Ryan And Ryan Construction Inc
- Based in
- South San Franciso
- On San Francisco permits
- Apr 2006 to May 2026
- Last 24 months
- 9 permits filed
99 permits since 2000: 57 completed, 9 in progress, 23 never finaled, 10 expired or cancelled.
Of the 23 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 20 completed, 4 in progress, 7 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2026 | Completed final sign-off Sep 2026 | 4007 22nd St | level 3: bathroom and kitchen remodel, in kind. level 2: bedroom and ceiling - insulation and partial dry wall on ceiling. living room replace plaster wall.Details
level 3: bathroom and kitchen remodel, in kind. level 2: bedroom and ceiling - insulation and partial dry wall on ceiling. living room replace plaster wall. | $35,000 |
| Feb 11, 2025 | In progress issued Apr 2025 | 151 Alice B Toklas Pl | demolition and remodel of kitchen an two bathroomsDetails
demolition and remodel of kitchen an two bathrooms | $150,000 |
| Dec 9, 2024 | Completed final sign-off Mar 2025 | 699 Pennsylvania Av | bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9Details
bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9 | $9,000 |
| Dec 6, 2024 | In progress issued Dec 2024 | 699 Pennsylvania Av | bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.Details
bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like. | $9,000 |
| Jul 2, 2024 | In progress issued Jul 2024 | 2115 San Jose Av | living, dining, kitchen and bathroom install new insualtion and drywall. kitchen cabinets, baseboards. same for same. no mep work or wall or layout changes.Details
living, dining, kitchen and bathroom install new insualtion and drywall. kitchen cabinets, baseboards. same for same. no mep work or wall or layout changes. | $100,000 |
| Mar 1, 2024 | In progress issued Mar 2024 | 95 Red Rock Wy | unit: 210m; bathroom remodel, same for same. hardie board. tile up to date plumbing code if needed.Details
unit: 210m; bathroom remodel, same for same. hardie board. tile up to date plumbing code if needed. | $5,000 |
| Aug 11, 2021 | Never finaled issued Aug 2021, no final | 573 Naples St | smoke damage, electrical, drywall, plumbing - ktichen and bath repairs. remove and replace in kind.Details
smoke damage, electrical, drywall, plumbing - ktichen and bath repairs. remove and replace in kind. | $175,000 |
| Aug 11, 2021 | Never finaled issued Aug 2021, no final | 575 Naples St | fire damage, electrical, drywall, framing, plumbing - ktichen and bath repairs. remove and replace in kind.Details
fire damage, electrical, drywall, framing, plumbing - ktichen and bath repairs. remove and replace in kind. | $175,000 |
| Jul 21, 2021 | Never finaled issued Jul 2021, no final | 474 Orizaba Av | bathroom: new drywalls on walls only, new shower drain, shower faucet, toilet, sink faucet, new shower membrane, tile walls, enclosure and floor. kitchen new lower cabinet, sink and sink faucet.Details
bathroom: new drywalls on walls only, new shower drain, shower faucet, toilet, sink faucet, new shower membrane, tile walls, enclosure and floor. kitchen new lower cabinet, sink and sink faucet. | $8,500 |
| Feb 24, 2020 | Completed final sign-off Nov 2020 | 1016 Lake St | water damange reair: replace drywall on ceiling of bathroom, new shower / tub diverter, new tub, tile surround. reinstall (e) vanity new toilet.Details
water damange reair: replace drywall on ceiling of bathroom, new shower / tub diverter, new tub, tile surround. reinstall (e) vanity new toilet. | $6,800 |
| Sep 28, 2017 | Completed final sign-off Dec 2017 | 649 Darien Wy | bathroom remodel, new insulation wall ceiling, new tub shower/tub faucet, 20 amp circuit, exhaust with light, 3 led recessed light, toilet vanity with faucet shower tile floor, tile 1/2 dry wall & add to comply with 200232363Details
bathroom remodel, new insulation wall ceiling, new tub shower/tub faucet, 20 amp circuit, exhaust with light, 3 led recessed light, toilet vanity with faucet shower tile floor, tile 1/2 dry wall & add to comply with 200232363 | $14,500 |
