 1595 Treat Av | bathroom remodeling, not completed like for like, replace tile in shower, take the floor heating off and install back, shower pan, vanity and sink as is.Details
bathroom remodeling, not completed like for like, replace tile in shower, take the floor heating off and install back, shower pan, vanity and sink as is. | $9,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2022 | 645 Cole St | unit 645: remodel existing kitchen & bathroom. add 1 full bathroom. add new furnace, washer & dryer.Details
unit 645: remodel existing kitchen & bathroom. add 1 full bathroom. add new furnace, washer & dryer. | $90,000 |
| Jul 14, 2020 | Completed final sign-off Jul 2021 | 3724 Divisadero St | full seismic strengthening throughout. interior reconfiguration, relocate kitchen, add bath, lightwell infill at ground floor against blank wall of adjacent building.Details
full seismic strengthening throughout. interior reconfiguration, relocate kitchen, add bath, lightwell infill at ground floor against blank wall of adjacent building. | $174,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 1050 North Point St | kitchen & bath remodel inkindDetails
kitchen & bath remodel inkind | |
| Jan 13, 2020 | Completed final sign-off Oct 2021 | 401 26th Av | unit #6: remodel 2 bathrooms like for like - master bathroom , main bathroom; no removal of walls.Details
unit #6: remodel 2 bathrooms like for like - master bathroom , main bathroom; no removal of walls. | $20,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2020 | 455 Vallejo St | door 212: bathroom remodel. like for like. change recessed lights, run a dedicated 20 amp electrical line to bathroom. no change on walls.Details
door 212: bathroom remodel. like for like. change recessed lights, run a dedicated 20 amp electrical line to bathroom. no change on walls. | $15,000 |
| May 1, 2019 | Completed final sign-off Dec 2019 | 2130 Harrison St | remodel 1st fl bathroom. remodel and increase size of mezzanine bathroom.Details
remodel 1st fl bathroom. remodel and increase size of mezzanine bathroom. | $35,000 |
| Mar 26, 2019 | Completed final sign-off Aug 2019 | 1111 Bay St | complete remodel for master bathroom and hall bathroom, electrical upgrade to code. master bathroom to remain same size 58 sqft hall bathroom to remain same size 45 sqftDetails
complete remodel for master bathroom and hall bathroom, electrical upgrade to code. master bathroom to remain same size 58 sqft hall bathroom to remain same size 45 sqft | $35,300 |
| Jan 30, 2019 | Completed final sign-off Apr 2019 | 930 Pine St | bathroom remodel like-for-like. upgrade electrical to code. no change of existing floor plan.Details
bathroom remodel like-for-like. upgrade electrical to code. no change of existing floor plan. | $15,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2018 | 223 29th St | complete master bathroom remodeling, like for like. add bathroom fan, terminate duct from side wall to roof, 3 ft min from property line. run a new dedicated electrical to bathroom from main panel. no walls moved, removed, added or installed. all (e) layouts to remain unchanged.Details
complete master bathroom remodeling, like for like. add bathroom fan, terminate duct from side wall to roof, 3 ft min from property line. run a new dedicated electrical to bathroom from main panel. no walls moved, removed, added or installed. all (e) layouts to remain unchanged. | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jul 2018 | 125 Clipper St | bathroom remodelDetails
bathroom remodel | $15,000 |
| Oct 11, 2017 | Completed final sign-off Dec 2017 | 1792 Green St | remodel (e) bathroom, relocate fixtures (tub, toilet, vanity. convert (e) closet into a master bathroom; add shower, add toilet, add vanity. infill hallway door wall. remove master bedroom closet and non-load bearing partition wall. new recessed lighting and fan. add 10 recess lights 5 for each brDetails
remodel (e) bathroom, relocate fixtures (tub, toilet, vanity. convert (e) closet into a master bathroom; add shower, add toilet, add vanity. infill hallway door wall. remove master bedroom closet and non-load bearing partition wall. new recessed lighting and fan. add 10 recess lights 5 for each br | $74,720 |
| Sep 13, 2017 | Completed final sign-off Mar 2018 | 117 Scott St | 3rd floor: relocate interior bearing wall, add (n) bathroom, convert sitting room to (n) bedroom, convert sunroom to laundry, remodel kitchen.Details
3rd floor: relocate interior bearing wall, add (n) bathroom, convert sitting room to (n) bedroom, convert sunroom to laundry, remodel kitchen. | $34,000 |
