S C Anderson Group International Inc.
- Based in
- Bakersfield
- On San Francisco permits
- Feb 2011 to Dec 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 17 completed, 1 in progress, 5 never finaled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 2 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 458 Castro St | partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection.Details
partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection. | $60,000 |
| Dec 16, 2011 | Never finaled issued Dec 2011, no final | 333 Taylor St | replace/install sheetrock in stair will due to damage from water leak on the 6th floor. 2-hr fire rated. area of work(s) stair will - basement to the 6th floor.Details
replace/install sheetrock in stair will due to damage from water leak on the 6th floor. 2-hr fire rated. area of work(s) stair will - basement to the 6th floor. | $6,500 |