| May 3, 2017 | Never finaled issued May 2017, no final | 1 Lobos St | remodel:bath: new insul r13-r30. new drywall, new shower faucet vanity, sink, faucet, toilet, 2 exhaust fan. 2.4 led light outlet switches, new shower tile enclosed. kitchen:new 120amp circuit, new cabinet, sink faucet, garbage disp, new appliances. new elec circuits for appliances. drywall patches.Details
remodel:bath: new insul r13-r30. new drywall, new shower faucet vanity, sink, faucet, toilet, 2 exhaust fan. 2.4 led light outlet switches, new shower tile enclosed. kitchen:new 120amp circuit, new cabinet, sink faucet, garbage disp, new appliances. new elec circuits for appliances. drywall patches. | $34,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 2044 14th Av | 2nd level shower new waterproof and tile, new vanity new counter, faucet. 1st level 1/2 bathroom new insulation drywall. re-install (e) toilet and vanityDetails
2nd level shower new waterproof and tile, new vanity new counter, faucet. 1st level 1/2 bathroom new insulation drywall. re-install (e) toilet and vanity | $13,000 |
| Dec 19, 2016 | Completed final sign-off May 2017 | 71 Rossmoor Dr | bathroom remodel: new tile new electric, new plumbing,new drywall,new retrofit window,no change on walls.Details
bathroom remodel: new tile new electric, new plumbing,new drywall,new retrofit window,no change on walls. | $12,500 |
| Nov 10, 2016 | Completed final sign-off Jun 2017 | 100 Melrose Av | one bathroom remodel, like for like. replace toilet, sink, faucet, shower valve, tile, & drywall(on walls only), 3 plugs & 5 switches, 4 cam lights, 1 20amp circuit.Details
one bathroom remodel, like for like. replace toilet, sink, faucet, shower valve, tile, & drywall(on walls only), 3 plugs & 5 switches, 4 cam lights, 1 20amp circuit. | $15,000 |
| Jun 8, 2016 | Completed final sign-off Sep 2016 | 2327 38th Av | remodel bathroom: upgrade electrical, plumbing and exhaust. no structural changes.Details
remodel bathroom: upgrade electrical, plumbing and exhaust. no structural changes. | $8,700 |
| Apr 28, 2015 | Completed final sign-off Nov 2015 | 101 Lombard St | unit 11: fix water damange; no walls moved, retile shower, new diverter, retile bathroom floor, drywall & installation on back side of bathroom from water damage, hot mop / water proofing.Details
unit 11: fix water damange; no walls moved, retile shower, new diverter, retile bathroom floor, drywall & installation on back side of bathroom from water damage, hot mop / water proofing. | $15,000 |
| Dec 29, 2014 | Completed final sign-off Apr 2015 | 116 Downey St | unit 2 - remodel existing bathroom - new tile on shower, new vanity, sink, new toilet, upgrade; electrical & plumbing to newest codeDetails
unit 2 - remodel existing bathroom - new tile on shower, new vanity, sink, new toilet, upgrade; electrical & plumbing to newest code | $12,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 556 Scott St | replace tile bathroom, toilet, vanity, sink faucet; add one gfic outlet, bathroom on 1st flrDetails
replace tile bathroom, toilet, vanity, sink faucet; add one gfic outlet, bathroom on 1st flr | $16,000 |
| Sep 22, 2014 | Completed final sign-off Dec 2014 | 780 14th St | bathroom remodel, remove tile, toilet, bath/shower, vanity sink, install drywall - tile - toilet, bath/shower, vanity.sink. no change on walls.Details
bathroom remodel, remove tile, toilet, bath/shower, vanity sink, install drywall - tile - toilet, bath/shower, vanity.sink. no change on walls. | $15,738 |
| Aug 5, 2014 | Completed final sign-off Dec 2014 | 1305 Laguna St | kitchen - remove cabinets, sheetrock, add plugs and switches - replace same. bathroom - remove toilet, vanity, tub/shower, tile floor - replace same; electrical - new sub panel (same layout on both)Details
kitchen - remove cabinets, sheetrock, add plugs and switches - replace same. bathroom - remove toilet, vanity, tub/shower, tile floor - replace same; electrical - new sub panel (same layout on both) | $14,000 |
| Oct 31, 2013 | Completed final sign-off Jul 2014 | 1281 Filbert St | remodel kitchen, add toilet at extg bath, add sink at extg toilet room, relocate furnace to laundry room, reconfigure walls at entry closet, add 2 tube skylights. all work is at 4th floor. maher ordinance # 155-13 does not applyDetails
remodel kitchen, add toilet at extg bath, add sink at extg toilet room, relocate furnace to laundry room, reconfigure walls at entry closet, add 2 tube skylights. all work is at 4th floor. maher ordinance # 155-13 does not apply | $43,000 |