| Aug 9, 2017 | Completed final sign-off Oct 2017 | 2650 Ortega St | kitchen remodel, replace, cabinet, floor (install floor tile), countertop, backsplash, recessed lights, new sink, garbage disposal; bathroom remodel, replace tile on floor/wall, shower pan, fan, cabinet, toilet, install vanity, recessed lights.Details
kitchen remodel, replace, cabinet, floor (install floor tile), countertop, backsplash, recessed lights, new sink, garbage disposal; bathroom remodel, replace tile on floor/wall, shower pan, fan, cabinet, toilet, install vanity, recessed lights. | $65,000 |
| Jun 12, 2017 | Completed final sign-off Oct 2017 | 537 Moultrie St | kitchen remodel: change cabients, sink, countertop, appliance, back splash, new gfci, 4 recess lights. bathroom remodel; change tub to shower, valve, install new tile, change toilet, vanity, add fan, install 2 new lights. change bathroom window. add 6 recess lights in living room.Details
kitchen remodel: change cabients, sink, countertop, appliance, back splash, new gfci, 4 recess lights. bathroom remodel; change tub to shower, valve, install new tile, change toilet, vanity, add fan, install 2 new lights. change bathroom window. add 6 recess lights in living room. | $40,000 |
| May 10, 2017 | Completed final sign-off Jun 2017 | 590 06th St | apt 305: change bathtub to shower pan in 2 bathrooms, install 2 shower heads with two different valves in each bathroom. install tile on walls surrouding shower.Details
apt 305: change bathtub to shower pan in 2 bathrooms, install 2 shower heads with two different valves in each bathroom. install tile on walls surrouding shower. | $15,000 |
| Apr 24, 2017 | Completed final sign-off Jun 2017 | 608 Haight St | unit #c: bathroom remodel. relocate the tub, vanity, and toilet. remove pony wall, replace fan, led lights.Details
unit #c: bathroom remodel. relocate the tub, vanity, and toilet. remove pony wall, replace fan, led lights. | $11,000 |
| Feb 24, 2017 | Completed final sign-off Mar 2017 | 185 Ney St | remodel (e) bathroom on 2nd story. no structural changes. no change on walls.Details
remodel (e) bathroom on 2nd story. no structural changes. no change on walls. | $14,500 |
| Feb 6, 2017 | Completed final sign-off Aug 2017 | 127 30th St | convert laundry room to full bathroom on 2nd flrDetails
convert laundry room to full bathroom on 2nd flr | $25,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 2023 22nd St | bathroom remodel, change tub to standing/walk-in shower, install recess light, install switch & tile bathroom.Details
bathroom remodel, change tub to standing/walk-in shower, install recess light, install switch & tile bathroom. | $9,000 |
| Feb 22, 2016 | Completed final sign-off May 2016 | 2435 Francisco St | bathrom remodel, change tub & shower, vanity, toilet. in half bath change only countertop/vanity.Details
bathrom remodel, change tub & shower, vanity, toilet. in half bath change only countertop/vanity. | $15,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2019 | 715 22nd Av | second story remodel of kitchen, dining, living room, and bathroom.Details
second story remodel of kitchen, dining, living room, and bathroom. | $50,000 |
| Dec 15, 2015 | Never finaled issued May 2016, no final | 498 Natoma St | refurbish (e) commerical space, upgrade entry & bathrooms for full ada compliance. no structural work, no exterior alteration.Details
refurbish (e) commerical space, upgrade entry & bathrooms for full ada compliance. no structural work, no exterior alteration. | $50,000 |
| Nov 19, 2015 | Completed final sign-off May 2016 | 920 Harrison St | unit 7: bathroom remodel-replace (e) exhaust fan in kind, change tub into shower. replace shower head, install tile in floor and walls. all new lights shall be led.Details
unit 7: bathroom remodel-replace (e) exhaust fan in kind, change tub into shower. replace shower head, install tile in floor and walls. all new lights shall be led. | $9,000 |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 496 Natoma St | interior dry wall demo, bathrooms. remain vacancy under ab-017. space shall remain vacant per sfbc ab-017.Details
interior dry wall demo, bathrooms. remain vacancy under ab-017. space shall remain vacant per sfbc ab-017. | $3,000 |
| Jul 11, 2014 | Completed final sign-off Mar 2015 | 2411 19th Av | revision to app#201310229943. to change location of bathroom door and provde ceiling framing. n/a for the maher ordinance #155=13Details
revision to app#201310229943. to change location of bathroom door and provde ceiling framing. n/a for the maher ordinance #155=13 | $10,000 |