Back to kitchen remodel contractors
Rubio Construction
- Based in
- Benicia
- On San Francisco permits
- Feb 2011 to Nov 2024
- Last 24 months
- 3 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 in progress. Typically 5 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2024 | In progress issued Oct 2024 | 2727 Santiago St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $21,200 |
| Mar 29, 2024 | Completed final sign-off May 2024 | 1215 Greenwich St | to comply with nov 202419102, for kitchen remodel: replace exist'g cabinets and counterops & replace exist'g faucet. cabinets, sinks, faucet replaced in kind. no new wall & no exist'g wall relocation . new lighting shall comply with cec 150.0(k)3.Details
to comply with nov 202419102, for kitchen remodel: replace exist'g cabinets and counterops & replace exist'g faucet. cabinets, sinks, faucet replaced in kind. no new wall & no exist'g wall relocation . new lighting shall comply with cec 150.0(k)3. | $3,000 |
| Jul 16, 2020 | Completed final sign-off Dec 2023 | 848 Cole St | to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ftDetails
to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ft | $2,500 |
| Jan 10, 2020 | Completed final sign-off Oct 2024 | 1192 Diamond St | adu per ord #95-17. include living room & kitchen.Details
adu per ord #95-17. include living room & kitchen. | $3,500 |
| May 5, 2017 | Completed final sign-off Dec 2017 | 1642 47th Av | remodel (e) kitchen, replace counter, cabinets fixture. remove partial (e) interior wall & upgrade partial ceiling. all work 2nd floorDetails
remodel (e) kitchen, replace counter, cabinets fixture. remove partial (e) interior wall & upgrade partial ceiling. all work 2nd floor | $18,000 |
| Nov 10, 2016 | Completed final sign-off Jan 2017 | 201 Topeka Av | remodel kitchen, install basic plumbing, new electrical, new cabinets.Details
remodel kitchen, install basic plumbing, new electrical, new cabinets. | $12,000 |
| Oct 28, 2016 | Completed final sign-off Nov 2016 | 1730 48th Av | remove walls between living room and kitchen on 2nd floorDetails
remove walls between living room and kitchen on 2nd floor | $2,000 |
| Jun 15, 2016 | Completed final sign-off Oct 2016 | 1870 44th Av | remodel existing kitchen - add recess lights, light plumbing light framingDetails
remodel existing kitchen - add recess lights, light plumbing light framing | $15,000 |
| Apr 6, 2016 | Completed final sign-off Sep 2016 | 442 Ellsworth St | kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgradeDetails
kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgrade | $60,000 |
| Feb 26, 2016 | Completed final sign-off Apr 2017 | 4036 Moraga St | remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/hDetails
remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/h | $60,000 |
| Jun 6, 2014 | Completed final sign-off Oct 2015 | 1514 29th Av | remodel existing kitchen and bath on 2nd fl.Details
remodel existing kitchen and bath on 2nd fl. | $20,000 |
| Feb 11, 2011 | Completed final sign-off Dec 2011 | 1547 Lake St | 3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door locatedDetails
3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door located | $15,000 |