Back to bathroom remodel contractors
Rubio Construction
- Based in
- Benicia
- On San Francisco permits
- Feb 2011 to Nov 2024
- Last 24 months
- 3 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 in progress. Typically 22 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2024 | In progress issued Oct 2024 | 2727 Santiago St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $21,200 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 208 Lake Merced Hill St North St | remodel bathroom in kind- remove and replace w/ new vanity cabinet tub shower controls and fixtures. install new bath vent, install new switches and outlets, install new insulation where applicable.Details
remodel bathroom in kind- remove and replace w/ new vanity cabinet tub shower controls and fixtures. install new bath vent, install new switches and outlets, install new insulation where applicable. | $15,000 |
| Jul 7, 2021 | Completed final sign-off Feb 2022 | 247 Otsego Av | remodel existing ground floor bonus room to provide full bath (e) bonus room park of (e) garage & share share egress with garage. existing 2nd and 3rd fl to remain. no scope of work. building is unsprinklered, remodel to be unsprinklered.Details
remodel existing ground floor bonus room to provide full bath (e) bonus room park of (e) garage & share share egress with garage. existing 2nd and 3rd fl to remain. no scope of work. building is unsprinklered, remodel to be unsprinklered. | $45,000 |
| Jul 16, 2020 | Completed final sign-off Dec 2023 | 848 Cole St | to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ftDetails
to comply w/ n.o.v 2020034594. kitchen 211 sq ft and 2 bathrooms remodel. replace in-kind. common bath 49 sq ft, master bath 65 sq ft | $2,500 |
| Oct 28, 2016 | Completed final sign-off Feb 2017 | 1730 48th Av | add a full bathroom at 1st floorDetails
add a full bathroom at 1st floor | $10,000 |
| Apr 6, 2016 | Completed final sign-off Sep 2016 | 442 Ellsworth St | kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgradeDetails
kitchen and bathroom remodel: replacing all cabinets. replace bathroom fixtures, tiles, and flooring. kitchen and bathroom wall and electrical upgrade | $60,000 |
| Feb 26, 2016 | Completed final sign-off Apr 2017 | 4036 Moraga St | remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/hDetails
remodel kitchen and bathroom, construct a rear deck at 2nd floor. legalize a bedroom and a full bathroom and a family room at 1st flr. replace water heater with tankless w/h | $60,000 |
| Jun 6, 2014 | Completed final sign-off Oct 2015 | 1514 29th Av | remodel existing kitchen and bath on 2nd fl.Details
remodel existing kitchen and bath on 2nd fl. | $20,000 |
| May 21, 2013 | Completed final sign-off Jun 2019 | 1679 21st Av | interior remodel at 2nd floor & 1st floor-additional habitable space, all work to be done within (e) boundary of building. added 1 family room, 1 bedroom, 2 bathrooms on garage level & 1 bedroom on main levelDetails
interior remodel at 2nd floor & 1st floor-additional habitable space, all work to be done within (e) boundary of building. added 1 family room, 1 bedroom, 2 bathrooms on garage level & 1 bedroom on main level | $40,000 |
| Feb 11, 2011 | Completed final sign-off Dec 2011 | 1547 Lake St | 3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door locatedDetails
3rd fl: remodel 1 full bath, 1 1/2 bath, recessed lighting in bedrooms, hallway, living room, kitchen, entry way lighting. subpanel in unit sufficient to support new load. new central heating and ducts. remove non load bearing wall (approx 5') install pocket door where existing door located | $15,000 |