| Sep 13, 2013 | Completed final sign-off Jul 2014 | 2931 Fillmore St | unit a- remodel bathroom "as is" (no removal or moving walls); to comply with cec 150(k) 6Details
unit a- remodel bathroom "as is" (no removal or moving walls); to comply with cec 150(k) 6 | $12,500 |
| Jun 17, 2013 | Completed final sign-off Aug 2013 | 216 Ewing Tr | legalize bathroom in garage, existing waste lines, new dry wall electrical, sink toiletDetails
legalize bathroom in garage, existing waste lines, new dry wall electrical, sink toilet | $7,500 |
| Mar 6, 2013 | Never finaled issued Mar 2013, no final | 54 Mcallister St | work in units 403, 404, 405: repair/replace drywall/dry rot in all units. remodel kitchens and bathrooms all units. rewire all units. no new walls. no new windows. in-kind repair.Details
work in units 403, 404, 405: repair/replace drywall/dry rot in all units. remodel kitchens and bathrooms all units. rewire all units. no new walls. no new windows. in-kind repair. | $90,000 |
| Feb 7, 2013 | Completed final sign-off May 2013 | 201 Granville Wy | remodel bath room, replace shower pan, toilet, lavatory. fixtures to reamin same. lighting shall be high efficiency or controlled by manuel on sensors. no change in walls and opening layout, bathroom is on upper level.Details
remodel bath room, replace shower pan, toilet, lavatory. fixtures to reamin same. lighting shall be high efficiency or controlled by manuel on sensors. no change in walls and opening layout, bathroom is on upper level. | $9,400 |
| Jan 10, 2013 | Completed final sign-off Aug 2013 | 216 Ewing Tr | remove & replace cabinets & drywall in kitchen. remodel upstairs bathroom only.Details
remove & replace cabinets & drywall in kitchen. remodel upstairs bathroom only. | $50,000 |
| Nov 21, 2012 | Expired or cancelled expired Jul 2014 | 54 Macondray Ln | replace plaster, shower pan bath fan lightDetails
replace plaster, shower pan bath fan light | $5,000 |
| Aug 9, 2011 | Completed final sign-off Dec 2011 | 2674 17th Av | bathroom remodel hallway. insulation drywall toilet, sink shower valve, hot mop.Details
bathroom remodel hallway. insulation drywall toilet, sink shower valve, hot mop. | $21,000 |
| Mar 21, 2011 | Expired or cancelled cancelled Aug 2011 | 1942 Alemany Bl | kitchen: insulation, drywall re-install cabinets, sink, faucets, flooring. no dish washer. bathroom: insulation, drywall, shower unit. bedroom: insulation, drywall, floor coverigs. no framing, no plumbing or elecrical, non structure work under this permit.Details
kitchen: insulation, drywall re-install cabinets, sink, faucets, flooring. no dish washer. bathroom: insulation, drywall, shower unit. bedroom: insulation, drywall, floor coverigs. no framing, no plumbing or elecrical, non structure work under this permit. | $12,500 |
| Oct 18, 2010 | Completed final sign-off Mar 2011 | 1755 Filbert St | cosmetic - paint, drywall, insulation, carpet, tile. all new drywall will be 5/8 x rated. master bedroom ceiling, wall. master bathroom ceiling & wall. additional plans and permit may be required at discretion of building inspector.Details
cosmetic - paint, drywall, insulation, carpet, tile. all new drywall will be 5/8 x rated. master bedroom ceiling, wall. master bathroom ceiling & wall. additional plans and permit may be required at discretion of building inspector. | $4,100 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 4096 17th St | bathroom: new shower tile, new shower diverton & finish trimDetails
bathroom: new shower tile, new shower diverton & finish trim | $3,500 |
| Nov 3, 2008 | Completed final sign-off May 2009 | 439 Brussels St | renovate bathroom, new circuits, lights and recepatacle at lower level.new dedicated circuit for laundry. add new recess lighting, reframe wall on the interior . add new p/t mud sills, remove a seperation wall between 2 rooms, install exterior doorDetails
renovate bathroom, new circuits, lights and recepatacle at lower level.new dedicated circuit for laundry. add new recess lighting, reframe wall on the interior . add new p/t mud sills, remove a seperation wall between 2 rooms, install exterior door | $30,000 |