Back to bathroom remodel contractors
S C Anderson Group International Inc.
- Based in
- Bakersfield
- On San Francisco permits
- Feb 2011 to Dec 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 17 completed, 1 in progress, 5 never finaled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 1 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2024 | In progress issued Apr 2024 | 1545 Broadway | unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit.Details
unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit. | $30,000 |
| Nov 19, 2018 | Completed final sign-off Aug 2021 | 119 Steiner St | unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other unitsDetails
unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other units | $185,972 |
| Jan 31, 2014 | Completed final sign-off May 2014 | 28 Bellair Pl | 5/8 sheetrock drywall patch & paint due to water damage on both levels. electrical & plumbing code upgrade to 2 bathrooms, 2 laundry rooms, new sub panel, water heatersDetails
5/8 sheetrock drywall patch & paint due to water damage on both levels. electrical & plumbing code upgrade to 2 bathrooms, 2 laundry rooms, new sub panel, water heaters | $25,000 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 254 Montana St | siding repair lower 3' on side & rear elevations. bathroom-drywall, paint, install (n) vanity & toilet & vinyl floor tiles.Details
siding repair lower 3' on side & rear elevations. bathroom-drywall, paint, install (n) vanity & toilet & vinyl floor tiles. | $15,000 |