Rubio Construction
- Based in
- Benicia
- On San Francisco permits
- Feb 2011 to Nov 2024
- Last 24 months
- 3 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2024 | In progress issued Nov 2024 | 2727 Santiago St | install insulation at 1/f and lower floor storage. install drywall, repair any damaged framing (interior). demo before doing things listed above. repair in kind.Details
install insulation at 1/f and lower floor storage. install drywall, repair any damaged framing (interior). demo before doing things listed above. repair in kind. | $10,000 |
| Oct 30, 2024 | In progress issued Oct 2024 | 2727 Santiago St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $21,200 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 208 Lake Merced Hill St North St | remodel bathroom in kind- remove and replace w/ new vanity cabinet tub shower controls and fixtures. install new bath vent, install new switches and outlets, install new insulation where applicable.Details
remodel bathroom in kind- remove and replace w/ new vanity cabinet tub shower controls and fixtures. install new bath vent, install new switches and outlets, install new insulation where applicable. | $15,000 |
| Mar 29, 2024 | Completed final sign-off May 2024 | 1215 Greenwich St | to comply with nov 202419102, for kitchen remodel: replace exist'g cabinets and counterops & replace exist'g faucet. cabinets, sinks, faucet replaced in kind. no new wall & no exist'g wall relocation . new lighting shall comply with cec 150.0(k)3.Details
to comply with nov 202419102, for kitchen remodel: replace exist'g cabinets and counterops & replace exist'g faucet. cabinets, sinks, faucet replaced in kind. no new wall & no exist'g wall relocation . new lighting shall comply with cec 150.0(k)3. | $3,000 |
| Jul 7, 2021 | Completed final sign-off Feb 2022 | 247 Otsego Av | remodel existing ground floor bonus room to provide full bath (e) bonus room park of (e) garage & share share egress with garage. existing 2nd and 3rd fl to remain. no scope of work. building is unsprinklered, remodel to be unsprinklered.Details
remodel existing ground floor bonus room to provide full bath (e) bonus room park of (e) garage & share share egress with garage. existing 2nd and 3rd fl to remain. no scope of work. building is unsprinklered, remodel to be unsprinklered. | $45,000 |
| Jul 16, 2020 | Completed final sign-off Dec 2023 | 848 Cole St | to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ftDetails
to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ft | $2,500 |
| Jan 10, 2020 | Completed final sign-off Oct 2024 | 1192 Diamond St | adu per ord #95-17. include living room & kitchen.Details
adu per ord #95-17. include living room & kitchen. | $3,500 |
| May 2, 2019 | Completed final sign-off Jun 2019 | 1679 21st Av | to obtain final inspection for work approved under pa# 201312164262, 201305217448, & 9508376. all work is complete.Details
to obtain final inspection for work approved under pa# 201312164262, 201305217448, & 9508376. all work is complete. | |
| Jul 11, 2018 | Completed final sign-off Nov 2018 | 2107 Bay Shore Bl | remove damaged stucco & framing in garage, reframe approc 6 ft restuccoDetails
remove damaged stucco & framing in garage, reframe approc 6 ft restucco | $28,000 |
| Oct 27, 2017 | Completed final sign-off Aug 2021 | 266 Curtis St | renew pa# 201505045326 to start and complete framing.Details
renew pa# 201505045326 to start and complete framing. | $2,000 |
| May 26, 2017 | Completed final sign-off Jun 2017 | 2339 Ocean Av | demo partial interior walls that were added by previous tenant. non-load partition wall.Details
demo partial interior walls that were added by previous tenant. non-load partition wall. | $2,500 |
| May 5, 2017 | Completed final sign-off Dec 2017 | 1642 47th Av | remodel (e) kitchen, replace counter, cabinets fixture. remove partial (e) interior wall & upgrade partial ceiling. all work 2nd floorDetails
remodel (e) kitchen, replace counter, cabinets fixture. remove partial (e) interior wall & upgrade partial ceiling. all work 2nd floor | $18,000 |
| Nov 10, 2016 | Completed final sign-off Jan 2017 | 201 Topeka Av | remodel kitchen, install basic plumbing, new electrical, new cabinets.Details
remodel kitchen, install basic plumbing, new electrical, new cabinets. | $12,000 |
| Oct 28, 2016 | Completed final sign-off Feb 2017 | 1730 48th Av | add a full bathroom at 1st floorDetails
add a full bathroom at 1st floor | $10,000 |
| Oct 28, 2016 | Completed final sign-off Nov 2016 | 1730 48th Av | remove walls between living room and kitchen on 2nd floorDetails
remove walls between living room and kitchen on 2nd floor | $2,000 |
| Jun 15, 2016 | Completed final sign-off Oct 2016 | 1870 44th Av | remodel existing kitchen - add recess lights, light plumbing light framingDetails
remodel existing kitchen - add recess lights, light plumbing light framing | $15,000 |
| Apr 6, 2016 | Completed final sign-off Sep 2016 | 442 Ellsworth St | kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgradeDetails
kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgrade | $60,000 |
| Feb 26, 2016 | Completed final sign-off Apr 2017 | 4036 Moraga St | remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/hDetails
remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/h | $60,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2017 | 4036 Moraga St | demolish interior drywall, on top floor only, etc. re-install drywall with 5/8" type "x" sheetrock.Details
demolish interior drywall, on top floor only, etc. re-install drywall with 5/8" type "x" sheetrock. | $5,000 |
| Jun 6, 2014 | Completed final sign-off Oct 2015 | 1514 29th Av | remodel existing kitchen and bath on 2nd fl.Details
remodel existing kitchen and bath on 2nd fl. | $20,000 |
| May 2, 2014 | Completed final sign-off May 2014 | 385 Eddy St | install grab bars in all common area water closets, lavatories, & bathing facilities to comply with ordinance 029-13 (301,505j, 1002 (g) hc), to comply with nov 201454461Details
install grab bars in all common area water closets, lavatories, & bathing facilities to comply with ordinance 029-13 (301,505j, 1002 (g) hc), to comply with nov 201454461 | $3,000 |
| Dec 16, 2013 | Completed final sign-off Jun 2019 | 1679 21st Av | revise previous permit no. 2013-05-21-7448. replace (e) window to (n) windows are non- visible from sidewalk. revise (e) 4x12 collector to new 3-2x10 (with 5/8" @ 36" o.o staggerDetails
revise previous permit no. 2013-05-21-7448. replace (e) window to (n) windows are non- visible from sidewalk. revise (e) 4x12 collector to new 3-2x10 (with 5/8" @ 36" o.o stagger | |
| May 21, 2013 | Completed final sign-off Jun 2019 | 1679 21st Av | interior remodel at 2nd floor & 1st floor-additional habitable space, all work to be done within (e) boundary of building. added 1 family room, 1 bedroom, 2 bathrooms on garage level & 1 bedroom on main levelDetails
interior remodel at 2nd floor & 1st floor-additional habitable space, all work to be done within (e) boundary of building. added 1 family room, 1 bedroom, 2 bathrooms on garage level & 1 bedroom on main level | $40,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2012 | 235 West Portal Av | change of use from existing retail space to tutoring service "b", (approx 1320 sq ft) on first floor of a commercial bldg. addition of restroom.Details
change of use from existing retail space to tutoring service "b", (approx 1320 sq ft) on first floor of a commercial bldg. addition of restroom. | $16,500 |
| Feb 11, 2011 | Completed final sign-off Dec 2011 | 1547 Lake St | 3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door locatedDetails
3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door located | $15,000 |