Back to kitchen remodel contractors
S C Anderson Group International Inc.
- Based in
- Bakersfield
- On San Francisco permits
- Feb 2011 to Dec 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 17 completed, 1 in progress, 5 never finaled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 2 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2024 | In progress issued Apr 2024 | 1545 Broadway | unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit.Details
unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit. | $30,000 |
| Nov 19, 2018 | Completed final sign-off Aug 2021 | 119 Steiner St | unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other unitsDetails
unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other units | $185,972 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | redo (e) kitchen - no change to the floor plan of (ex) locations of appliances & fixtures/no wall to be removed. new counter tops - granite installed - sd per code. new angle stop valves. new sound barrier flooring (e) receptacles and smoke detectors brought up the code. n/a maher ord. # 155-13Details
redo (e) kitchen - no change to the floor plan of (ex) locations of appliances & fixtures/no wall to be removed. new counter tops - granite installed - sd per code. new angle stop valves. new sound barrier flooring (e) receptacles and smoke detectors brought up the code. n/a maher ord. # 155-13 | $40,000 |
| Mar 27, 2013 | Completed final sign-off Oct 2013 | 165 Madrone Av | repair damaged drywall, remove existing kitchen cabinets, plumbing under counter liting & appliances. install new cabinets, counter tops, hardwood floor, appliances, painting, remove kitchen & island sink, lighting shall comply with title 24Details
repair damaged drywall, remove existing kitchen cabinets, plumbing under counter liting & appliances. install new cabinets, counter tops, hardwood floor, appliances, painting, remove kitchen & island sink, lighting shall comply with title 24 | $23,000 |
| Sep 29, 2011 | Completed final sign-off Nov 2011 | 227 07th St | minor fire damage in kitchen of unit 506. no structural work to be performed in units 506,406,306 hallway 5th fl water damage repairDetails
minor fire damage in kitchen of unit 506. no structural work to be performed in units 506,406,306 hallway 5th fl water damage repair | $32,000 |